ONS-2014-160, Emergency Plan Implementing Procedure, Revision 2014-027

From kanterella
Jump to navigation Jump to search
Emergency Plan Implementing Procedure, Revision 2014-027
ML15009A043
Person / Time
Site: Oconee  Duke Energy icon.png
Issue date: 01/05/2015
From: Batson S
Duke Energy Carolinas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
ONS-2014-160, FOIA/PA-2016-0071
Download: ML15009A043 (47)


Text

Scott L.Batson Vice President

~ENERGY, Oconee NuclearStation Duke Energy ONO1VP 17800 Rochester Hwy Seneca, SC 29672 ONS-2014-160 o: 864.873.3274 f 864.873. 4208 Scott.Batson@duke-energy.com January 5, 2015 10 CFR 50.54(q)

Attn: Document Control Desk U.S. Nuclear Regulatory Commission 11555 Rockville Pike Rockville, Maryland 20852-2746

Subject:

Duke Energy Carolinas, LLC Oconee Nuclear Station, Units 1, 2, and 3 Docket Nos. 50-269, -270, and -287 Emergency Plan Implementing Procedure Revision 2014-027 Please find attached for your use and review copies of the enclosed revision along with the associated supporting documentation and 10 CFR 50.54(q) evaluation. This procedure is an Emergency Plan Implementing Procedure.

This revision is being submitted in accordance with 10 CFR 50.54(q) and does not reduce the effectiveness of the Emergency Plan or the Emergency Plan Implementing Procedures. Ifthere are any questions or concerns pertaining to this revision please call Pat Street, Emergency Preparedness Manager, at 864-873-3124.

By copy of this letter, a copy of this revision is being provided to the NRC, Region II, Atlanta, Georgia.

Sincerely, Scott L. Batson Vice President Oconee Nuclear Station Attachments:

Emergency Plan Implementing Procedure Revision 10 CFR 50.54(q) Evaluation(s) www.duke-energy.com

ONS-2014-160 U. S. Nuclear Regulatory Commission January 5, 2015 xc: w/2 copies of attachments Mr. Victor McCree, Regional Administrator U.S. Nuclear Regulatory Commission - Region II Marquis One Tower 245 Peachtree Center Ave., NE, Suite 1200 Atlanta, GA 30303-1257 w/copy of attachments Mr. James R. Hall, Project Manager U. S. Nuclear Regulatory Commission One White Flint North Mailstop O-8G9A 11555 Rockville Pike Rockville, MD 20852-2738 (send via E-mail) w/o attachments Mr. Eddy Crowe NRC Senior Resident Inspector Oconee Nuclear Station ELL EC2ZF

December 4, 2014 OCONEE NUCLEAR STATION

SUBJECT:

Emergency Plan Implementing Procedures Volume C Revision 2014-027 Please make the following changes to the Emergency Plan Implementing Procedures, Volume C:

REMOVE INSERT Cover Sheet Rev. 2014-026 Cover Sheet Rev. 2014-027 Table of Contents Table of Contents Pages 1, 2, & 3 Pages 1, 2, & 3 RP/O/AI1000/002 Rev 006 RP/O/A/1 000/002 Rev 007 Pat Street ONS Emergency Planning Manager

,,*DUKEENERGYa OCONEE NUCLEAR STATION EMERGENCY PLAN IMPLEMENTING PROCEDURES VOLUME C APPROVED:

Terry L.4J0atterson Director Nuclear Org Effectiveness

,*g /i6/f ,

Date Approved VOLUME C REVISION 2014-027 December 2014

VOLUME C TABLE OF CONTENTS SH/O/B/2005/001 Emergency Response Offsite Dose Projections Rev. 006 SH/O/B/2005/002 Protocol for the Field Monitoring Coordinator Rev. 005 During Emergency Conditions HPO/B/I1009/018 Off-Site Dose Projections Rev. 023 HP/0/B/1009/020 Estimating Food Chain Doses Under Post- Rev. 005 Accident Conditions HP/O/B/I1009/022 On-Shift Off-Site Dose Projections Rev. 013 HP/O/B/I1009/023 Radiation Protection Emergency Response Rev. 000 HP/O/B/1009/026 Environmental Monitoring For Emergency Rev. 000 Conditions RP/O/A/1000/001 Emergency Classification Rev. 001 RP/O/AI1 000/002 Control Room Emergency Coordinator Procedure Rev. 007 RP/OIA/1 000/003 A ERDS Operation Rev. 000 RP/O/AI1 000/009 Procedure For Site Assembly Rev. 002 RP/O/A/1000/010 Procedure For Emergency Rev. 001 Evacuation/Relocation Of Site Personnel RP/O/A/1000/015 A Offsite Communications From The Control Room Rev. 002 RP/O/A/1000/015 B Offsite Communications From The Technical Rev. 001 Support Center RP/O/A/1000/016 MERT Activation Procedure For Medical, Rev. 001 Confined Space, and High Angle Rescue Emergencies RP/O/A/1000/017 Spill Response Rev. 003 RP/O/A/1000/018 Core Damage Assessment Rev. 000 RP/O/A/1000/019 Technical Support Center Emergency Rev. 006 Coordinator Procedure I Revision 2014-027 December 2014

VOLUME C TABLE OF CONTENTS RP/0/A/1 000/022 Procedure For Major Site Damage Assessment Rev. 001 And Repair RP/O/AI1 000/024 Protective Action Recommendations Rev. 002 RP/O/A/1 000/02 7 Re-Entry Recovery Procedure Rev. 001 RP/O/A/1 000/028 Nuclear Communications Emergency Response Rev. 001 Plan RP/O/A/1 000/029 Fire Brigade Response Rev. 001 RP/OIA/1 000/031 Joint Information Center Emergency Response Rev. 001 Plan RP/O/A/1 000/035 Severe Weather Preparations Rev. 001 RP/O/A/1 000/036 Equipment Important to Emergency Response Rev. 001 RP/O/AI1 000/037 Incident Command Post (ICP) Operations and Rev. 002 Radiation Protection Liaison Guidelines SRIO/A/2000/001 Standard Procedure For Corporate Rev. 000 Communications Response To The Emergency Operations Facility SRIO/B/2000/002 Standard Procedure for EOF Services Rev. 006 SRIO/AI2000/003 Activation of the Emergency Operations Facility Rev. 003 SR/O/A/2000/004 Notification to States and Counties from the Rev. 000 Emergency Operations Facility for Catawba, McGuire, and Oconee Business Business Management Emergency Plan Rev. 012 Management SSG Functional SSG Emergency Response Plan - ONS Specific Rev. 008 Area Directive 102 SCD - 110 Supply Chain Directive 110 - SCO Emergency Rev. 004 Response Plan Engineering Engineering Emergency Response Plan Rev. 032 Manual 5.1 Human Resources ONS Human Resources Emergency Plan 10/13/2004 Procedure 2 Revision 2014-027 December 2014

VOLUME C TABLE OF CONTENTS Radiation Off-Site Dose Assessment And Data Evaluation Rev. 001 Protection Section Manual 11.3 Safety Assurance Emergency Response Organization Rev. 007 Directive 6.1 Safety Assurance Emergency Contingency Plan Rev. 006 Directive 6.2 Training Division Oconee Training Division Training Standard Rev. 018 DTS-007 3 Revision 2014-027 December 2014

Duke Energy Procedure No.

Oconee Nuclear Station RP/O/A/1000/002 Control Room Emergency Coordinator Procedure Revision No.

007 Electronic Reference No.

OP009A64 PERFORMANCE I PDF Format Compare with Control Copy every 14 calendar days while work is being performed.

Compared with Control Copy* Date Compared with Control Copy* Date Compared with Control Copy* Date Date(s) Performed Work Order/Task Number (WO#)

COMPLETION I El Yes [] NA Checklists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?

[:1 Yes [I NA Required enclosures attached?

[] Yes D] NA Charts, graphs, data sheets, etc. attached, dated, identified, and marked?

E] Yes [] NA Calibrated Test Equipment, if used, checked out/in and referenced to this procedure?

El Yes 0J NA Procedure requirements met?

Verified By* Date Procedure Completion Approved* Date

  • PrintedName and Signature Remarks (attach additionalpages, if necessary)

IMPORTANT: Do NOT mark on barcodes. Printed Date: *12/02/2014*

Enclosure No.: *FULL* I111111 lil 111111111111 11111111111111111111 l11111 liIINl I11111111II11111111 111111111111 INRevision No.: *007*

1111111i1111111111 vs1o-I* "

Procedure No.: *RP/0/A/1000/002*

111111111 1111111111111 li 1111111111111111111111111111111 ii IN 11111111111M i 11111 iM iNli

RP/O/A/1000/002 Page 2 of 10 Control Room Emergency Coordinator Procedure NOTE: This procedure is an implementing procedure to the Oconee Nuclear Site Emergency Ph and must be:

1. Reviewed in accordance with 10CFR50.54(q) prior to approval.
2. Forwarded to Emergency Preparedness within seven (7) working days of approval.
1. Symptoms 1.1 Events have occurred requiring activation of the Oconee Nuclear Site Emergency Plan.
2. Immediate Actions NOTE:
  • State and County agencies shall be notified within 15 minutes of E-plan declaration, Classification upgrades, and Protective Action Recommendations.
  • For an outside line dial "9" and for long distance dial "1".

I 2.1 IF an EAL exists, Declare the appropriate Emergency Classification level.

Classification (UE, Alert, SAE, GE)

Time Declared:

2.2 IF A Security event is in progress, THEN GO TO Step 2.4.

RP/O/A/1000/002 Page 3 of 10 NOTE: e For an unusual event classification, or for events with NO EAL classifications, activation of ERO personnel is at the discretion of the SM.

  • Qualified Individual can be any person qualified to use ERONS.
  • If a "bridges" or "alternate TSC/OSC" page needs to be sent out, it will be done during the follow-up page.

2.3 IF ERO has NOT yet been activated AND ERO activation is needed, perform the following:

2.3.1 Circle the applicable initial notification code below.

EAL Notification Codes (see Enclosure 4.11 for descriptions) classification DRILL EMERGENCY None Fla NOUE Dla Ela Alert D2a E2a SAE D3a E3a GE D4a E4a 2.3.2 IF a qualified individual is available to notify the ERO, provide the circled notification code above to a qualified individual and direct them to begin Enclosure 4.10 (Activation of the Emergency Response Organization).

2.4 Direct Control Room Offsite Communicator(s) to perform the following:

  • Record Name

" REFER TO RP/0/A/1000/015A (Offsite Communications From The Control Room), Immediate Actions steps 2.1 and 2.2 AND Enclosure 4.7 (Guidelines for Manually Transmitting a Message) in preparation for notifying offsite agencies.

{13}

2.5 IAAT Changing plant conditions require an emergency classification upgrade, THEN Notify Offsite Communicator to complete in-progress notifications per RP/0/A/1000/15A (Offsite Communications From The Control Room),

AND Start a new clean copy of this procedure for the upgraded classification AND stop working on this copy, noting the time in your log that each new copy started.

RP/O/AI1000/002 Page 4 of 10 NOTE: If more than one EAL of the classification level is met, use the EAL description of most interest to offsite agencies. Use "Remarks" (Line 13 of Notification Form) for additional comments from other EAL descriptions that the offsite agencies may need to know.

Additional message sheets listing other information of interest to offsite agencies (e.g. transporting injured personnel) may be sent, if needed.

2.6 Obtain the applicable Offsite Notification form in the control room and complete as follows:

2.6.1 Ensure EAL # as determined by RP/O/A/1000/001 matches Line 4.

2.6.2 Line 1 - Mark appropriate box "Drill" or "Actual Event" 2.6.3 Line 1 - Enter Message #

2.6.4 Line 2 - Mark Initial 2.6.5 Line 6 - A. Mark "Is Occurring" if any of the following are true:

  • RIAs 40, 45, or 46 are increasing or in alarm

" If containment is breached

" Containment pressure > 1 psig B. Mark "None" if none of the above is applicable.

2.6.6 Line 7 - If Line 6 Box B or C is marked, mark Box D. Otherwise mark Box A.

2.6.7 Line 8 - Mark "Stable" unless an upgrade or additional PARs are anticipated within an hour.

  • Refer to Enclosure 4.8 (Event Prognosis Definitions) 2.6.8 Line 10 - Military time and date of declaration (Refer to date/time in Step 2.1)

RP/O/A/1000/002 Page 5 of 10 NOTE: 1. The following step is used to help determine if an event includes only one unit or all units. The list may not be all inclusive.

2. The following is provided by the SM.

2.6.9 Line 11 - Evaluate the following for classification for all units.

" Security event

  • Seismic event

" Tornado on site

" Hurricane force winds on site

" SSF event

" Fire affecting shared safety related equipment Mark or select ALL if event affects the emergency classification on more than one unit.

If event only affects one (1) unit OR one (1) unit has a higher emergency class, select or mark the appropriate unit.

2.6.10 Line 12 - Mark unit(s) affected (reference Line 11) AND enter percent power for each unit affected. {14 }

9 If affected unit is shutdown, then enter shutdown time and date.

NOTE: Line number 13 should be used to provide information important to offsite agencies.

The following are examples of information which should be provided:

  • Time that fires are extinguished

" Offsite fire departments have been requested to assist with a fire onsite

  • The type of natural event which had affected the site (i.e. tornado, seismic, etc.)

" Notification that a radiologically contaminated patient has been transported offsite

" The dam or dike which has resulted in a Condition Bravo or Alpha, if known

" Status of a security threat against the site if known 2.6.11 Line 13 - If the SM has no remarks, write "None"

RP/O/A/I1000/002 Page 6 of 10 2.6.12 If Condition "A" exists ensure following PARs are included on Line 5.

A. Evacuate: Move residents living downstream of the Keowee Hydro Project dams to higher ground.

B. Other: Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed.

2.6.13 Line 17 - SM signature, CURRENT Time/Date NOTE: e GETS cards are available in the GETS Binder located in the TSC Supply Cabinet.

Their use will enable communications when phone lines are busy or overloaded.

See instructions on back of card.

" For communication failures, see RP/0/A/1000/015A (Offsite Communications From The Control Room), Enclosure 4.9 (Alternate Method and Sequence to Contact Agencies).

" Satellite Telephones are available in all Control Rooms, the TSC and the OSC.

They can be used when other means of communication have failed.

" Only an Initial and a Termination Message are required for Unusual Event classifications. No follow-up notifications (updates) are required unless requested by Offsite Agencies.

2.7 Provide Offsite Communicator with Emergency Notification Form and direct him/her to perform RP/O/A/1000/015A (Offsite Communications From The Control Room). Verify Notifications to State and Counties are completed within 15 minutes.

2.8 Ensure step 2.3.2 has been completed.

2.9 Make PA announcement regarding classification (see Enclosure 4.1).

2.10 IAAT The Hydro Group notifies the Control Room that Condition A, Imminent or Actual Dam failure (Keowee or Jocassee) OR Condition B at Keowee exists or applies, THEN REFER TO Enclosure 4.2 (Condition A/ Condition B Response Actions) for additional protective actions.

AND After the State (SC) and Counties (Oconee and Pickens) have been notified, ENSURE that notification is made to the following:

El Georgia Emergency Management Agency 404-635-7000 or 7200 Li National Weather Service 864-879-1085 or 800-268-7785

RP/O/A/I 000/002 Page 7 of 10 NOTE: Activation of the ERO is NOT required for an Unusual Event Classification.

2.11 IF This is an Unusual Event, AND The SM/Emergency Coordinator does NOT desire that any part of the ERO be activated, THEN GO TO Step 2.15.

NOTE: Activate the TSC and/or OSC Backup Emergency Response Facility (ERF) in the Oconee Office Building, Rooms 316 and 316A, if a fire in the Turbine Building, flooding conditions, Security events (except those involving intrusion/attempted intrusion), or onsite/offsite hazardous materials spill have occurred or are occurring. {4}{ 16}

2.12 Notify Security Shift Supervisor (Ext. 2309 or 3636) that the ERO is being activated and obtain his/her recommendations for conducting a site assembly should it be needed.

NOTE: This step is required in addition to action taken in step 2.3. {13 }

ERONS Notification Codes are grouped by EAL. ERONS Emergency Notifications begin on page 1 of Enclosure 4.11. ERONS Drill Notifications begin on page 3 of Enclosure 4.11.

Activation of the ERO during Condition B is done to allow adequate time for the TSC to assess the need to relocate B.5.b equipment in the event of an anticipated upgrade to a Condition A.

Qualified Individual can be any person qualified to use ERONS.

2.13 Direct activation of the Emergency Response Organization (ERO) by performing the following:

2.13.1 Determine the appropriate ERONS notification code from Enclosure 4.11 (ERONS Notification Codes and Titles).

2.13.2 Provide the notification code identified above to a qualified individual and direct them to perform Enclosure 4.10 (Activation of the Emergency Response Organization). {8}

2.14 Implement Enclosure 4.4 (SM Emergency Coordinator Turnover Sheet).

RP/O/A/1000/002 Page 8 of 10 NOTE: Enclosure 4.6 (Radiation Monitoring) may be used to help determine if RIA values, Dose Projections, or Field Monitoring surveys require a classification Upgrade and Protective Action Recommendation.

2.15 IAAT Abnormal radiation levels or releases are occurring or have occurred, THEN Perform the following:

Notify RP to perform Offsite Dose Calculations, determine Protective Action Recommendations, and initiate radiological field monitoring.

REFER TO Enclosure 4.6 (Radiation Monitoring) to determine if RIA values, Dose Projections, or analysis of Field Monitoring Surveys require a classification Upgrade and Protective Action Recommendation.

2.16 Perform one of the following:

2.16.1 Direct a qualified individual to perform Enclosure 4.3 (Emergency Coordinator Parallel Actions):

" Record Name:

" Notify individual appointed that a Security event (Does/Does Not) exist and a Site Assembly (Is/Is Not) desired 2.16.2 Perform Enclosure 4.3 (Emergency Coordinator Parallel Actions).

2.17 IAAT A Site Assembly needs to be initiated, THEN Initiate Site Assembly per RP/0/A/1000/009 (Procedure for Site Assembly).

3. Subsequent Actions 3.1 IAAT An Unusual Event classification is being terminated, THEN REFER TO Enclosure 4.5 (Emergency Classification Termination Criteria) of this procedure for termination guidance.

3.1.1 Verify that the Offsite Communicator has provided termination message to the off-site agencies.

RP/O/A/1000/002 Page 9 of 10 NOTE: The EP Section shall develop a written report, for signature by the Site Vice President, to the State Emergency Management Agency, Oconee County EPD, and Pickens County EPD within 24 working hours of the event termination.

3.1.2 Notify Emergency Preparedness Section (Emergency Planning Duty person after hours) of the following:

" The Unusual Event has been terminated

" Conduct a critique following termination of an actual Unusual Event NOTE: 9 After normal working hours, Emergency Response Personnel will NOT report to the TSC or OSC until after a Security threat has been neutralized. Emergency Response personnel will report to the Oconee JIC (Alternate Facility) during Security events.

  • If the ERO was activated and a Security event involving an intrusion/attempted intrusion DOES NOT exist, then provide turnover to the Technical Support Center.
  • If the ERO was activated after normal working hours AND a Security Event involving an intrusion/attempted intrusion DOES exist, then provide Notification turnover information to the EOF Director. After the EOF is activated, the EOF will assume responsibility for classifications, notifications, and protective action recommendations. The SM will remain the Emergency Coordinator for all other activities until the TSC is activated.

3.2 IAAT The TSC or EOF is ready to accept turnover, THEN Perform one of the following as required:

3.2.1 IF The TSC is ready to accept Emergency Coordinator responsibilities, THEN Perform turnover using Enclosure 4.4 (SM Emergency Coordinator Turnover Sheet).

Time TSC Activated:

A. Turn over all emergency response procedures in use to the TSC.

B. Direct all available Auxiliary Operators (AOs) to report to the OSC to support damage repair efforts.

RP/O/A/1000/002 Page 10 of 10 NOTE: The EOF Director will notify the Control Room Emergency Coordinator when the EOF is operational and ready to initiate turnover.

3.2.2 IF The EOF is ready to initiate turnover information, THEN Verify notification turnover information from the EOF Director:

___ A. Fax Enclosure 4.4 (SM Emergency Coordinator Turnover Sheet).

__ B. Obtain current copy of Emergency Notification Form and plant status.

__ C. Verify the information being provided by the EOF Director from Enclosure 4.4 and the current Emergency Notification Form.

D. WHEN Control Room Emergency Coordinator verification of Notification turnover information from EOF Director is complete AND the EOF is activated, turnover Notification responsibility to the EOF and log:

Time EOF Activated:

E. Direct NRC Communicator to notify the NRC Operations Center that the EOF is activated.

4. Enclosures 4.1 Plant Public Address Announcements 4.2 Condition A/ Condition B Response Actions 4.3 Emergency Coordinator Parallel Actions 4.4 SM Emergency Coordinator Turnover Sheet 4.5 Emergency Classification Termination Criteria 4.6 Radiation Monitoring 4.7 Summary of IAAT Steps 4.8 Event Prognosis Definitions 4.9 References 4.10 Activation of the Emergency Response Organization 4.11 ERONS Notification Codes and Titles

Enclosure 4.1 RP/O/A/I 000/002 Plant Public Address Announcements Page 1 of 1

1. Select from the following and announce over the Plant Public Address System:

___Drill Message:

Attention all site personnel. This is (name). I am the Emergency Coordinator.

This is a drill. This is a drill.

  • As of - (time declared), a(n) (emergency classification) has been declared for Unit(s) _ (affected unit(s)).

" Plant condition for Unit(s) - (affected unit(s)) is (stable, degrading, improving, what has happened, etc.).

  • IF A release has occurred or is suspected AND/OR a site assembly has been activated THEN Announce the following:

No eating or drinking until the area is cleared by RP.

THIF TSC/OSC activation is necessary AND TSC/OSC has not yet been activated THEN Announce one of the following, as applicable:

Activate the TSC/OSC Activate the Backup TSC/OSC Emergency Message:

Attention all site personnel. This is _(name). I am the Emergency Coordinator.

This is an emergency message.

As of - (time declared), a(n) (emergency classification) has been declared for Unit(s) _ (affected unit(s)).

  • Plant condition for Unit(s) _ (affected unit(s)) is

_ (stable, degrading, improving, what has happened, etc.).

  • IF A release has occurred or is suspected AND/OR a site assembly has been activated THEN Announce the following:

No eating or drinking until the area is cleared by RP.

  • IF TSC/OSC activation is necessary AND TSC/OSC has not yet been activated THEN Announce one of the following, as applicable:

Activate the TSC/OSC Activate the Backup TSC/OSC

Enclosure 4.2 RP/O/A/1000/002 Condition A/ Condition B Response Actions Page 1 of 3

1. Condition A Response - Immediate Actions NOTE: The Hydro Group will notify the Control Room/SM when Condition A/B conditions apply.

Condition A - Failure is Imminent or Has Occurred - A failure at the dam has occurred or is about to occur and minutes or days may be allowed to respond dependent upon the proximity to the dam. (Keowee or Jocassee)

Condition B - Potentially Hazardous Situation is Developing - A situation where failure may develop, but preplanning actions taken during certain events (major floods, earthquakes) may prevent or mitigate failure. (Keowee) 1.1 IF Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee) exists.

THEN Perform the following actions:

1.1.1 Provide the following Protective Action Recommendations to Oconee County and Pickens County for imminent/actual dam failure.

NOTE: State and County Agencies shall be notified within 15 minutes of Protective Action Recommendations.

A. Provide the following recommendation for Emergency Notification Form Section 5 (B) Evacuate: Move residents living downstream of the Keowee Hydro Project dams to higher ground.

B. Provide the following recommendation for Emergency Notification Form Section 5 (E) Other: Prohibit traffic flow across bridges identified on your inundation maps until the danger has passed.

1.2 IF Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee) exist, THEN Notify the following after the State and Counties are notified:

El Georgia Emergency Management agency 404-635-7000 or 7200 El National Weather Service 864-879-1085 or 800-268-7785

2. Condition A Response - Subsequent Actions 2.1 Notify Hydro Central and provide information related to the event.

2.1.1 REFER TO Page 5 of the Emergency Telephone Directory, Keowee Hydro Project Dam/Dike Notification. {2}

Enclosure 4.2 RP/O/A/1000/002 Condition A/ Condition B Response Actions Page 2 of 3 2.2 Relocate Keowee personnel to the Operational Support Center (OSC) if events occur where their safety could be affected.

__ 2.2.1 IF Keowee personnel are relocated to the OSC, THEN Notify Hydro Central at 704-382-6836 or 6838 or 6839.

A. REFER TO Page 5 of the Emergency Telephone Directory, 2 Keowee Hydro Project Dam/Dike Notification. {2}

NOTE: A loss of offsite communications capabilities (Selective Signaling and the Wide Area Network - WAN) could occur within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> after Keowee Hydro Dam failure.

Rerouting of the Fiber Optic Network through Bad Creek should be started as soon as possible.

2.3 Notify Telecommunications Group in Charlotte to begin rerouting the Oconee Fiber Optic Network.

2.3.1 REFER TO Selective Signaling Section of the Emergency Telephone Directory (page 13).

2.4 Request Security to alert personnel at the Security Track/Firing Range and Building 8055 (Warehouse #5) to relocate to work areas inside the plant.

NOTE:

  • Plant access road to the Oconee Complex could be impassable within 1.5 hours5.787037e-5 days <br />0.00139 hours <br />8.267196e-6 weeks <br />1.9025e-6 months <br /> if the Keowee Hydro Dam fails. A loss of the Little River Dam (Newry Dam) or Dikes A-D will take longer to affect this road.
  • PA Announcements can be made by the Control Room using the Office Page Override feature or Security.

2.5 Make a PA Announcement to relocate personnel at the following locations to the World Of Energy/Operations Training Center.

Oconee Complex Oconee Garage Oconee Maintenance Training Facility 2.6 Dispatch operators to the SSF and establish communications.

Enclosure 4.2 RP/O/A/1000/002 Condition A/ Condition B Response Actions Page 3 of 3 2.7 Initiate the following actions for a Condition A for Keowee OR Jocassee:

2.7.1 Direct SPOC to initiate relocation of Appendix R equipment and Hale Fire Pump to the ISFSI or Elevated Water Storage Tank areas.

2.7.2 Notify Security Supervision to be prepared to relocate Security Officers due to flooding within the protected area and to waive security requirements as needed to support relocation of Appendix R equipment and Hale Fire Pump.

2.7.3 Recall off shift Operations personnel to assist with shutdown of operating units.

2.8 GO TO Enclosure 4.3 (Emergency Coordinator Parallel Actions) Step 1.11.

3. Condition B Response - Immediate Actions 3.1 IF Condition B at Keowee exists, THEN Notify the following after the State and Counties are notified:

El Hydro Central 704-382-6836 El Georgia Emergency Management Agency 404-635-7000 or 7200 El National Weather Service 864-879-1085 or 800-268-7785 3.2 GO TO Enclosure 4.3 (Emergency Coordinator Parallel Actions) Step 1.11.

Enclosure 4.3 RP/O/A/1000/002 Emergency Coordinator Parallel Actions Page 1 of 4

1. Emergency Coordinator Parallel Actions 1.1 IAAT Changing plant conditions require an emergency classification upgrade, THEN Re-start with a clean copy of this enclosure and stop the current copy of the enclosure.

NOTE: An open line to the NRC may be required.

Notifications to the NRC are required within one (1) hour of declaration of the emergency classification level.

1.2 Direct an SRO to make notifications to the NRC.

CR NRC Communicator (SRO) Name 1.3 Direct the CR NRC Communicator to complete the OMP 1-14 NRC Event Notification Worksheet and Plant Status Sheet.

NOTE: The NRC Communicator is responsible for activating ERDS.

Activating ERDS is NOT required for an Unusual Event classification.

1.4 Direct the CR NRC Communicator to start the Emergency Response Data System (ERDS) for units(s) involved, within one (1) hour of an emergency classification of Alert or higher. REFER TO RP/O/A/1000/003A (ERDS Operation).

NOTE: Notifications per AD-LS-ALL-0006 (Notification/Reportability Evaluation) for 10CFR50.72 require ALL reportable items that are met or exceeded to be reported in addition to the NRC Event Notification Worksheet and Plant Status Sheet required within 1 hour1.157407e-5 days <br />2.777778e-4 hours <br />1.653439e-6 weeks <br />3.805e-7 months <br /> of the event declaration.

1.5 IAAT Plant conditions require NRC notification under 10CFR50.72, THEN Direct the CR NRC Communicator to provide this notification using the guidance in OMP 1-14 (Notifications).

1.6 IF The Emergency Response Organization is NOT needed to assist with the Unusual Event emergency activities, AND Personnel accountability is NOT desired, THEN GO TO Step 1.8.

Enclosure 4.3 RP/O/A/1000/002 Emergency Coordinator Parallel Actions Page 2 of 4 WARNING: Conducting Site Assembly during a Security Event may NOT be prudent. I 1.7 IAAT The SM directs that a Site Assembly be initiated, THEN Initiate Site Assembly per RP/0/A/1000/009 (Procedure For Site Assembly).

1.8 IAAT Any Area Radiation Monitor is increasing or is in ALARM, OR Steam Line Break has occurred, THEN Contact shift RP to dispatch onsite monitoring teams.

1.9 IF This is a General Emergency, THEN Initiate evacuation of all non-essential personnel from the site after personnel accountability has been reached. REFER TO RP/0/A/1000/010 (Procedure for Emergency Evacuation/Relocation of Site Personnel).

1.10 IAAT If notified by the Hydro Group that Condition A Imminent or Actual Dam Failure (Keowee or Jocassee),

OR Condition B (Keowee) exists, THEN REFER TO Enclosure 4.2 (Condition A/ Condition B Response Actions) for additional PAR and/or response actions.

1.11 IAAT Major damage has occurred or is occurring, THEN Initiate RP/0/A/1000/022 (Procedure for Major Site Damage Assessment and Repair) and/or RP/0/A/1000/029 (Fire Brigade Response - OSC).

1.12 IAAT A Security Event is in progress, THEN Verify that the 15 minute notification for the Security event has been made to the NRC. {12}

1.13 IAAT A hazardous substance has been released, THEN Initiate RP/0/A/1000/017 (Spill Response).

Enclosure 4.3 RP/O/A/1000/002 Emergency Coordinator Parallel Actions Page 3 of 4 NOTE: Priority should be placed on providing treatment for the most life-threatening event (i.e., medical versus radiation exposure - OSC procedure RP/O/B/1000/01 1 (Planned Emergency Exposure)). The Emergency Coordinator may authorize (either verbal or I signature) exposures greater than 25 rem TEDE (Total Effective Dose Equivalent) for life saving missions.

1.14 IAAT A medical response is required, THEN Initiate RP/O/A/1000/016 (MERT Activation Procedure For Medical, Confined Space and High Angle Rescue Emergencies).

1.14.1 Document verbal approval of Planned Emergency Exposures required for life saving missions in the Control Room Emergency Coordinator Log.

S.

CAUTION: Use of the Outside Air Booster Fans during a Security Event may introduce incapacitating agents in the Control Room.

I I

NOTE: The Outside Air Booster Fans (Control Room Ventilation System - CRVS) are used to provide positive pressure in the Control Room to prevent smoke, toxic gases, or radioactivity from entering the area as required by NUREG-0737.

I Chlorine Monitor Alarm will either stop the Air Booster Fans or will not allow them to start.

Items to consider for operation of the Outside Air Booster Fans: Security events, Smoke or toxic gases may enter the Control Room, RIA-39 in ALARM, Dose levels in CR/TSC/OSC 1.15 Evaluate operation of the Outside Air Booster Fans.

Enclosure 4.3 RP/O/A/1000/002 Emergency Coordinator Parallel Actions Page 4 of 4 NOTE: e 10CFR50.54(x) allows for reasonable actions that depart from a License Condition or Technical Specification to be performed in an emergency when this action is immediately needed to protect the health and safety of the public and no action consistent with the License Condition or Technical Specification that can provide adequate or equivalent protection is immediately apparent.

  • Implementation of Oconee Severe Accident Guidelines (OSAG) requires the use of 10CFR50.54 (x) and (y) provisions.

1.16 IAAT Plant conditions require a decision to implement 10CFR50.54(x),

THEN Perform the following Steps:

1.16.1 Document decision and actions taken in the affected unit's log.

1.16.2 Document decision and actions taken in the Emergency Coordinator Log.

NOTE: NRC must be notified of any 10CFR50.54(x) decisions and actions within one (1) hour.

1.16.3 Direct the CR NRC Communicator to report decision and actions taken to the NRC.

1.17 Ensure Site Assembly has been considered, is in progress, or complete. Refer to RP/0/A/1000/009 (Procedure for Site Assembly).

Enclosure 4.4 RP/O/A/1000/002 SM Emergency Coordinator Turnover Sheet Page 1 of 1 Unit I Unit 2 Unit 3 Rx Power IRCS Pressure RCS Temp. Rx Power I RCS Pressure RCS Temp. Rx Power IRCS Pressure RCS emp.

Auxiliary Power From ES Channels Actuated Auxiliary Power From I ES Channels Actuated Auxiliary Power From ES Channels Actuated Jobs In Progress: Jobs In Progress: Jobs In Progress:

Major Equipment Out of Service: Major Equipment Out of Service: Major Equipment Out of Service:

ERDS Activated? Yes/No CR Booster Fans On? Yes/No ERDS Activated? Yes/No ERDS Activated? Yes/No CR Booster Fans On? Yes/No Abnormal/Emergency Procedures Currently In Progress Emergency Response Procedures in Progress Yes No List Any EOP/APs In Progress RP/O/A/1000/002 (Control Room Emergency Coordinator)

RP/0/A/1000/009 (Site Assembly)

RP/0/A/ 1000/010 (Emergency Evacuation/Relocation of Site Personnel)

RP/O/A/1000/0 16 (MERT Activation for Medical, Confined Space and High Angle Rescue Emergency)

RP/0/A/1000/017 (Spill Response)

RP/0/A/1000/022 (Major Site Damage Assessment and Repair)

RP/O/A/1000/029 (Fire Brigade Response - OSC)

Emergency Dose Limits for AP/EOP actions in effect?

IF Condition A, Dam Failure, has been declared for Keowee Hydro Project, THEN Provide the following information to the TSC Emergency Coordinator:

  • Status of Offsite Agency Notifications
  • Recommendations made to offsite agencies
  • Status of relocation of site personnel Status for answering 4911 emergency phone call: Remains in Control Room Responsibility of Ops in OSC Status of Site Assembly (Needed only if after hours, holidays, or weekends)

Time Next message is due to Offsite Agencies (Attach all completed Emergency Notification Forms)

I Emergency Coordinator/TSC SM Time of Turnover

Enclosure 4.5 RP/O/A/1000/002 Emergency Classification Termination Page 1 of 1 Criteria IF The following guidelines applicable to the present emergency condition have been met or addressed, THEN An emergency condition may be considered resolved when:

1. Existing conditions no longer meet the existing emergency classification criteria and it appears unlikely that conditions will deteriorate further.

__ 2. Radiation levels in affected in-plant areas are stable or decreasing to below acceptable levels.

3. Releases of radioactive material to the environment greater than Technical Specifications are under control or have ceased.
4. The potential for an uncontrolled release of radioactive material is at an acceptably low level.

__ 5. Containment pressure is within Technical Specification 3.6 requirements.

6. Long-term core cooling is available.
7. The shutdown margin for the core has been verified.

__ 8. A fire, flood, earthquake, or similar emergency condition is controlled or has ceased.

__ 9. Offsite power is available per Technical Specification requirements.

10. All emergency action level notifications have been completed.
11. Hydro Central has been notified of termination of Condition B for Keowee Hydro Project. {2}
  • REFER TO Page 5 of the Emergency Telephone Directory (Keowee Hydro Project Dam/Dike Notification). I
12. The Regulatory Compliance Section has evaluated plant status with respect to Technical Specifications and recommends Emergency classification termination.
13. Emergency terminated. Request the Control Room Offsite Communicator to DatedTime Initial complete an Emergency Notification Form for a Termination Message using guidance in RP/0/A/1000/015A (Offsite Communications From The Control Room) and provide information to offsite agencies.

S GO TO Step 3.1.

Enclosure 4.6 RP/0/A/1000/002 Radiation Monitoring Page I of I NOTE: Refer to the appropriate enclosures in RP/0/A/1000/001 (Emergency Classification) to determine the Emergency Classification.

Indication Value Reference Enclosure RIA-3 Valid High Alarm 4.3 RIA-6 Valid High Alarm 4.3 RIA-7 > 150 mRad/Hr 4.3 RIA-8 > 4200 mRad/Hr 4.3 RIA-10 > 830 mRad/Hr 4.3 RIA-11 > 210 mRad/Hr 4.3 RIA-12 > 800 mRad/Hr 4.3 RIA-13 > 650 mRad/Hr 4.3 RIA- 15 > 5000 mRad/Hr 4.3 RIA-16 is or has been in High or Alert alarm (>2.5 mR/Hr) N/A RIA-17 is or has been in High or Alert alarm (>2.5 mR/Hr) N/A RIA-33 > 4.06E06 cpm for > 60 minutes or in High Alarm 4.3 RIA-41 Valid High Alarm 4.3 RIA-45 > 1.33E06 cpm for > 60 minutes 4.3 RIA-46 > 2.09E04 cpm or > 2.09E05 or > 2.09E06 for > 15 minutes 4.3 RIA-49 Valid High Alarm 4.3 1,3RIA-57 > 1.0 R/Hr 4.1 2RIA-57 > 1.6 R/Hr 4.1 1,2,3RIA-58 > 1.0 R/Hr 4.1 RIA-57/58 > RP/0/A/1000/001 Encl. 4.8 values 4.3 Projected Dose Calculations > 100 mrem TEDE or > 500 mrem CDE Adult Thyroid at Site Boundary 4.3, 4.7 Analyzed Field Monitoring Surveys > 500 mrem CDE Adult Thyroid on one hour of inhalation 4.3 Field Monitoring Indications > 100 mRad/Hr at Site Boundary expected to continue for > one hour 4.3 Control Room, CAS, or Radwaste CR Radiation Levels Valid Reading > 15 mRad/Hr 4.3 Damaged Spent Fuel Storage Cask at ISFSI 1 R/Hr reading at 1 foot 4.3 Portable Monitor on Main or Spent Fuel Bridge Unplanned Valid Reading Increase or High Alarm 4.3 Liquid Release > SLC 16.11.1 values 4.3 Gaseous Release > SLC 16.11.2 values 4.3

Enclosure 4.7 RP/O/A/1000/002 Summary of IAAT Steps Page 1 of 1 IF AT ANY TIME:

Immediate Actions (2.5) changing plant conditions require an emergency classification upgrade...

(2.10) The Hydro Group notified the Control Room that Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee) or Condition B at Keowee exists...

(2.15) abnormal radiation levels or releases are occurring or have occurred...

(2.17) site assembly needs to be initiated...

Subsequent Actions (3.1) an Unusual Event classification is being terminated...

(3.2) the TSC or EOF is ready to accept turnover... .3 (Emergency Coordinator Parallel Actions)

(1.1) changing plant conditions require an emergency classification upgrade...

(1.5) plant conditions require NRC notification under 10CFR50.72...

(1.7) the SM directs that a Site Assembly be initiated...

(1.8) any Area Radiation Monitor is increasing or in ALARM, OR a Steam Line Break has occurred, (1.10) if notified by the Hydro Group that Condition A, Imminent or Actual Dam Failure (Keowee or Jocassee) OR Condition B (Keowee) exists...

(1.11) major damage has occurred OR is occurring...

(1.12) a Security Event is in progress...

(1.13) a hazardous substance has been released...

(1.14) a medical response is required...

(1.16) plant conditions require a decision to implement 10CFR50.54(x)...

Enclosure 4.8 RP/O/A/1000/002 Event Prognosis Definitions Page 1 of 1 The following definitions apply when determining Event Prognosis for completing line #8 on the Emergency Notification Form.

Degrading: Plant conditions involve at least one of the following:

" Plant parameters (ex. temperature, pressure, level, voltage, frequency) are trending unfavorably away from expected or desired values AND plant conditions could result in a higher classification or Protective Action Recommendation (PAR) before the next follow-up notification.

" Site conditions (ex. wind, ice/snow, ground tremors, hazardous/toxic/radioactive material leak, fire, Security event) impacting plant operations or personnel safety are worsening AND plant conditions could result in a higher classification or Protective Action Recommendation (PAR) before the next follow-up notification Improving: Plant conditions involve at least one of the following:

  • Plant parameters (ex. temperature, pressure, level, voltage, frequency) are trending favorably toward expected or desired values AND plant conditions could result in a lower classification or emergency termination before the next follow-up notification.
  • Site conditions (ex. wind, ice/snow, ground tremors hazardous/toxic/radioactive material leak, fire, Security event) have become less of a threat to plant operations or personnel safety AND plant conditions could result in a lower classification or emergency termination before the next follow-up notification.

Stable: Plant conditions are neither degrading nor improving. {10}

Enclosure 4.9 RP/O/A/1000/002 References Page 1 of 1

1. PIP 0-01-01395
2. PIP 0-01-03460
3. PIP 0-01-03696
4. PIP 0-02-01452
5. PIP 0-02-03705
6. PIP 0-04-06494
7. PIP 0-04-04755
8. PIP 0-04-07469
9. PIP 0-05-01642
10. PIP 0-05-03349
11. PIP 0-05-02980
12. PIP 0-05-04697
13. PIP 0-07-06549
14. PIP 0-08-01712
15. PIP 0-13-01001
16. PIP 0-12-03091

Enclosure 4.10 RP/O/A/1000/002 Activation of the Emergency Response Page 1 of 4 Organization

1. Instructions 1.1 Obtain the notification code(s) from the SM and record below:

Notification Code:

1.2 IF a security event is NOT in progress AND security can be reached at 6002, perform the following:

1.2.1 Notify Security at extension 6002 to activate ERO.

1.2.2 Provide Security with the notification code(s) recorded in Step 1.1.

1.2.3 Inform the Emergency Coordinator that Security has been notified to activate the TSC and OSC.

1.2.4 Exit this Enclosure.

NOTE: Only one person can be signed onto EverBridge at a time. If a second person logs onto EverBridge, the first person will be logged off.

1.3 IF a security event is in progress OR security CANNOT be reached at extension 6002, perform the following to activate the ERO:

1.3.1 IF AT ANY TIME the following steps CANNOT be accomplished, GO TO step 1.4.

NOTE: Login and Password can be obtained from the Password Card in the Control Room.

1.3.2 Obtain the Login Username and Password for EverBridge.

NOTE: Everbridge can be accessed by selecting either the EverBridge icon on the desktop, selecting ERONS from the DAE, or entering "manager.everbridge.net" without the quotations into the Internet Explorer address bar.

1.3.3 From a Duke Energy computer, open the EverBridge application.

1.3.4 On the Everbridge login page, enter the usemame (NOT case sensitive) and password (case sensitive) obtained in step 1.3.2 into the corresponding fields.

1.3.5 Click the "Sign-In" button.

Enclosure 4.10 RP/O/A/1000/002 Activation of the Emergency Response Page 2 of 4 Organization 1.3.6 Select "Proceed" on the "Welcome" screen in order to select the proper notification message.

1.3.7 Select the "Notification Templates" tab.

1.3.8 IF AT ANY TIME a message is sent in error AND the message must be retracted, repeat steps 1.3.9 - 1.3.14 with "C1" as the notification code.

NOTE: Steps 1.3.9 - 1.3.14 can be repeated for each code that is required to be sent.

1.3.9 Perform one of the following to locate the proper notification:

A. Type the "notification code" identified in step 1.1 into the search box and select "ENTER."

B. Select "Title" to sort Notifications alpha-numerically.

1.3.10 WHEN the proper notification has been found, select the checkbox of the desired notification number.

1.3.11 Select "Send".

1.3.12 WHEN the box labeled "Include the notification as part of an event?" appears, select the radio button for "No, send as individual notifications."

NOTE: Completion of the following step will cause the ERO notification to be sent.

1.3.13 Select "Send".

NOTE: The second verification below is done by selecting 'Active/History' in the EverBridge application, (If a rotating timer icon appears, refresh the screen) and selecting the hyperlinked title of the notification (s) initiated.

1.3.14 IF either of the following CANNOT be verified, notify the Emergency Coordinator and GO TO step 1.4.

Li An ERO notification call has been received in the Control Room 0 EverBridge has names listed under 'Contacts Name' heading in the appropriate archived history.

1.3.15 Inform the Emergency Coordinator that ERO has been activated per ERONS.

Enclosure 4.10 RP/O/A/1000/002 Activation of the Emergency Response Page 3 of 4 Organization 1.4 IF step 1.3 could NOT be completed successfully, perform the following to use the EverBridge Live Operator method to activate ERO:

1.4.1 IF AT ANY TIME the following CANNOT be completed, GO TO step 1.5.

1.4.2 Contact the EverBridge Live Operator by calling one of the following:

  • 9-1-877-220-4911
  • 9-1-818-230-9797 1.4.3 Note date and time of call initiation:

Tim/

Date / Time NOTE: It may be prudent to ask for a repeat-back of the Notification code provided to the EverBridge Live Operator to ensure the proper notification is sent.

1.4.4 Provide the following information to the EverBridge Live Operator when prompted:

Information Requested Response EverBridge Organization "Oconee Nuclear Station" Name username "ONSactivation" city or town of your birth "Charlotte" How may the Everbridge "I want to send a priority notification using a Operator help? Mass Notification Template."

Notification Title Provide Live Operator with only the code(s) of the notification to be sent. This can be obtained from step 1.1.

Is the broadcast ID "YES."

desired? Record the Broadcast ID:

1.4.5 Terminate phone call and record date and time of call completion:

1.4.6 IF ERO notification call has NOT been received in the Control Room, perform the following:

A. Notify the Emergency Coordinator B. GO TO to step 1.5.

Enclosure 4.10 RP/O/A/1000/002 Activation of the Emergency Response Page 4 of 4 Organization 1.4.7 Inform the Emergency Coordinator that ERO has been activated per ERONS.

1.5 IF ERO activation using ERONS is NOT successful, perform the following:

___ 1.5.1 Notify Security to activate ERO using the Nuclear Callout System.

1.5.2 Notify the SM that ERO activation using ERONS was unsuccessful and Security has been notified to use Nuclear Callout System.

Enclosure 4.11 RP/O/A/I1000/002 ERONS Notification Codes and Titles Page 1 of 4

1. General ERONS Notification Codes:

ACTIVATION ERROR Notification Title Description Code Cl CANCEL ACTIVATION To retract any ERONS message sent in error. This notifies the entire ERO.

2. Emergency ERONS Notification Codes:

Notification of Unusual Event (NOUE) - El Notification Title Description Code Ela ONS Emergency - ERO Activation - NOUE Activates the TSC, OSC, and EOF.

Elf ONS Emergency - Security Event - NOUE Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

Elg ONS Emergency - Security Event - Post Attack Security event under control. Activate the TSC and

- NOUE OSC.

Elh ONS Emergency - Bridges - NOUE Bridges may be affected. Activate the TSC, OSC, and EOF.

Eli ONS Emergency - TSC/OSC not available -

NOUE TSC/OSC is NOT available. Activate the Backup TSC/OSC. I ALERT - E2 Notification Title Description Code E2a ONS Emergency - ERO Activation - ALERT Activates the TSC, OSC, and EOF.

E2f ONS Emergency - Security Event - ALERT Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

E2g ONS Emergency - Security Event - Post Attack Security event under control. Activate the TSC and

- ALERT OSC.

E2h ONS Emergency - Bridges - ALERT Bridges may be affected. Activate the TSC, OSC, and EOF.

E2i ONS Emergency - TSC/OSC not available - TSC/OSC is NOT available. Activate the Backup ALERT TSC/OSC.

Enclosure 4.11 RP/O/A/1000/002 ERONS Notification Codes and Titles Page 2 of 4 Site Area Emergency (SAE) - E3 Notification Title Description Code E3a ONS Emergency - ERO Activation - SAE Activates the TSC, OSC, and EOF.

EM ONS Emergency - Security Event - SAE Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

E3g ONS Emergency - Security Event - Post Attack Security event under control. Activate the TSC and

- SAE OSC.

E3h ONS Emergency - Bridges - SAE Bridges may be affected. Activate the TSC, OSC, and EOF.

E3i ONS Emergency - TSC/OSC not available -

SAE TSC/OSC is NOT available. Activate the Backup TSC/OSC.

I General Emergency (GE) -.E4 Notification Title Description Code E4a ONS Emergency - ERO Activation - GE Activates the TSC, OSC, and EOF.

E4f ONS Emergency - Security Event - GE Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

E4g ONS Emergency - Security Event - Post Attack Security event under control. Activate the TSC and

- GE 0SC.

E4h ONS Emergency - Bridges - GE Bridges may be affected. Activate the TSC, OSC, and EOF.

E4i ONS Emergency - TSC/OSC unavailable - GE TSC/OSC is NOT available. Activate the Backup TSC/OSC.

EVENT TERMINATION - E6 itle Description Conditions have improved, the Emergency Response Organization may stand-down. NO further response required.

Enclosure 4.11 RP/O/A/1000/002 ERONS Notification Codes and Titles Page 3 of 4

3. Drill ERONS Notifications:

Notification of Unusual Event (NOUE) DRILL - Dl1 Notification Title Description Code Dla ONS Drill - ERO Activation- NOUE Activates the TSC, OSC, and EOF.

Dlf ONS Drill - Security Event - NOUE Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

Dig ONS Drill - Security Event - Post Attack - Security event under control. Activate the TSC and NOUE OSC.

Dlh ONS Drill - Bridges - NOUE Bridges may be affected. Activate the TSC, OSC, and EOF.

Dli ONS Drill - TSC/OSC unavailable - NOUE Oconee TSC/OSC is NOT available. Use the ONS Backup TSC/OSC.

ALERT DRILL - D2 Notification Title Description Code D2a ONS Drill - ERO Activation- ALERT Activates the TSC, OSC, and EOF.

D2f ONS Drill - Security Event - ALERT Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

D2g ONS Drill - Security Event - Post Attack - Security event under control. Activate the TSC and ALERT OSC.

D2h ONS Drill - Bridges - ALERT Bridges may be affected. Activate the TSC, OSC, and EOF.

D2i ONS Drill - TSC/OSC unavailable - ALERT Oconee TSC/OSC is NOT available. Use the ONS Backup TSC/OSC.

Site Area Emergency (SAE) DRILL - D3 Notification Title Description Code D3a ONS Drill - ERO Activation- SAE Activates the TSC, OSC, and EOF.

D3f ONS Drill - Security Event - SAE Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

D3g ONS Drill - Security Event - Post Attack - SAE Security event terminated. Activate the TSC and OSc.

D3h ONS Drill - Bridges - SAE Bridges may be affected. Activate the TSC, OSC, and EOF.

D3i ONS Drill - TSC/OSC unavailable - SAE Oconee TSC/OSC is NOT available. Use the ONS Backup TSC/OSC.

Enclosure 4.11 RP/O/A/1000/002 ERONS Notification Codes and Titles Page 4 of 4 General Emergency (GE) DRILL - D4 Notification Title Description Code D4a ONS Drill - ERO Activation- GE Activates the TSC, OSC, and EOF.

D4f ONS Drill - Security Event - GE Security event in progress. Activate the EOF only.

TSC and OSC personnel assemble off-site.

D4g ONS Drill - Security Event - Post Attack - GE Security event under control. Activate the TSC and OSC.

D4h ONS Drill - Bridges - GE Bridges may be affected. Activate the TSC, OSC, and EOF.

D4i ONS Drill - TSC/OSC unavailable - GE Oconee TSC/OSC is NOT available. Use the ONS Backup TSC/OSC. I STAFF AUGMENTATION DRILL- D6 Notification Title Description Code D6a ONS Augmentation Drill - TSC & OSC Only Activate the TSC and OSC.

D6b ONS Augmentation Drill - All Facilities Activates the TSC, OSC and EOF.

EVENT TERMINATION - D7 Notification Title Description Code D7a ONS Drill Termination Conditions have improved, the Emergency Response Organization may stand-down. NO further response required.

Revision/Change Package Fill-In Form Rev. 04/23/2012 The purpose of this fill-in form is to provide a location to type in information you want to appear on the various forms needed for Major/Minor Procedure Revisions, and Major/Minor Procedure Changes. After you type in information on this form, it will be electronically transferred to the appropriate locations in the attached forms when you perform Step 3 below.

Step 1- press [F 12] (Save As) then save this form using standard file name convention in appropriate LAN storage location.

Step 2-type in basic information in the blanks below:

Note: place cursor in center of brackets before typing.

1. ID No.: RP/0/A/1000/002
2. Revision No.: 007
3. Change No.: _ Note: if this package is for a change, replace hyphen with a letter.
4. Procedure

Title:

Control Room Emergency Coordinator Procedure

5. For changes only, enter procedureAections affected: __
6. Prepared By: Natalie Harness
7. Preparation Date: 11/20/2014
8. PCR Numbers Included in Revision: ONS-2014-5917 Step 3- go to Print Preview to update this information in all the attached documents.

Step 4- page down to affected pages and enter any additional information needed.

Step 5- when all information is entered, print package and review for correctness.

Form 703-1. Procedure Process Record (PPR)

(R08-10) Duke Energy (I) ID No. RP/0/A/1000/002 PROCEDURE PROCESS RECORD Revision No. 007 Page 2 of 5 PREPARATION (2) Station OCONEE NUCLEAR STATION (3) Procedure Title Control Room Emergency Coordinator Procedure (4) PreparedBy* Natalie Harness (Signature) 'V_ Pl 'V Date 11/20/2014 (5) Requires NSD 228 Applicability Determination?

F-1 Yes (New procedure or revision with major changes) - Attach NSD 28 documentation.

[ No (Revision with minor changes)

(6) Reviewed By**Th.n k. . K 4 JA 14 (QKI) Date /C-_-Lo_-_

Cross-Disciplinary Review By* / (QR)(KI) NA 6L4neate lf-J2zL-p Reactivity Mgmt Review By* (QR) NI.&Date -

Mgmt Involvement Review By* (Ops. Supt.) NA6*Dae --*/-.z f5 (7) Additional Reviews Reviewed By* Date Reviewed By* Date (8) Approved By* y (, CU*)

--- Date i4 ,

PERFORMANCE (Compare with control copy every 14 "ndnar days w k is being performed.)

(9) Compared with Control Copy* _ Date Compared with Control Copy* _ Date Compared with Control Copy* _ Date (10) Date(s) Performed Work Order Number (WO#)

COMPLETION (11) Procedure Completion Verification:

O Unit 0 El Unit 1 El Unit 2 El Unit 3 Procedure performed on what unit?

El Yes Dl NA Check lists and/or blanks initialed, signed, dated, or filled in NA, as appropriate?

El Yes Dl NA Required enclosures attached?

El Yes El NA Charts, graphs, data sheets, etc. attached, dated, identified, and marked?

El Yes Dl NA Calibrated Test Equipment, if used, checked out/in and referenced to this procedure?

El Yes Dl NA Procedure requirements met?

Verified By* Date (12) Procedure Completion Approved Date (13) Remarks (Attach additionalpages, if necessary)

  • PrintedName and Signature

RP/0/A/ 1000/002 Revision 007 - Change No.

Page 2 of 5 Procedure

Title:

Control Room Emergency Coordinator Procedure

SUMMARY

OF CHANGES: (DESCRIPTION AND REASON)

General Changes Revision 007 of RP/0/A/1000/002 consists of the following changes:

  • Many editorial changes made correcting grammatical and other editorial issues.

" Changed "Alternate" to "Backup Emergency Facility (ERF)" per NEI 13-01.

PCR Numbers Incorporated ONS-2014-5917 Enclosure

RP/0/A/1000/002 Revision 007 - Change No.

Page 3 of 5 Attachment to 50.54q RP/0/A/1000/002. Rev 007. Control Room Emergency Coordinator Procedure

  1. Page /Section Current Proposed Change Reason
1. Page 2 of 10 2. Forwarded to Emergency Planning 2. Forwarded to Emergency Preparedness Editorial:

Note section within seven (7) working days of within seven (7) working days of approval. Changed Planning Bullet 2 approval, to Preparedness

2. Page 6 of 10 Evacuate: Move residents living Evacuate: Move residents living Editorial: period 2.6.12 downstream of the Keowee Hydro downstream of the Keowee Hydro at the end of the Bullet A Project dams to higher ground Project dams to higher ground. sentence
3. Page 6 of 10 National Weather Service 864-879- National Weather Service 864-879-1085 or Editorial: remove 2.10 AND 1085 or 800-268-7785. 800-268-7785 period
4. Page 7 of 10 Activate the Alternate TSC and/or Activate the TSC and/or OSC Backup Editorial:

Note 2 OSC in the Oconee Office Building, Emergency Response Facility (ERF) in the Changed Rooms 316 and 316A, if a fire in the Oconee Office Building, Rooms 316 and "Alternate" to Turbine Building, flooding conditions, 316A, if a fire in the Turbine Building, Backup Security events (except those flooding conditions, Security events (except Emergency involving intrusion/attempted those involving intrusion/attempted Response Facility intrusion), or onsite/offsite hazardous intrusion), or onsite/offsite hazardous (ERF) per NEI materials spill have occurred or are materials spill have occurred or are 13-01 occurring. occurring.

5. Page 9 of 10 Notify Emergency Planning Section Notify Emergency Preparedness Editorial:

3.1.2 (Emergency Planning Duty person (Emergency Planning Duty person after Changed Planning after hours) of the following: hours) of the following: to Preparedness and removed "Section"

6. Page 9 of 10 After normal working hours, After normal working hours, Emergency Editorial:

Note 2 Emergency Response Personnel will Response Personnel will NOT report to the removed "Old NOT report to the TSC or OSC until after a Security threat has Clemson EOF" TSC or OSC until after a Security been neutralized. Emergency Response and replaced with threat has been neutralized, personnel will report to the Oconee JIC "Alternate Emergency Response personnel will (Alternate Facility) during Security events. Facility" report to the Oconee JIC (Old Clemson EOF) during Security events.

7. Enclosure 4.1 Activate the alternate TSC/OSC Activate the backup TSC/OSC Editorial:

Page 1 of 1 Changed alternate Drill Message to backup

8. Enclosure 4.1 Activate the alternate TSC/OSC Activate the backup TSC/OSC Editorial:

Page 1 of 1 Changed alternate Emergency to backup Message

9. Enclosure 4.2 ...protective action recommendations ...... Protective Action Recommendations... Editorial:

Page 1 of 3 capitalized 1.1.1 10 Enclosure 4.2 National Weather Service 864-879- National Weather Service 864-879-1085 or Editorial: remove Page 1 of 3 1085 or 800-268-7785. 800-268-7785 period 1.2 11 Enclosure 4.2 REFER TO Section 6 of the REFER TO Page 5 of the Emergency Editorial: change Page 1 of 3 Emergency Telephone Directory, Telephone Directory, Keowee Hydro Section 6 to Page 2.1.1 Keowee Hydro Project Dam/Dike Notification. 5 Project Dam/Dike Notification.

12 Enclosure 4.2 REFER TO Section 6 of the REFER TO Page 5 of the Emergency Editorial: change Page 2 of 3 Emergency Telephone Directory, Telephone Directory, Keowee Hydro Section 6 to Page 2.2.A Keowee Hydro Project Dam/Dike Notification. 5 Project Dam/Dike Notification.

RP/0/A/ 1000/002 Revision 007 Change No.

Page 4 of 5

  1. Page Current Proposed Change Reason

/Section

13. Enclosure Direct the CR NRC Communicator to Direct the CR NRC Communicator to Editorial: remove 4.3 Page 1 complete the OMP 1-14 NRC Event complete the OMP 1-14 NRC Event incorrect of 4 Notification Notification reference (located 1.3 Worksheet and Plant Status Sheet Worksheet and Plant Status Sheet. on OPS Web page (located on OPS Web page under under "Forms and "Forms and Reports").

Reports").

14. Enclosure Priority should be placed on providing Priority should be placed on providing Editorial:

4.3 treatment for the most life-threatening treatment for the most life-threatening event removed the Page 3 of 4 event (i.e., medical versus radiation (i.e., medical versus radiation exposure - comma Note 1 exposure - OSC procedure OSC procedure RP/0/B/1000/0 11(Planned RP/O/B/ 1000/011, (Planned Emergency Exposure)....

Emergency Exposure)....

15. Enclosure ...Control Room to prevent smoke, ...Control Room to prevent smoke, toxic Editorial: added a 4.3 toxic gases, or radioactivity from gases, or radioactivity from entering the hyphen between Page 3 of 4 entering the area as required by area as required by NUREG-0737. NUREG-0737 Note 2 NUREG 0737.
16. Enclosure 10CFR50.54(x) allows for reasonable I1OCFR50.54(x) allows for Editorial: bullet 4.3 actions that depart from a License reasonable actions that depart from items Page 4 of 4 Condition or a License Condition or Technical Note 1 Technical Specification to be Specification to be performed in an performed in an emergency when this emergency when this action is action is immediately immediately needed to protect the needed to protect the health and safety health and safety of the public and of the public and no action consistent no action consistent with the with the License Condition or Technical License Condition or Technical Specification that can provide Specification that can provide adequate or equivalent protection adequate or equivalent is immediately apparent.

protection is immediately apparent. I1OCFR50.54 (y) requires approval 10CFR50.54 (y) requires approval of of any 10CFR50.54(x) actions by any 10CFR50.54(x) actions by an an SRO at minimum. (Anyone SRO at more senior than the SRO may minimum. (Anyone more senior than approve.) Implementation of the SRO may approve.) Oconee Severe Accident Implementation of Oconee Severe Guidelines (OSAG) requires the Accident Guidelines (OSAG) requires use of the use of

17. Enclosure RP/0/A/1000/002 (Control Room RP/0/A/1000/002 (Control Room Editorial: place in 4.4 Emergency Coordinator) 0 Emergency Coordinator) ED sequential order:

Page 1 of 1 RP/0/A/1000/016 RP/0/A/1000/009 (Site Assembly) place table of (MERT Activation for Medical, RP/0/A/1000/010 (Emergency RP/0/A/1000/009 procedures Confined Space and High Angle Evacuation/Relocation of Site Personnel) & 010 under Rescue Emergency) RP/0/A/1000/016 RP/0/A/1000/002 RP/0/A/1000/017 (Spill Response) (MERT Activation for Medical, Confined RP/0/A/1000/022 (Major Site Damage Space and High Angle Rescue Emergency)

Assessment and Repair) RP/0/A/1000/017 (Spill Response)

RP/O/A/1000/029 (Fire Brigade RP/0/A/1000/022 (Major Site Damage Response - OSC) Assessment and Repair)

RP/0/A/1000/009 (Site Assembly) RP/0/A/1000/029 (Fire Brigade Response -

RP/0/A/1000/010 (Emergency OSC)

Evacuation/Relocation of Site Personnel)

RP/0/A/1000/002 Revision 007 - Change No. __

Page 5 of 5

  1. Page Current Proposed Change Reason

/Section

18. Enclosure (Needed only if after hours, holidays, (Needed only if after hours, holidays, or Editorial: add end 4.4 or weekends weekends) parenthesis to Page 1 of 1 sentence THEN
19. Enclosure REFER TO Section 6 of the REFER TO Page 5 of the Emergency Editorial: change 4.5 Emergency Telephone Directory Telephone Directory (Keowee Hydro Section 6 to Page Page 1 of 1 (Keowee Hydro Project Dam/Dike Notification). 5 THEN 11 Project Dam/Dike Notification).
20. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 1 of 4 backup Eli
21. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 1 of 4 backup E2i
22. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 2 of 4 backup E3i
23. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 2 of 4 backup E4i
24. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 3 of 4 backup Dli
25. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 3 of 4 backup D2i
26. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 3 of 4 backup D3i
27. Enclosure TSC/OSC is NOT available. Activate TSC/OSC is NOT available. Activate the Editorial: changed 4.11 the alternate TSC/OSC. backup TSC/OSC. alternate to Page 4 of 4 backup D4i

Form 703-2. Procedure Change Process Record (R08-10)

Duke Energy PROCEDURE CHANGE PROCESS RECORD (1) ID No. RP/O/A/1000/002 Revision No. 007 Change No.

Permanent/Restricted to (2) Station: OCONEE NUCLEAR STATION (3) Procedure

Title:

Control Room Emergency Coordinator Procedure (4) Section(s) of Procedure Affected: Pages 2-10, Enclosures 4.1, 4.2, 4.3, 4.4, 4.5, & 4.11 (5) Requires NSD 228 Applicability Determination?

F- Yes (Procedure change with major changes) - Attach NSD 228 documentation.

[4 No (Procedure change with minor changes)

(6) Description of Change: (Attach additionalpages, if necessary.)

Revision 007 of RP/O/A/1000/002 consists of the following changes:

  • Many editorial changes made correcting grammatical and other editorial issues.
  • Changed "Alternate" to "Backup Emergency Facility (ERF)" per NEI 13-01.

(7) Reason for Change:

Enhance oversight and clarity of procedure.

(8) Prepared By* Natalie Harness (Signature) Date 11/20/2014 (9) Reviewed By* 4QR)(I* Date /'-ao_-/y, Cross-Disciplinary Review By' (QR)(KI) NA4- Date //-,7-0 Reactivity Mgmt. Review By* (QR) NA 0,r-c.Date .- '

Mgmt. Involvement Review By* .(Ops. Supt.) NA k,4eDate tit z '

(10) Additional Reviews Reviewed By* -Date Reviewed By* Date (11) Approved By* 9izý_V_ýCa_ tý Date JitL (4

  • PrintedName and Signature

3.10 10CFR 50.54(q) Evaluations Emergency Planning Functional Area Manual Attachment 3.10.7.2

§50.54(q) Screening Evaluation Form Activity Description and

References:

RPIO/A/1000/002, Control Room Emergency Coordinator Procedure, Rev 007 See attached sheet for all changes pertaining to this procedure.

K< u; L(

Activity Scope: . ....  % "

Z The activity is a change to the emergency plan El The activity is not a change to the emergency plan Change Type: I t5K3 Change Type:

Z The change is editorial or typographical E' The change does conform to an activity that has prior Fi The change is not editorial or typographical approval EL The change does not conform to an activity that has prior approval Planning Standard Impact Determination:

El §50.47(b)(1) - Assignment of Responsibility (Organization Control)

El §50.47(b)(2) - Onsite Emergency Organization Li §50.47(b)(3) - Emergency Response Support and Resources Li §50.47(b)(4) - Emergency Classification System*

LI §50.47(b)(5) - Notification Methods and Procedures*

Li §50.47(b)(6) - Emergency Communications Li §50.47(b)(7) - Public Education and Information El §50.47(b)(8) - Emergency Facility and Equipment E] §50.47(b)(9) - Accident Assessment*

Ei§50.47(b)(10) - Protective Response*

Ei §50.47(b)(1 1) - Radiological Exposure Control Ri §50.47(b)(12) - Medical and Public Health Support El §50.47(b)(13) - Recovery Planning and Post-accident Operations EL §50.47(b)(14) - Drills and Exercises Li §50.47(b)(15) - Emergency Responder Training EL §50.47(b)(16) - Emergency Plan Maintenance

  • Risk Significant Planning Standards Li The proposed activity does not impact a Planning Standard Commitment Impact Determination:

Li The activity does involve a site specific EP commitment Li The activity does not involve a site specific EP commitment Results: L oc Z The activity can be implemented without performing a §50.54(q) effectiveness evaluation EL The activity cannot be implemented without performing a §50.54(q) effectiveness evaluation Preparer Name: PAl4arer.Sig atur ate:

Natalie Harness Agat <' 11/20/14 Reviewer Name: Reviewer Sin r / / Date:

Don Crowl I ,

Revision 12