NUREG-1185, Advises That Util 890302 Response to Generic Ltr 83-28,Items 4.5.2 & 4.5.3 Re Reactor Trip Sys reliability,on-line Testing & Testing Intervals,Acceptable Per NUREG-1185
| ML20245C976 | |
| Person / Time | |
|---|---|
| Site: | Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png |
| Issue date: | 06/20/1989 |
| From: | Wang A Office of Nuclear Reactor Regulation |
| To: | Mroczka E CONNECTICUT YANKEE ATOMIC POWER CO. |
| References | |
| RTR-NUREG-1185 GL-83-28, NUDOCS 8906260350 | |
| Download: ML20245C976 (2) | |
Text
._.
pr l:
1 June 20,1989 t
Docket No. 50-213~
DISTRIBUTION
'YkketJ11e EJordan Mr. Edward J. Mroczka, Senior Vice President NRC & Local PDits BGrimes Nuclear Engineering and Operations Plant File ACRS(10) g l
Connecticut Yankee Atomic Power Company SVarga l
P. O. Box 270 BBoger Hartford, Connecticut. 06141-0270 SNorris AWang
Dear Mr. Mroczka:
SUBJECT:
GENERIC LETTER 83-28, ITEMS 4.5.2 AND 4.5.3, " REACTOR TRIP SYSTEM RELIABILITY" By. letter dated March 2, 1989, Connecticut Yankee Atomic Power Company (CYAPC0/ Licensee) stated that all work related to the above subject is considered complete. As stated in NUREG-1185, " Integrated Safety Assessment
. Report", the NRC staff considers Item 4.5.2 to be complete and agreed with CYAPC0 that no on-line testing of the. Reactor Trip System (RTS) is necessary.
Item 4.5.S, " Reactor Trip. System Testing Intervals" was to review the licensee availability analyses for the RTS and evaluate the overall adequacy of the existing test intervals. As part of Item 4.5.2 CYAPC0 provided reactor trip reliability data to justify their conclusion that no on-line testing was necessary. Therefore, based on the staff's review of that-data as part of the basis for accepting CYAPC0's position for Item 4'.5.2, the staff considers Item 4.5.3 complete as an interval for on-line functional testing of the RTS is not relevant as operation of RTS prohibits on-line functional testing.
If you have any questions please call me at (301) 492-1313.
Sincerely, signed by Michael Boyle for Alan B. Wang, Project Manager Project Directorate.I-4 Division of Reactor Projects I/II Office of Nuclear Reactor _ Regulation ec: See next page
[HADDAMNECKPLANT. GEN.LETR.]
NN
$$nIcbN 3
r i
6/P(/89 d 6/h/89 6fA(/8
{
8906260330 990620 DR ADOCK 05000213 PDC
c
'Mr. Edward J. Mroczka Connecticut Yankee Atomic Power Company Haddam Neck Plant cc:-
Gerald Garfield, Esquire R. M. Kacich, Manager Day, Berry and Howard Generation Facilities Licensing Counselors at Law Northeast Utilities Service Company City Place Post Office Box 270 Hartford, Connecticut 06103-3499 Hartford, Connecticut' 06141-0270 W. D. Romberg, Vice President D. O. Nordquist Nuclear Operations Director of Quality Services Northeast Utilities Service Company Northeast Nuclear Energy Company Post Office Box 270 Post Office Box 270 Hartford, Connecticut 06141-0270 Hartford, Connecticut 06141-0270-Kevin McCarthy, Director Regional Administrator Radiation Control. Unit Region I Department of Environmental Protection U. S. Nuclear Regulatory Commission State Office Building 475 Allendale Road Hartford, Connecticut 06106 King of Prussia Pennsylvania 19406 Bradford S. Chase, Under Secretary Board of Selectmen
. Energy Division Town Hall Office of Policy and Management Haddam, Connecticut 06103 80 Washington' Street Hartford, Connecticut 06106 J. T. Shediosky, Resident Inspector Haddam Neck Plant D. B. Miller, Station Superintendent c/o U. S. Nuclear Regulatory ' Commission Haddam Neck Plant Post Office Box 116 Connecticut Yankee Atomic Power Company East Haddam Post Office RFD 1, Post Office Box 127E East Haddam, Connecticut 06423 East Hampton, Connecticut 06424 G.' H. Bouchard, Unit Superintendent Haddam Neck Plant RFD #1 Post Office Box 127E 4
East Hampton, Connecticut 06424 l