Forwards WCAP-14695,Rev 0 to WCAP-14694,Rev 1 to WCAP-14396, WCAP-14690,Rev 1 to WCAP-14655 & Rev Rev 1 to WCAP-14401 Re Dser Chapter 18 & NUREG-0711 Elements
ML20117F082
Person / Time
Site: 05200003
Issue date: 08/22/1996
From: Mcintyre B
WESTINGHOUSE ELECTRIC COMPANY, DIV OF CBS CORP.
To: Quay T
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20117F084 List:
References
RTR-NUREG-0711, RTR-NUREG-711 NSD-NRC-96-4784, NUDOCS 9609030293
Download: ML20117F082 (3)


Text

"*

Westinghouse Energy Systems Box 355 Electric Corporation Pittsburgh Pennsylvania 15230-0355 NSD-NRC-96-4784 DCP/NRC0585 Docket No.: STN-52-003 August 22,1996 Document Control Desk U.S. Nuclear Regulatory Commission Washmgton, D.C. 20555 ATTENTION: T.R. QUAY

SUBJECT:

WCAPs 14695,14694,14396,14690,14655 and 14401 RELATED TO DSER CIIAPTER 18 AND NUREG-0711 ELEMENTS

Dear Mr. Quay:

Please find attached 10 copies each of WCAPs 14695,14694,14396,14690,14655, and 14401. This completes some Westinghouse AP600 Design Certification activities related to DSER Chapter 18 and NUREG 0711 Elements as outlined below.

Element 1 The E ESBU Quality Policy and Procedures Manual, Procedure 4.12, Design Reviews, has been revised and includes information requirements for the human-machine interface. No further action required.

Element 2 Westinghouse has received the NRC letter of August 12,1996, "Iluman Factors Comments on the AP600 Draft Operating Experience Review Report." WCAP-14645 will be revised to address these comments as well as DSER OITS items 1316 through 1322 and 2063. The WCAP revision will be completed by September 30,1996.

Element 3 Westinghouse has received the NRC letter of August 8,1996, "AP600 Iluman Factors Engineering Comments on the Draft Functional Requirements Analysis and Function Allocation Document." WCAP-14644 will be revised to address these comments as well as DSER OITS open items 1323 through 1337 and 2465 through 2468. The WCAP revision will be completed by September 30,1996.

Note: Except for OITS open item 2466, which is a compilation of DSER open items 18.4.3.2-1 through 7, each of the Element 3 OITS items is statused by Westinghouse as RESOLVED. A telephone conference will be held in early September to discuss 18.4.3.2-1, the only Element 3 DSER open item which is not RESOLVED.

- 9609030293 960822 PDR ADOCK 05200003 -

A PDR

"^

]G)9bb [p0

.~ I 1110

s NSD-NRC-96-4784 DCP/NRC0585 August 22,1996

'l Element 4 Ten copies of WCAP-14695 (non-proprietary class 3), " Description of the i Westinghouse Operator Decision-Making Model and Functional-Based Task Analysis ,

Methodology," are attached. Revision of WCAP-14651 (see Element 6) will complete Westinghouse activities for Element 4 and close DSER OITS open items 1338 and  :

1339.

Element 5 Ten copies of WCAP-14694 (non-proprietary class 3), " Designer's Input to Determination of the AP600 Main Control Room Staffing Level," are attached.

Submittal of this WCAP and SSAR Revision 9 Chapter 18 completes Westinghouse  ;

activities for Element 5. DSER OITS open items 1343 through 1347 are statused by l Westinghouse as CLOSED. ,

Element 6 WCAP-14651, " Integration of Human Reliability AnalyLs with Human Factors l Engineering Design Implementation Plan," is being revised based on results of a  :

telephone conference with NRC and BNL reviewers. Revision of WCAP-14651 will ,

be completed by September 30,1996. When that WCAP is submitted, Westinghouse j activities for Element 6 will be complete and DSER OITS open items 1348 through 1353 will be statused by Westinghouse as CLOSED.

Element 7 Ten copies of WCAP-14396 Revision 1 (non-proprietary class 3), " Man-In-The-Loop Test Plan Description," are attached. Submittal of this WCAP and SSAR Revision 9 Chapter 18 completes Westinghouse activities for Element 7. DSER OITS open items  ;

1358 through 1361 are statused by Westinghouse as CLOSED.

Element 8 Ten copies of WCM-14690 (non-proprietary class 3), " Designer's Input to Procedure Development For le AP600," are attached. This WCAP incorporates issues i addressed durin2 Westinghouse /NRC/BNL telephone conferences. Submittal of this i WCAP and SSAR Revision 9 Chapter 18 completes Westinghouse activities for  :

Element 8. DSER OITS open items 1365 through 1366 and 1368 through 1372 are [

statused by Westinghouse as CLOSED.

Element 9 Ten copies of WCAP-14655 Revision 1 (non-proprietary class 3), " Designer's Input for the T.~aining of the Human Factors Engineering Verification and Validation Personnel," are attached. With submittal of this WCAP and SSAR Revision 9 Chapter 18 completes Westinghouse activities for Element 9. DSER OITS open item 1650 is statused by Westinghouse as CLOSED.

Element 10 Ten copies of WCAP-14401 Revision 1 (non-proprietary class 3), " Programmatic Level Description of the AP600 Human Factors Verification and Validation Plan," are attached. Issuance of WCAP-14701, " Methodology and Results Evaluation Issues for AP600 HSI Design Test Program," on August 30,1996, will complete Westinghouse  !

activities for Element 10. There are no assigned DSER OITS open items.

1 2897A

_ _ . _ _J

l V

o NSD-NRC-%-4784 DCP/NRC0585 August 22,1996 I

In summary, WCAP 14701 will be issued by August 30,1996, completing Westinghouse activities for  !

Element 10. WCAPs-14645,14651, and 14644 will be revised by September 30,1996 and, with their issuance, Westinghouse activities for Elements 2,3,4, and 6 will be complete.

In addition to the items statused above, there are DSER Chapter 18 open items in OITS which are assigned to ITAACs. These are items 1340,1341,1342,1395,13%,1397, and 2044. Westinghouse expects the NRC to review the WCAPs submitted in support of a timely AP600 FDA.

Please contact Robin Nydes on (412) 374-4125 if you have any questions regarding this transmittal.

A Brian A. McIntyre, Mana[ger Advanced Plant Safety and Licensing