NRC 2017-0011, 2017 Point Beach Nuclear Plant Initial License Examination Letter Submitting Examination
From kanterella
(Redirected from NRC 2017-0011)
Jump to navigation
Jump to search
ML17205A215 | |
Person / Time | |
---|---|
Site: | Point Beach |
Issue date: | 03/02/2017 |
From: | Coffey R, Seymour J L Operations Branch III, Point Beach |
To: | Orlikowski R J Operations Branch III |
Shared Package | |
ML16319A344 | List: |
References | |
NRC 2017-0011 | |
Download: ML17205A215 (3) | |
Similar Documents at Point Beach | |
---|---|
Category:Letter type:NRC
MONTHYEARNRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024
[Table view]Ile Post-Exam Submittal Letter NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter NRC 2023-0013, Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations2023-07-0707 July 2023 Response to Regulatory Information Summary 2023-01 Preparation and Scheduling of Operator Licensing Examinations NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter NRC 2023-0005, Report of Changes to Emergency Plan2023-02-21021 February 2023 Report of Changes to Emergency Plan NRC 2022-0032, Sixth 10-Year Interval Inservice Testing (1ST) Program Plan2022-09-30030 September 2022 Sixth 10-Year Interval Inservice Testing (1ST) Program Plan NRC 2022-0025, License Amendment Request 295, Beacon Power Distribution Monitoring System2022-09-26026 September 2022 License Amendment Request 295, Beacon Power Distribution Monitoring System NRC 2022-0019, Report of Changes to Emergency Plan2022-07-13013 July 2022 Report of Changes to Emergency Plan NRC 2022-0022, Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2,2022-07-11011 July 2022 Response to Request for Supplemental Information (Rsi) Regarding License Amendment Request (LAR) 297, Revise Technical Specifications to Adopt Risk Informed Completion Times TSTF-505, Revision 2, NRC 2022-0015, Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report2022-04-27027 April 2022 Fall 2021 Unit 2 (U2R38) Steam Generator Tube Inspection Report NRC 2022-0014, 2021 Annual Monitoring Report2022-04-14014 April 2022 2021 Annual Monitoring Report NRC 2021-0012, Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41)2022-04-0707 April 2022 Core Operating Limits Report (COLR) Unit 1 Cycle 41 (U 1 C41) NRC 2022-0003, License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process2022-03-25025 March 2022 License Amendment Request 296, Application for Technical Specification Improvement to Eliminate Requirements for Post-Accident Systems Using the Consolidated Line Item Improvement Process NRC 2022-0006, Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections2022-02-22022 February 2022 Notification of Deviation from Pressurized Water Owners Group (PWROG) Report WCAP-17451-P, Revision 1, Reactor Internals Guide Tube Wear - Westinghouse Domestic Fleet Operational Projections NRC 2022-0004, Report of Changes to Emergency Plan2022-02-0909 February 2022 Report of Changes to Emergency Plan NRC 2022-0005, Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations2022-02-0101 February 2022 Refueling Outage U2R38 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2022-0001, Report of Changes to Emergency Plan2022-01-11011 January 2022 Report of Changes to Emergency Plan NRC 2021-0046, Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40)2021-10-28028 October 2021 Core Operating Limits Report (COLR) Unit 2 Cycle 39 (U2C39) and Changes to Unit 1 COLR Unit 1 Cycle 40 (U1C40) NRC 2021-0031, Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-0562021-07-15015 July 2021 Registration of Holtec Hi STORM Casks HI-STORM-37-054, HI-STORM-37-055, and HI-STORM-37-056 NRC 2021-0027, Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-0532021-06-30030 June 2021 Registration of Holtec Historm Casks HISTORM-37-051, HISTORM-37-052, and HISTORM-37-053 NRC 2021-0028, Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism2021-06-23023 June 2021 Generic Letter 2004-02 Containment Sump Debris Transport Calculation Non-Conservatism NRC 2021-0021, 2020 Annual Monitoring Report2021-04-29029 April 2021 2020 Annual Monitoring Report NRC 2021-0019, Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations2021-04-22022 April 2021 Response to Regulatory Information Summary 2021-01 Preparation and Scheduling of Operator Licensing Examinations NRC-2021-0010, CFR 50.59 Evaluation and Commitment Change Summary Report2021-04-0202 April 2021 CFR 50.59 Evaluation and Commitment Change Summary Report NRC-2021-0011, Technical Specification Bases and Technical Requirement Manual Change Summary2021-04-0202 April 2021 Technical Specification Bases and Technical Requirement Manual Change Summary NRC 2021-0006, Report of Changes to Emergency Plan2021-03-18018 March 2021 Report of Changes to Emergency Plan NRC 2021-0005, Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-022021-02-11011 February 2021 Withdrawal of Exemption Request Supporting Updated Final Response to NRC Generic Letter 2004-02 NRC 2021-0003, Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report2021-01-21021 January 2021 Refueling 39 (U1 R39) Reactor Coolant Pump Analytical Evaluation Report NRC 2021-0002, Refueling Outage U1 R39 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations2021-01-21021 January 2021 Refueling Outage U1 R39 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2021-0001, Report of Changes to Emergency Plan2021-01-13013 January 2021 Report of Changes to Emergency Plan NRC 2020-0044, Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise2020-12-0808 December 2020 Response to Request for Additional Information Request for Exemption from 10 CFR 73, Appendix B, Section VI Regarding Annual Force-On-Force Exercise NRC 2020-0032, Application for Subsequent Renewed Facility Operating Licenses2020-11-16016 November 2020 Application for Subsequent Renewed Facility Operating Licenses NRC 2020-0039, Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40)2020-11-0202 November 2020 Core Operating Limits Report (COLR) Unit 1 Cycle 40 (U1 C40) NRC 2020-0031, NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-0812020-10-0505 October 2020 NextEra Energy Point Beach, LLC Response to Apparent Violation in NRC Inspection Report 05000266/2020012, 05000301/2020012: EA-20-081 NRC 2020-0029, Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-09-15015 September 2020 Supplement to License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0024, Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements2020-08-17017 August 2020 Response to Request for Additional Information Request for Exemption from Certain Operator Requalification Requirements NRC 2020-0020, License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss2020-08-13013 August 2020 License Amendment Request (LAR) 293, One-Time Extension of Renewed Facility Operating License Condition 4.1, Containment Building Construction Truss NRC 2020-0023, NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations2020-08-12012 August 2020 NextEra Energy Point Beach, LLC - Revised Response to Regulatory Information Summary 2020-01, Preparation and Scheduling of Operator Licensing Examinations NRC 2020-0021, Response to NRC Inspection Report and Preliminary White Finding2020-08-12012 August 2020 Response to NRC Inspection Report and Preliminary White Finding NRC 2020-0018, Report of Changes to Emergency Plan2020-07-15015 July 2020 Report of Changes to Emergency Plan NRC-2020-0016, Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic2020-06-12012 June 2020 Supplement to Exemption Request for Access Authorization and Fitness for Duty Requirements Due to COVID-19 Pandemic NRC 2020-0012, Refueling Outage U2R37 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations2020-05-20020 May 2020 Refueling Outage U2R37 Owners Activity Report for Class 1, 2, 3 and Mc ISI Examinations NRC 2020-0008, Report of Changes to Emergency Plan2020-04-0606 April 2020 Report of Changes to Emergency Plan NRC 2020-0007, Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38)2020-03-27027 March 2020 Core Operating Limits Report (COLR) Unit 2 Cycle 28 (U2C38) NRC 2020-0003, License Amendment Request 289: Tornado Missile Protection Licensing Basis2020-02-0606 February 2020 License Amendment Request 289: Tornado Missile Protection Licensing Basis NRC 2020-0001, Pressure Temperature Limits Report (PTLR)2020-01-0909 January 2020 Pressure Temperature Limits Report (PTLR) NRC 2019-0044, Report of Changes to Emergency Plan2019-11-0101 November 2019 Report of Changes to Emergency Plan NRC 2019-0036, Submittal of 2018 Update to Final Safety Analysis Report2019-10-18018 October 2019 Submittal of 2018 Update to Final Safety Analysis Report NRC 2019-0037, Technical Specification Bases Change Summary2019-10-18018 October 2019 Technical Specification Bases Change Summary NRC 2019-0034, Technical Requirements Manual Change Summary2019-10-18018 October 2019 Technical Requirements Manual Change Summary 2024-03-18 Category:License-Operator MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024
[Table view]Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment ML21281A1202021-10-0808 October 2021 GFE Results, September 2021 IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 ML21293A3312021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Written Exam ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 2024-07-11 Category:Part 55 Examination Related Material MONTHYEARL-2024-116, Preparation and Scheduling of Operator Licensing Examinations2024-07-11011 July 2024
[Table view]Preparation and Scheduling of Operator Licensing Examinations ML24120A1992024-04-29029 April 2024 Ile Form 5.1-1 Postexamination Check Sheet ML24120A1982024-04-0505 April 2024 Ile Form 2.1-1 Examination Prep Checklist ML24120A2002024-04-0505 April 2024 Ile IP 21 Operator Licensing Exam Schedule ML24120A1972024-04-0505 April 2024 Ile Form 1.3-1 Exam Security Agreement NRC 2024-0007, Ile Post-Exam Submittal Letter2024-03-18018 March 2024 Ile Post-Exam Submittal Letter ML24120A1572024-03-18018 March 2024 Ile Form 3.4-1 Events and Evolutions Checklist - Final ML24120A1692024-02-23023 February 2024 Ile Form 2.3-2 Operating Test Quality Checklist ML24120A1702024-02-23023 February 2024 Ile Form 2.3-4 Written Examination Quality Checklist ML24053A3732024-02-22022 February 2024 Operator Licensing Examination Approval Point Beach, March 2024 NRC-2024-0026, Ile Proposed Exam Submittal Letter2023-12-20020 December 2023 Ile Proposed Exam Submittal Letter ML24120A1552023-10-23023 October 2023 Ile Form 2.3-1 Outline Quality Checklist ML24120A1582023-10-0606 October 2023 Ile Proposed Outline Submittal Letter ML24120A1562023-10-0606 October 2023 Ile Form 3.4-1 Events and Evolutions Checklist - Draft ML23221A0522023-08-0909 August 2023 Confirmation of Initial License Examination, March 2024 IR 05000266/20233012023-03-28028 March 2023 NRC Initial Examination Report 05000266/2023301 and 05000301/2023301 ML23038A2472023-03-24024 March 2023 Form 2.1-1 Point Beach February 13 2023 Exam Prep Checklist ML23199A2052023-03-24024 March 2023 Form 1.3-1 Examination Security Agreements NRC 2023-0006, Post-Exam Submittal Cover Letter2023-03-0101 March 2023 Post-Exam Submittal Cover Letter ML23199A1282023-02-0303 February 2023 Form 3.4-1 Events and Evolutions Checklist ML23199A1242023-02-0303 February 2023 Form 2.3-1 Examination Outline Quality Checklist ML23199A1552023-02-0303 February 2023 Form 2.3-4 Written Examination Quality Checklist ML23199A1532023-02-0303 February 2023 Form 2.3-2 Operating Test Quality Checklist ML23032A3232023-02-0202 February 2023 Operator Licensing Examination Approval - Point Beach Nuclear Plant, February 2023 ML22200A0282022-07-19019 July 2022 Confirmation of Initial License License Examination L-2022-065, Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment2022-04-20020 April 2022 Response to NRC Regulatory Issue Summary 2022-01, Preparation and Scheduling of Operator Licensing Examinations; Request for Comment IR 05000266/20213012021-09-14014 September 2021 NRC Initial License Examination Report 05000266/2021301; 05000301/2021301, and 07200005/2021301 ML21298A1552021-08-12012 August 2021 2021 Point Beach Initial License Exam Outline Review Comments and Resolutions ML21293A3282021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered JPMs ML21256A1322021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-2 ML21293A3302021-08-12012 August 2021 2021 Point Beach Initial License Exam As-Administered Scenarios ML21264A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam License Exam Submittal Letter ML21264A4682021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Written Exam Key ML21256A1752021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-2 ML21298A1472021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-401-4 ML21264A1292021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-3 ML21264A1372021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-4 ML21298A2122021-08-12012 August 2021 2021 Point Beach Initial License Exam Exam Security Agreements ML21264A1432021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-6 ML21298A2212021-08-12012 August 2021 2021 Point Beach Initial License Exam Post-Exam Letter ML21298A2142021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-201-1 ML21298A2202021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-403-1 ML21298A1462021-08-12012 August 2021 2021 Point Beach Initial License Exam Form ES-301-7 ML21264A4612021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed Scenarios ML21256A1572021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-301-1 ML21264A3562021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-6 Written Examination Quality Checklist ML21264A4072021-08-12012 August 2021 2021 Point Beach Initial License Exam Proposed JPMs ML21256A1672021-08-12012 August 2021 2021 Point Beach Initial License Exam ES-401-2 and ES-401-3 Outlines ML21256A1802021-08-12012 August 2021 2021 Point Beach Initial License Exam Forms ES-D-1 ML21256A1392021-08-12012 August 2021 2021 Point Beach Initial License Exam Form Exam Outline Submittal Letter NRC 2021-0008 2024-07-11 |