Committed to NMC PointManagement Beach Nuclear Plant Operated by Nuclear Company, LLC May 19, 2006 NRC 2006-0053 10CFR50.46(b)(5)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Clarification of Commitment

Reference:

1. Letter from NMC to NRC dated February 16, 2006 (NRC 2006-0009)
2. Letter from NMC to NRC dated May 12, 2006 (NRC 2006-0049)

This letter clarifies the Nuclear Management Company, LLC (NMC) response to Question 1.C provided in Reference 2, which stated that, "Engineering of the design and installation of the new solenoid operated valves will be performed on a schedule commensurate with the safety significance of the change and in consideration of the plant conditions required to implement the change."

As discussed during a telephone conference between Nuclear Regulatory Commission (NRC) staff and NMC personnel, the completion date for resolution of the above actions is clarified to be consistent with that previously stated in Reference 1. At the latest, these actions will be completed consistent with the existing NMC commitment to resolve GSI-191 by December 31, 2007.

This letter contains one clarification to a regulatory commitment.

Dennis L. Koehl Site Vice-President, Point Beach Nuclear Plant Nuclear Management Company, LLC cc: Regional Administrator, Region Ill, USNRC Project Manager, Point Beach Nuclear Plant, USNRC Resident Inspector, Point Beach Nuclear Plant; USNRC 6590 Nuclear Road 0 Two Rivers, Wisconsin 54241 Telephone: 920.755.2321