NRC 2004-0008, Request for Withdrawal of Emergency Action Level Revision Approval Request

From kanterella
Jump to navigation Jump to search
Request for Withdrawal of Emergency Action Level Revision Approval Request
ML040230592
Person / Time
Site: Point Beach  NextEra Energy icon.png
Issue date: 01/16/2004
From: Cayia A
Nuclear Management Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC 2004-0008
Download: ML040230592 (1)


Text

NMC Committed to Nuclear Excellence Point Beach Nuclear Plant Operated by Nuclear Management Company, LLC January 16, 2004 NRC 2004-0008 10 CFR 50.54(q)

U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington DC 20555 Point Beach Nuclear Plant, Units 1 and 2 Dockets 50-266 and 50-301 License Nos. DPR-24 and DPR-27 Request For Withdrawal Of Emergency Action Level Revision Approval Request

Reference:

1. Letter (NRC 2003-0113) from A. J. Cayla (NMC) to NRC Document Control Desk, "Emergency Plan and Emergency Plan Implementing Procedure Changes," dated November 25, 2003.

On November 25, 2003, Nuclear Management Company, LLC (NMC) submitted proposed changes to the Point Beach Nuclear Plant (PBNP) emergency preparedness program (Reference 1) to the Nuclear Regulatory Commission (NRC). The proposed changes to Emergency Plan Implementing Procedure (EPIP) 1.2 and Emergency Plan Section 5.0 were submitted to the NRC for review and approval pursuant to the requirements of 10 CFR 50.54(q).

As a result of a conference call conducted between members of the NRC staff and NMC on January 7, 2004, PBNP has re-evaluated the need for the submittal and has determined that the request is no longer desired. Therefore, NMC requests that the submittal (Reference 1) provided to the NRC on November 25, 2003 be withdrawn.

This letter contains no new commitments and no revisions to existing commitments.

A C Si Vi e-Presi nt, Point Beach Nuclear Plant Nuc ar gement Company, LLC cc: Regional Administrator, Region ll, USNRC Project Manager, Point Beach Nuclear Plant, NRR, USNRC NRC Resident Inspector - Point Beach Nuclear Plant PSCW 6590 Nuclear Road

  • Two Rivers, Wisconsin 54241 )4*Y4S Telephone: 920.755.2321