Monthly Operating Rept for Mar 1996 for Fermi 2
ML20107G092
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/31/1996
From: Giles H, Goodman L
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-96-0023, CON-NRC-96-23, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9604230099
Download: ML20107G092 (4)


Text

.

l .

= .

Detroit remu Edison EEE *# ge.u Reg Guide 1.16 l April 15,1996

, NRC-96-0026 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Wasidngton D. C. 20555

Reference:

Fermi 2 NRC Docket ilo. 50-341 NRC Operating License No. NPF-43

Subject:

Monthlv Operating Status Reoort for March.1996 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March,1996. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Hany Giles, at (313) 586-1522.

Sincerely,

-f&

Lynne S. Goodman Director - Nuclear Licensing 9604230099 960331 PDR ADOCK 05000341 R PDR Enclosure cc: T. G. Colburn i l D. R. Hahn

! M. J. Jordan i H. J. Miller 220123 ,

1 A. Vegel l g67-T l

M. V. Yudasz, Jr.

Region III

I l 1

OPERATING DATA REPORT

/ ,

DOCKET NO. 50-341 COMPLETED BY H. B. Giles DATE April 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS l 1. Unit name: Fermi 2 NOTES: (1) Calculated using iWhted l averages to reflect variations in raung (MDC and DER). (2) Currently limiting power to 96%

2. Reporting period: March.1996 CTP maximum due to turbine limitations.

( 3. Licensed thermal power (MWt): 3430 Nameplate and DER ratings reflect 98% CTP

! 4. Nameplate rating (Gross MWe): 1179 due to turbine throttle valve limitations.

5. Design elect rating (Net MWe): 1116
6. Max dependable cap (gross MWe): 924
7. Max dependable cap (Net MWe): 876 i
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A l

9. Power level to which restricted, if any (MWe Net): (2) l
10. Reasons for restriction, if any:_ (2)

THIS MONTH YEAR TO CUMULATIVE l

DATE

11. Hours in reporting period 744 2.184 71.774
12. Hours reactor was critical 631.5 2.071.5 50.423.1
13. Reactor reserve shutdown hours Q 0 0
14. Hours generator on-line 631 2.071 47.707.30 l 15. Unit reserve shutdown hours Q Q Q
16. Gross thennal energy gen (MWH) 2.050.008 6.726.552 146.337.755
17. Gross elect energy gen (MWH) 571.820 1.874.090 47.264.607
18. Net Elect energy gen (MWH) 544.360 1.785.198 45.150.667
19. Unit service factor 84.8 94.8 66.5
20. Unit availability factor 84.8 94.8 65J
21. Unit cap factor (using MDC net) 83.5 93.3 60.2 (1)
22. Unit cap factor (using DER net) 65.6 73.2 57.1 (1)
23. Unit forced outage rate 15.2 12 20.8
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refuel. Sept. 27.

1996. 52 days

, 25. If shutdown at end of report period, estimated date of startup: Aoril 14.1996 l 26, Units in test status (prior to commercial operation):

l FORECAST ACHIEVED

! Initial Criticality N/A N/A Initial Electricity N!M N!%

Commercial Operation N!M MM

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT &nni 2 DATE April 15.1996 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 Month March.1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 873 17 874 2 854 18 874 3 870 19 874 4 869 20 875 5 876 21 J75 l

6 870 22 873 l 7 870 23 874 8 848 24 874 9 864 25 831 10 870 26 749 11 876 27 113 12 874 28 0 13 875 29 0 14 874 30 0 15 870 31 0 16 874

UNIT SHUTDOWNS AND POWER REDUCrlONS [.

DOCKET NO. 50-341 DATE April 15.1996 -

UNIT NAME Fermi 2 COMPLETED BY H. B. Giles TELEPHONE (313) 586-1522 REPORT MONTH March.1996 No. (6) Date TYPE Dur (Hrs) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective (1) shutting down No. Code Action to Prevent 4 reactor or (5) Recurrence l

reducing power (3)

S96-01 950327 F 113 B 2 96-005 BI T- Tech Spec required shutdown due to both divisions of EECW being declared inoperable due to make-up tank design issue. Modification ,

being installed.

(1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data S: Scheduled A - Equipment Failure (Explain) 1 - Manual entry sheets for Licensee Event Report B - Maintenance or Test 2 - Manual Scram (LER) file (NUREG-1022)

C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued (5) Same Source as (4)

E - Operations Training and License 5 - Reduced Load Examination 9 - Other (6) R - Prefix indicates power reduction.

F - Administrative S - Prefix indicated plant shutdown.

G - Operational Error (Explain)

H - Other (Explain)

_ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - - - _ _ _ _ _ _ -