NRC-96-0015, Monthly Operating Rept for Jan 1996 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1996 for Fermi 2
ML20149K227
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/1996
From: Giles H, Goodman L
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-96-0015, CON-NRC-96-15 NUDOCS 9602220053
Download: ML20149K227 (4)


Text

e

,f .

(

l .J.D s DOITOlt r rmia W s Edison EEE ** W gr.L.

Reg Guide 1.16 February 15,1996 NRC-96-0015 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D. C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthlv Operating Status Report for January.1996 1

I Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January,1996. This repon includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Harry Giles, at (313) 586-1522.

1 Sincerely,

~

fh'YY f,, /. &o.4 a si Enclosure cc: T. G. Colburn D. R. Hahn M. J. Jordan H. J. Miller A. Vegel M. V. Yudasz, Jr.

Region III  ;

220024 gzy 9602220053 960131 PDR ADOCK 05000341 Il g R PDR

. OPERATING DATA REPORT DOCKET NO.50-34i COMPLETED BY H. B. Giles DATE February 15.1996 TELEPHONE (313) 586-1522 OPERATING STATUS

1. Unit name: Fermi 2 NOTES: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER). (2) Currently limiting power to 96%
2. Reponing period: January.1996 CTP maximum due to turbine limitations.
3. Licensed thermal power (MWt): 3430 Nameplate and DER ratings reflect 98% CTP
4. Nameplate rating (Gross MWe): 1179 due to turbine throttle valve limitations.
5. Design elect rating (Net MWe): 1116
6. Max dependable cap (gross MWe): 924
7. Max dependable cap (Net MWe): 8_7_6 7
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): (2)
10. Reasons for restriction, if any: (2)

Tills MONTH YEAR TO CUMULATIVE DATE

11. Hours in reporting period 744 744 70.334 l
12. I-lours reactor was critical 744 744 49.095.6
13. Reactor reserve shutdown hours Q Q g
14. Hours generator on-line 744 244 46.380.3
15. Unit reserve shutdown hours 0 0 g
16. Gross thermal energy gen (MWH) 2.397.096 2.397.096 142.008.299
17. Gross elect energy gen (MWH) 667.390 667.390 46.057.907 j
18. Net Elect energy gen (MWH) 635.753_ 635.753 44.001.222
19. Unit service factor 100.0 100 65.9
20. Unit availability factor 100.0 100 65.9
21. Unit cap factor (using MDC net) 97.5 97.5 59.7 (1)
22. Unit cap factor (using DER net) 76.6 76.6 56.8 (1)
23. Unit forced outage rate Q Q 21.1
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):
25. If shutdown at end of report period, estimated date of startup:
26. Units in test status (prior to commercial operation):

FORECAST ACHIEVED Initial Criticality N/A N/A Initial Electricity N/A N/A Commercial Operation N/A N/A

)

l

. - AVERAGE DAILY UNIT POWER LEVEL L 1 DOCKET NO.50-34I l UNIT Fermi 2 DATE February 15.1996 COMPLETED BY H. B. Giles TELEPIIONE (313) 586-1522 Month Jan_parv.1996 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 873 17 874 2 873 18 874 3 872 19 842 4 873 20 543 5 871 21 659 6 872 22 853 7 872 23 875 8 872 24 877 9 868 25 877 10 874 26 875 11 874 27 875 12 872 28 875 13 874 29 875 14 874 30 876 15 873 31 873 16 873

UNIT SHUTDOWNS AND POWER REDUCTIONS ,'

DOCKET NO. 50-341 DATE February 15.1996 c.

UNIT NAME Fermi 2 COMPLETED BY H. B. Giles w

TELEPHONE (313) 586-1522 REPORT MONTH January.1996 No. (6) Date TYPE Dur (Hrs) (7) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective (1) shutting down No. Code Action to Prevent reactor or (5) Recurrence reducing power (3)

R96-01 950119 S 0 B 5 N/A AA ROD Reduce Rx power to 55% to perform scram solenoid pilot valve maintenance, scram time testing, control rod pattern adjustments and main turbine valve surveillances.

(1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data S: Scheduled A - Equipment Failure (Explain) 1 - Manual entry sheets for Licensee Event Report .

B - Maintenance or Test 2 - Manual Scram (LER) file (NUREG-1022)

C - Refueling 3 - Automatic Scram D - Regulatory Restriction 4 - Continued (5) Same Source as (4) '

E - Operations Training and License 5 - Reduced Load Examination 9 - Other (6) R - Prefix indicates power reduction.

F - Administrative S - Prefix indicated plant shutdown.

G - Operational Error (Explain)

H - Other (Explain) (7) Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4

_ _ _ _ - - _ _ _ - . _ _ _ _ _ - _ . _ _ _ _ . _ _ _ _ _ _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _- - ___ . -_-_ __ _ . . ._ _ _ _ _ _ _ _ _ _ - - _ _