_ - _ _ _ _ _ - _ _ _ ._, , _ . . .. . -.. _ . - - _.~.s. -

e s

, Of 'igits R. Olpson So ior Vee President Nuclear Generaten Detroit r.au e 6400 North De H,ghway Newport, MichKjan 48166 (313) 5 % 5243 Reg Guide 1.16 September 15,1995 NRC-95-0088 U. S. Nuclear Regulatory Commission Attention
Document Control Desk Washington D. C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Ooeratine Status Report for Aunust.1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for August,1995. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 l Technical Specification 6.9.1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely, f $'

a s Enclosure cc: T. G. Colburn D. R. Hahn H. J. Miller

. M. P. Phillips A. Vegel M. V. Yudasz, Jr.

Region III  !

t 9509190247 950831 M1 PDR ADOCK 05000341 / l.

.R.__ _ _ _.-.- J DR_.. . v d

o .

'8 0 .

- OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE September 15.1995 TELEPHONE (313) 586-5148 OPERATING STATUS L Unit name: Fermi 2 NOTES: (1) Calculated using weighted

2. Reporting period: Aucust.1995 averages to reflect variations in rating (MDC
3. Licensed thermal power (Mwt): 3430 and DER). (2) Currently limiting power to
4. Nameplate rating (Gross Mwe): 1179 96% CTP maximum for Startup Test
5. Design elect rating (Net Mwe): 1116 Program. Nameplate and DER ratings
6. Max dependable cap (gross Mwe): 924 reflect 98% CTP due to turbine throttle valve
7. Max dependable cap (Net Mwe): 876 limitations. (3) Revised to reflect MDC for this cycle.
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

MDC ratines revised due to reachine steady state power at which unit is expected to operate this cycle (96% CTP).

9. Power level to which restricted,if any (Mwe Net): 96% CTP/3293 MWT
10. Reasons for restriction,if any: (2)

THIS MONTH YEAR TO CUMULATIVE DATE I 1. Hours in reporting period 744 5.831 66.661

12. Hours reactor was critical 744 4.687 45.422.6
13. Reactor reserve shutdown hours Q Q g
14. Hours generator on-line 244 3.582.9 42.707.3
15. Unit reserve shutdown hours Q Q Q
16. Gross thermal energy gen (MWH) 2.431,824 10.573.512 130.287.563
17. Gross elect energy gen (MWH) 681.270 2.812.230 42.786.187
18. Net Elect energy gen (MWH) 644.576 2.647.407 40.881.122
19. Unit service factor 100 61.4 64.1
20. Unit availability factor 100 61.4 64.1
21. Unit cap factor (using MDC net) 98.9 51.8(3) 58.0(1)
22. Unit cap factor (using DER net) 77.6 40.7 55.7 (1)
23. Unit forced outage rate Q 36.1 22.5
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each):
25. If shutdown at end of report period, estimated date of startup:
26. Units in test status (prior to commeri.ial operation):

FORECAST ACHIEVED Initial Criticality N/A. N/A Initial Electricity N/A N/A Commercial Operation N/A N]/A

AVERAGE DAILY UNIT POWER LEVEL

. DOCKET NC 50-341 UNIT Fermi 2 DATE September 15.1995 COMPLETED BY B. J. Stone TELEPHONE (313)586-5148 _

Month August.1995 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net) (MWe-Net) 1 863 17 863 2 863 18 863 3 863 19 863 4 863 20 863 5 863 21 863 6 863 22 870 7 863 23 873 8 863 24 872 1

9 863 25 873 10 862 26 873 11 856 27 872 12 863 28 872 13 863 29 873 14 863 30 873 15 863 31 873 l

16 863

/

UNITSHUTDOWNS AND POWER REDUCTIONS ,

DOCKET NO. 50-341 DATE September 15.1995 UNIT NAME Fermi 2 COMPLETED BY B. J. Stone TELEPHONE (313)586-5148 REPORT MONTH August.1995 No. (6) Date TYPE Dur(Hrs) (7) Reason (2) Method of shutting LER Sys Code (4) Comp Cause and Corrective (1) down reactor or No. Code Action to Prevent reducing power (3) (5) Recurrence (1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data S: Scheduled A - Equipment Failure (Explain) 1 - Manual entry sheets for Licensee Event Report B - Maintenance or Test 2 - Manual Scram (LER) file (NUREG-1022)

C - Refueling 3 - Au'.omatic Scram D - Regulatory Restriction 4 - ( 'ontinued (5) Same Source as (4)

E - Operations Training and 5 - Reduced Load License Examination 9 - Other (6) R - Prefix indicates power reduction.

F- Administrative S - Prefix indicated plant shutdown.

G - Operational Error (Explain)

H - Other (Explain) (7) Duration of reductions reported as zero per regulatory guide 1.16 Revision 4

_ _ _ _ ___ _________________ _ ___ _____ _________ - _-____ _ _ _ - ____ ______. . _ _ _ _ _ _ -