NRC-95-0037, Monthly Operating Rept for Mar 1995 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Mar 1995 for Fermi 2
ML20082J135
Person / Time
Site: Fermi 
Issue date: 03/31/1995
From: Gipson D, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0037, CON-NRC-95-37 NUDOCS 9504180123
Download: ML20082J135 (4)


Text

. -

ea:

a Doughts R. Gipson Seruor Vice President Nuclear Generation Fermi 2' 6400 North Dixie Hignway

.(

Newport, Michigan 48166 '

. 313) 586-5249

(

' Reg Guide 1.16 April 13, 1995 NRC-95-0037 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Nashington, D.C.

20555 i

Reference:

Feral 2 NRC Docket No. 50-341 NRC Operating-License No. NPF-43

Subject:

Monthly Operatinat Status Report for March, 1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March,-1995. This report includes the Operating Data Report, Average Daily Unit' Power Level,'and the Summary of Unit Shutdowns and Power Reductions identified j

in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have'any questions, please contact Brian Stone, at' (313) 586-5148.

Sincerely, l

Enclosure oc:

T. G. Colburn D. R. Hahn J. B. Martin M. P. Phillips P. L. Torpy A.

Vegel cren

]" L,s L U lh lt PDR AD CK O O PR 1

R

OPERATING DATA REPORT 7

DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE.

April 13, 1995 TELEPHONE D13)586-5148 j

~

OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

(1.i Calculated using weight-l 2.

REPORTING PERIOD: March, 1995 I ed averages to reflect variations l

l 3

LICENSED THERMAL POWER (MWt): 3430 l in rating (MDC and DER).

l 4.

NAMEPLATE RATING (GROSS MWe):

1179 l (2) Currently limiting power to l

5.

DESIGN ELECT RATING (Net MWe): 1116 l 80% CTP maximum for Startup Test l

6.

MAX DEPENDABLE CAP (GROSS MWe):1135 I Program. All ratings reflect 98%

l 7.

MAX DEPENDABLE CAP (Net NWe):1085 l CTP due to turbine throttle valve l

l limitations.

l j

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS FUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

N/A 9

4 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): 80% CTP/2744 My'

10. REASONS FOR RESTRICTION, IF ANY:

(2)

THIS MONTH YR TO DATE CUMULATIVE

{

11. HRS IN REPORTING PERIOD 744 2,160 62,990
12. HRS REACTOR WAS CRITICAL 597.1 1,540.9 42,276.5 2
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 355.4 598.8 39,723.2 1

l

15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 868,176 1,477,056 121.191,107 i
17. GROSS ELECT ENERGY GEN (MWH) 210,760 296,820 40,270,777 I
18. NET ELECT ENERGY GEN (MWH) 196,038 273,976 38,507.691 i
19. UNIT SERVICE FACTOR 47.8 27.7 63 1
20. Uh77 AVAILABILITY FACTOR 47.8 27.7 63.1
21. UNIT CAP FACTOR (USING MDC NET) 24.3 11.7 56.9

{

22. UNIT CAP FACTOR (USING DER NET) 23.6 11.4 55.5 j
23. UNIT FORCED OUTAGE RATE 49.6 70.0 22.9
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED i

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4

r AVERAGE DAILY UNIT POWER LEVEL

s

-DOCKET NO.

50-341 UNIT FERMI 2 DATE April 13, 1995 i.

COMPLETED BY B. Stone 1

TELEPHONE (313) 586-5148

{

Month March, 1995 1

1 l

)

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWEB LEVEL l

(MWe-Net)

(MWe-Net) 1 0

17 87 1

i 2

0 18 604 t

i i

3 0

19 648 i

4 0

20 700 3

5 0

21 620 6

0 22 615 7

0 23 616 8

0 24 616 1

9 0

25 615 10 0

26 228 l

11 0

27 0

12 0

28 67 1

i 13 79 29 627 1

j 14 26 30.

712 4

15 353 31.

713 16 239 i

j i

l l

I t

e

UNIT SHUTDOWNS AND POWE1 f. EDUCTIONS DOCKET NO.

50-31*

DATE April 13.

1*"5 5

UNIT NAME' Fermi _{

COMPLETED 11Y S. J.

Stann TELEPHONE (313) 586-5148 REPORT MONTH March. 1995 i

METHOD OF SHUTTING DOWN LER SYS COMP CAUSE & CORRECTIVE NO.

DATE TYPE DUR REASON THE REACTOR NO.

CODE-CODE ACTION TO PREVENT (1)

(HRS)

(2)

OR. REDUCING (4)

(5)

RECURRENCE (6)

(7)

POWER (3) 595-03 950213 F

302.1 B

1 N/A TD -

PSP Turbine taken off-line to repair (8) turbine jacking oil. system structural concerns.

t 595-04 950314 5

18.1 B

N/A

'N/A TA TRB Turbine taken off-line to perform i

post outage balancing.

I S95-05 950316 5

20.6 B

N/A N/A TA TRB Turbine taken off-line to obtain turbine coastdown bearing vibration data.

595-06 950326 F

47.8-B N/A N/A TJ.

PSP Turbine taken off-line to repair

+

a stator cooling water vent line leak.

(1) F FORCED (2) REASON:

(3) METHOD:

(4) INSTRUCTIONS FOR 5: SCHEDULED' A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA S - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER). FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F'- ADMINISTRATIVE

'9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(S) 1AME SOURCE AS (4)

(6) R - PREFIX INDICATES POWER REDUCTION.

S - PREFIX INDICATES PLANT SHUTDOWN.

(7) DURATION OF REDUCTIONS REPORTED AS ZERO PER REG.

GUIDE 1.16 REV. 4

-(8)

Outage hours are a continuation of the outage which began on 02/13/95.