e a: a Doughts R. Gipson Seruor Vice President

. Nuclear Generation Fermi 2' 6400 North Dixie Hignway .(

Newport, Michigan 48166 '

. 313)

( 586-5249

' Reg Guide 1.16 April 13, 1995 NRC-95-0037 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Nashington, D.C. 20555 i

Reference:

Feral 2 NRC Docket No. 50-341 NRC Operating-License No. NPF-43

Subject:

Monthly Operatinat Status Report for March, 1995 Enclosed for your information and use is the Fermi 2 Monthly  ;

Operating Status Report for March,-1995. This report includes ,

the Operating Data Report, Average Daily Unit' Power Level,'and I the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical j

Specification 6.9.1.6.

If you have'any questions, please contact Brian Stone, at' (313) 586-5148.

Sincerely, l

Enclosure oc: T. G. Colburn D. R. Hahn J. B. Martin M. P. Phillips P. L. Torpy A. Vegel cren

]" L,s L U lh lt PDR AD CK O O PR 1 R

, OPERATING DATA REPORT 7 DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE. April 13, 1995 TELEPHONE

~

D13)586-5148 j OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: (1.i Calculated using weight-l
2. REPORTING PERIOD: March, 1995 I ed averages to reflect variations l l 3 LICENSED THERMAL POWER (MWt): 3430 l in rating (MDC and DER). l
4. NAMEPLATE RATING (GROSS MWe): 1179 l (2) Currently limiting power to l
5. DESIGN ELECT RATING (Net MWe): 1116 l 80% CTP maximum for Startup Test l
6. MAX DEPENDABLE CAP (GROSS MWe):1135 I Program. All ratings reflect 98% l
7. MAX DEPENDABLE CAP (Net NWe):1085 l CTP due to turbine throttle valve l l limitations. l j 8. IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS FUMBER 3 THROUGH 7) SINCE  ;

LAST REPORT, GIVE REASONS: N/A 4

! 9 POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net): 80% CTP/2744 My'

10. REASONS FOR RESTRICTION, IF ANY: (2)

THIS MONTH YR TO DATE CUMULATIVE

{ 11. HRS IN REPORTING PERIOD 744 2,160 62,990

12. HRS REACTOR WAS CRITICAL 597.1 1,540.9 42,276.5 2
13. REACTOR RESERVE SHUTDOWN HRS 0 0 0 1 l
14. HOURS GENERATOR ON-LINE 355.4 598.8 39,723.2 l
15. UNIT RESERVE SHUTDOWN HOURS 0 0 0

. 16. GROSS THERMAL ENERGY GEN (MWH) 868,176 1,477,056 121.191,107 I i

17. GROSS ELECT ENERGY GEN (MWH) 210,760 296,820 40,270,777 I 196,038 273,976
18. NET ELECT ENERGY GEN (MWH) 38,507.691 i
19. UNIT SERVICE FACTOR 47.8 27.7 63 1
20. Uh77 AVAILABILITY FACTOR 47.8 27.7 63.1  !
21. UNIT CAP FACTOR (USING MDC NET) 24.3 11.7 56.9

{ 22. UNIT CAP FACTOR (USING DER NET) 23.6 11.4 55.5 j 23. UNIT FORCED OUTAGE RATE 49.6 70.0 22.9

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

i FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A 4

r AVERAGE DAILY UNIT POWER LEVEL

s

. -DOCKET NO. 50-341

. UNIT FERMI 2

, , DATE April 13, 1995

i. COMPLETED BY B. Stone 1

TELEPHONE (313) 586-5148

{ Month March, 1995 1 1 l

)

DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWEB LEVEL l (MWe-Net) (MWe-Net)

! 1 0 17 87 1

i 2 0 18 604 ,

t i i 3 0 19 648 i

3 4 0 20 700 5 0 21 620 6 0 22 615 7 0 23 616 ,

l

8 0 24 616 1 9 0 25 615 l

10 0 26 228  ;

l 11 0 27 0

12 0 28 67 1

i 13 79 29 627 1

j 14 26 30. 712 4 15 353 31. 713 16 239  ;

i j

i l

l I

t e

UNIT SHUTDOWNS AND POWE1 f. EDUCTIONS DOCKET NO. 50-31* DATE April 13. 1*"5 '.

UNIT NAME' Fermi _{ COMPLETED 11Y S. J. Stann

'# 5 TELEPHONE (313) 586-5148 ,

  • REPORT MONTH March. 1995
  • i .

METHOD OF '

SHUTTING DOWN LER SYS COMP CAUSE & CORRECTIVE NO. DATE TYPE DUR REASON THE REACTOR NO. CODE- CODE ACTION TO PREVENT (1) (HRS) (2) OR. REDUCING (4) (5) RECURRENCE (6) (7) POWER (3) 595-03 950213 F 302.1 B 1 N/A TD - PSP Turbine taken off-line to repair .,

(8) turbine jacking oil. system structural concerns.

t 595-04 950314 5 18.1 B N/A 'N/A TA TRB Turbine taken off-line to perform i post outage balancing.

I S95-05 950316 5 20.6 B N/A N/A TA TRB Turbine taken off-line to obtain turbine coastdown bearing vibration data.

595-06 950326 F 47.8- B N/A N/A TJ . PSP Turbine taken off-line to repair +

a stator cooling water vent line leak.

(1) F FORCED (2) REASON: (3) METHOD: (4) INSTRUCTIONS FOR ,

5: SCHEDULED' A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA '

S - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER). FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F'- ADMINISTRATIVE '9 - OTHER G - OPERATIONAL ERROR (EXPLAIN) '

H - OTHER (EXPLAIN) (S) 1AME SOURCE AS (4)

(6) R - PREFIX INDICATES POWER REDUCTION.

S - PREFIX INDICATES PLANT SHUTDOWN.

(7) DURATION OF REDUCTIONS REPORTED AS ZERO PER REG.

GUIDE 1.16 REV. 4

-(8) Outage hours are a continuation of the outage which began on 02/13/95.

I 4