Monthly Operating Rept for Jan 1995 for Fermi 2
ML20078R005
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 01/31/1995
From: Mckeon R, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-95-0016, CON-NRC-95-16 NUDOCS 9502220160
Download: ML20078R005 (4)


Text

Robert McKeon

  • en Austant Vice Preswhat 5

. and Marwrr, opwatos Detroit OLb o ... s., j Edison JmA"=""** ** 1

)

1 1

Reg Guide 1.16 I February 15, 1995 NRC-95-0016 U. S. Nuclear hegulatory Consission Attention: Document Control Desk Washington, D.C. 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for January, 1995 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January, 1995. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

Sincerely,

/f N' Enclosure cc: T. G. Colburn D. R. Hahn J. B. Martin M. P. Phillips P. L. Torpey A. Vegel

,,nnn 9502220160 950131 [ t PDR ADOCK 05000341 F R PDR

\\

c rd

. . l OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY B. J. Stone DATE February 15, 1995 TELEPHONE (313) 586-5148 OPERATING STATUS

1. UNIT NAME: Fermi 2 l Notes: (1) Calculated using weight-l
2. IlEPORTING PERIOD: January, 1995 I ed averages to reflect variations i 3 LICENSED TiiERMAL POWER (MWt): 3430 l In rating (MDC and DER). l
4. NAMEPLATE RATING (GROSS MWe): 1179 l (2) Currently limiting power to l
5. DESIGN ELECT RATING (Net MWe): 1116 l 80% CTP maximum for Startup Test 1 i
6. MAX DEPENDABLE CAP (CROSS MWe):1135 l Program. All ratings reflect 98% l l
7. MAX DEPENDABLE CAP (Net MWe):1085 l CTP due to turbine throttle valve l l limitations. l
8. IF CllANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TliROUGli 7) SINCE LAST REPORT, GIVE REASONS: N/A 9 POWER LEVEL TO WlilCil RESTRICTED, IF ANY (MWe Net): (2)
10. REASONS FOR RESTRICTION, IF ANY: (2)

THIS MONTH YR TO DATE CUMULATIVE

11. liRS IN REPORTING PERIOD 744 744 61.574 '
12. HHS REACTOR WAS CRITICAL 668.8 668.8 41,404.4
13. REACT 0ll RESERVE SHUTDOWN HRS 0 0 0  ;
14. Il0URS GENERATOR ON-LINE 211.5 211.5 39,335.9
15. UNIT RESERVE SHUTDOWN 110VRS 0 0 0
16. Git 0SS THERMAL ENERGY GEN (MWil) 488,352 488,352 120,202,403
17. GROSS ELECT ENERGY GEN (MWil) 74,910 74,910 40,048,867
18. NET ELECT ENERGY GEN (MWil) 68,060 68,060 38,301,775
19. UNIT SERVICE FACTOR 28.4 28.4 63.9
20. UNIT AVAILABILITY FACTOR 28.4 28.4 63.9 I
21. UNIT CAP FACTOR (USING MDC NET) 8.4 8.4 57.9(1)
22. UNIT CAP FACTOR (USING DER NET) 8.2 8.2 56.5(1)
23. UNIT FORCED OUTAGE RATE 66.9 66.9 21.6
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH):
25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:

FEBRUARY 12, 1995.

26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACilIEVED '

INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A

J AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT FERMI 2 DATE February 15, 1995 COMPLETED BY T. Lovell  ;

TELEPHONE (313) 586-5027 Month January, 1995 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (HWe-Net) (NWe-Net) 1 0 17 0 2 0 18 4 3 0 19 112 >

4 0 20 106 5 0 21 125 6 0 22 295 i 7 0 23 453 l l

8 0 24 503 l

9 0 25 503 l 10 0 26 555 11 0 27 188 1 12 0 28 0 13 0 29 0

)

14 0 30 0  !

15 0 31 0 16 0 l

l l

4 UNIT SHUTDOWN 5 AND POWER REDUCTIONS DOCKET NG. 50-341 DATE FebruaPY 15. 1995 UNIT NAME Feemi 2 COMPLETED BV B. J. Stone .

TELEPHONE (313) 586-5148 REPORT MONTH Janua v. 1995 i I 1 j i METHOD 08 i

! i i i l l SMUTTING DOwN ! LER l Sv5 l COMP I I  ! l CAUSE & CORRECTIVE l NO. l DATE l TYPE ! DUu j REASON l THE REACTOD i NO. l CODE i CODE I ACTION TO PREVENT l l (1) I (HR5)] (2) l OR REDUCING  ! l f4) l (5) l RECURRENCE (6) i l I (T) l l PowEn (3) l l l l l l 1 (8) f I  !  ! I l i i  ! l i i i i I i 593-06 l 931225 l c l 425 I A i 3 193-014 I TA TRB . Reactor tripped following trip of I I I l l l l  :

main turbine. Turbine tripped cue I I 1 i i i to imbalance caused by loss of 5 8th l l l l l l l  : stage blades in to= pressure turbine l l I

! l j j l i l i inumber 3. Operation without 7th and i l I l8th stages in all three LP turbines l I l l l l l lis planned for upcoming operating i l l l l

l cycle. Operation without stages 7 l l and 8 mill prevent recurrence.

I I l I I l 595-01 950127 l 5 l107.5 8 1 N/A l TA i TRB l Turbine taken off-line to perform l } l l } l l post outage balancing.

1 I I  ! I I I I (1) F: FORCED (2) REASON: (3) METHOD: (4) INSTRUCTIONS FOR 5: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C- REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE D- REGULATORY RESTRICTION 4 - CONTINUED (NUREG-1022)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)

H - OTwER (EXPLAIN) (5) SAME SOURCE AS (4)

(6) R - PREFIX INDICATES POWER REDUCTION.

5 - PREFIX INDICATES PLANT SHUTDOWN.

(7) DURATION OF REDUCTIONS REPORTED A5 ZERO PER REG.

GUIDE 1.16 REV. 4 (8) Outage hours are a continuation of the outage which began on 12/25/93.