Monthly Operating Rept for Sept 1993 for Fermi 2
ML20058P173
Person / Time
Site: Fermi 
Issue date: 09/30/1993
From: Gipson D, Pirkle R, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-93-0117, CON-NRC-93-117, RTR-REGGD-01.016, RTR-REGGD-1.016 NUDOCS 9310220136
Download: ML20058P173 (4)


Text

.

. Douglas R. Gipson Sernor Vrr.e Prescent Hudear G%vatwn

.DOITOlI r-u i

Edison

,4D0NorthDuieHighway f

amas.sm Reg Guide 1.16:

y October 15.-1993 NRC-93-0117 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555 i

Reference:

Fermi 2 NRC Docket No. 50-341 NRC License No. NPF-43

Subject:

Monthly Operating Status Report for September, 1993-e Enclosed for'your information and use is the Fermi 2 Monthly Operating Status Report for September, 1993 This report-incluct:s the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9 1.6.

If you have any questions, please contact Brian Stone, at (313) 586-5148.

i Sincerely, I

Enclosure

.l cc:

T. G. Colburn l

D. R. Ilahn W. J. Kropp l

J. B. Martin t

M. P. Phillips P. L. Torpey 220095

{D 9310220136 930930 PDR. ADOCK 05000341 2

[Q R

PDR

.jj lIo

OPERATING DATA REPORT DOCKET NO.

50-341 COMPLETED BY B. J. Stone DATE October 15, 1993 TELEPliONE (313) 586-5148

.]

OPERATING STATUS 1.

UNIT NAME:

Fermi 2 l Notes:

(1) Calculated using weight-l ;

2.

REPORTING PERIOD: September, 1993 I ed averages to reflect variations l'

3 LICENSED THERMAL POWER (MWt):

3430 l in rating (MDC and DER).

l 1

4.

NAMEPLATE RATING (GROSS MWe):

1179 l (2) Currently limiting power to l

S.

DESIGN ELECT p' PING (Net MWe): 1116 l 93 5% CTP aw.imum to limit turbine l

6.

MAX DEPENDAB.E Cle (GROSS MWe):1135 l component vibration. All ratings l

7 MAX DEPENDABLE CAP (Net MWe):1085 __ l reflect 98% CTP due to turbine l l l throttle valve limitations.

l'!

8.

IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS:

N/A 9

POWER LEVEL TO WilICH RESTRICTED, IF ANY (MWe Net):

(2) t

10. REASONS FOR RESTRICTION, IF ANY:

(2)

THIS MONTH YR TO DATE CUMULATIVE

11. IUIS IN REPORTING PERIOD 720 6.551 49,861
12. HRS REACTOR WAS CRITICAL 646.5 6,087.6 38,490.8
13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. Il0URS GENERATOR ON-LINE 627.6 6,023 1 37,070.2
15. UNIT RESERVE SHUTDOWN HOURS 0

0 0

16. GROSS THERMAL ENERGY GEN (MWH) 1,879,176 19,188,768 113,276,063
17. GROSS ELECT ENERGY GEN (MWH) 622,650 6,466,400 37,794,147
18. NET ELECT ENERGY GEN (MWH) 594,308 6,197,576 36,146,577

+

19. UNIT SERVICE FACTOR 87.2 91.9 74.4
20. UNIT AVAILABILITY FACTOR 87 2 91 9 74.4
21. UNIT CAP FACTOR (USING MDC NET) 76.1 87.2 67.6 g
22. UNIT CAP FACTOR (USING DER NET) 74.0 84.8 66.1 I
23. UNIT FORCED OUTAGE RATE 3.4 3.5 7.1
24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTilS (TYPE, DATE, DURATION OF EACH):

REFUELING: STARTS MARCH 12, 1994:

DURATION 50 DAYS

25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i

i s.-..

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT FERMI 2 1

DATE October 15, 1993 COMPLETED BY R. Pirkle TELEPHONE (313) 586-5027 Month September, 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 1024 17 496 2

1014 18 0

3 1014 19 0

4 1024 20 0

5 1021 21 85 6

1026 22 495 7

1028 23 951 8

951 24 966 9

957 25 972 10 969 26 861 11 980 27 1030 12 970 28 1038 13 959 29 1044 14 948 30 1044 15 973 31 N/A 16 979

3 5

4 UNIT SHUTDOWNS AND POWER REDUCTIONS DOCMET NO.

50-341 DATE Octobe" 15. 1993

/

I UNIT NAME Fermi 2 COMPLETED BY B.

J.

Stone TELEPHONE (313) 586-5148 i

REPORT MONTH September. 1993 l

} METHOO 05 l

i l

1 SHUTTING DOWN I LER SVS Coup CAUSE & CORRECTIVE NO.

DATE TYPE DUR l REASON l THE REACTOR l

NO.

CODE CODE A CTION TO PREVENT l

l (1)

(HRS)

(2; l OR REDUCING l

(4)

(5)

RECURRENCE l

(6) i (7)

! POWER (3) i $93-0Sa l09/17/93 5

i 70.4 8

2 93-013 SN LCV wnite shutting down to repair a l

}

l l

I heater drain system leve! control l

l

- valve. pressure integrity was lost i

I due to maintenance activities on the valve.

This resulted in leakage l

from the feecuater system which was l

terminated after the reactor was manually scrammed from 17% power and the feedwater system was shutdown.

Repairs have been completed on the level control valve and improved work sequence controls are in place

[

to prevent recurrence.

I 593-05b 09/20/93 F

22 8

1 TA 52 During startup, the main turbine turning gear circuit breaker failed.

The reactor was shutdown to mini-mize differential heating of the turbine shaft during the time that turning gear was out of service.

The turning gear breaker has been replaced.

I (1) F: FORCED (2) REASON:

(3) METHOD:

(4) INSTRUCTIONS FOR S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AU-TOMATIC SCRAM EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4-CONTINUED (NUREG-1022)

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD i

F - ADMINISTRATIVE 9 - OTHER G - OPERATIONAL ERROR (EXPLAIN)

H - OTHER (EXPLAIN)

(5) SAME SOURCE AS (4)

(6) R - PREFIX INDICATES POWER REDUCTION.

5 - PREFIX INDICATES PLANT SHUTDOWN.

(T) DURATION OF REDUCTIONS REPORTED A5 ZERO PER REG.

GUIDE 1.16 REV. 4 I

- ---