NRC-93-0019, Monthly Operating Rept for Jan 1993 for Fermi 2

From kanterella
Jump to navigation Jump to search
Monthly Operating Rept for Jan 1993 for Fermi 2
ML20128L815
Person / Time
Site: Fermi 
Issue date: 01/31/1993
From: Orser W, Stone B
DETROIT EDISON CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
CON-NRC-93-0019, CON-NRC-93-19 NUDOCS 9302220017
Download: ML20128L815 (4)


Text

r:

m. N Wilitam S. Orser omw. va e,.s.ni Nsc4ar Generatica eM
I~ eY~:

-DOIfOil

"""' 2 Edison

=400 Norin Dme Rg'ieay 6

gg r=r"-

"e8 o"tda ' '6 February 15, 1993 NRC-93-0019 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington, D.C.

20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF

Subject:

Monthly Operating Status Report for January, 1993 Enclosed for your information and use is the Fermi 2 Honthly Operating Status Report for January, 1993 This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulhtory Guide-1.16 and Fermi 2 Technical Specification 6.9.1.6.

If you have any questions, please contact. Brian Stone, at (313) 586-5148.

Sincerely, i

l Enclosure cc:

T. G. Colburn A. B. Davis D. R. Hahn W. J. Kropp H. P. Phillips P. L. Torpey l-220005 4pf 9302220017 930131

/ i)

.ADOCKOS00g1 PDR R

e

.~

OPERATING DATA REPORT

-DOCKET NO.

50-341

' COMPLETED BY

'B. J. Stone I

DATE

. February 15, 1993 TELEPHONE (313) 586-5148 OPERATING STATUS'

1.

UNIT NAME:

Fermi 2 l Notes:- (1). Calculated using weightAl 2.-

REPORTING PERIOD: January, 1993 l ed. averages to reflect var.lationsi :l:

3 LICENSED THERMAL POWER (MWt):

3430 l in. rating (MDC and. DER).:

li 4.

NAMEPLATE' RATING'(GROSS MWe):

1179

_1,(2) Current 1y' operating at.98% CTPa l!

5.

DESIGN ELECT RATING (Net MWe): 1116 l maximum due to throttle valve

' ll 6.

MAX DEPENDABLE CAP (GROSS MWe):1135 l limitations at the current operatingt:

1 7

MAX DEPENDABLE CAP (Not MWe):1085 l pressure limit; all ratings reflectil l this power level.

l-8.

IF CHANGES OCCUR IN CAPACITY RATINGS.(ITEMS NUMBER 3 THROUGH'7) SINCE.

LAST REPORT, GIVE REASONS: Maximum dependable capacities revised based on performance demonstration.

l 9.

POWER LEVEL TO WHICl! RESTRICTED, IF ANY (MWe Net):

(2):

10. REASONS FOR RESTRICTION, IF ANY:

(2)

THIS MONTH YR TO DATE CUMULATIVE

11. HRS IN REPORTING PERIOD 744 744 44,054
12. HRS REACTOR WAS CRITICAL 744 744~

33,147.2-

13. REACTOR RESERVE SHUTDOWN HRS 0

0 0

14. HOURS GENERATOR ON-LINE 744

-744 31,791.1-

15. UNIT RESERVE SHUTDOWN HOURS' O

O 0

16. GROSS THERMAL ENERGY GEN (HWH) 2,393,112 2,393,112-196,480,407.4
17. GROSS ELECT ENERGY GEN (MWH) 825,860 825,860-32,153,607
18. NET ELECT ENERGY GEN (HWH) 794,453 794,453 30,743,454'
19. UNIT SERVICE FACTOR 100 100 72.2
20. UNIT AVAILABILITY FACTOR 100 100 72.2-
21. UNIT CAP. FACTOR (USING MDC NET) _,

98.4 98.4 65.2 (1):

22. UNIT CAP FACTOR (USING DER NET) 95.7 (1) __ 95.7 (1) 63.8-(1)

E

'23. UNIT FORCED OUTAGE RATE O

0 7.6

24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS-(TYPE, DATE, DURATION OF EACH):

i

25. IF SHUT DOWN AT-END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP:
26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL' OPERATION):

FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A o -

1

. :-s AVERAGE DAILY UNIT POWER LEVEL' DOCKET NO.

50-341 UNIT FERMI 2 DATE February 15. 1993 COHPLETED BY E. Dawson TELEPHONE (313) 586-5027 Month January, 1993 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)

(MWe-Net) 1 977 17 1120 2

977 18 1123 3

930 19

__ 1124 4

950 __

20 1124 5

962 21 1116 6

973 22 934 7

972 23 1117 8

977 24 1116 9

1035 25

__ 1121 10 1120 26 1121 11 1121 27 1120 12 1120 28

  • 119 13 1116 29

_ 1121 14 1120 30 1118 15 1121 -

31 1112 16 1101

m I

'."4

'?

rx t.:

/

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO.

50-341' DATE February 15. 1993 '~

'JNIT HAME Fermi ?

COMPLETED SV B. J. Stone b

TELEPHONE (313) 596-5148 REPORT MOP!TH January. 1993 4

4 i

METHOD OF l

7 SHUTTING DOWN LER SYS COMP CAUSE & CORRECTIVE NO.

DATE TYPE DUR REASON THE REACTOR NO.

' CODE CODE ACTION TO PREVENT (1)

(HRS)

(2)

.OR REDUCING (4)

(5) l RECURRENCE (6)

(7)

POWER (3) l-g --_

i" I

t (1) Fr FORCED

'(2) REASONr (3) METHOD:

(4). INSTRUCTIONS FOR 5 -SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL,

' PREPARATION OF' DATA B - MAINTENANCE'CR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE C - REFUELING 3 - AUTOMATIC SCRAM EVENT REPORT (LER) FILE-D - REGULATORY RESTRICTION 4 : CONTINUED (NUREG-1022)-

E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F -' ADMINISTRATIVE'.

G - OPERATIONAL ERROR'(EXPLAIN).

.9 - OTHER h - OTHER (EXPLAIN)'

'(5) SAME' SOURCE AS.(4)

(6) R - PRCFIX INDICATES POWER REDUC 110N.

5 - PREFIX INDICATES PLANT'

. SHUTDOWN.

(7) DURATION OF REDUCTIONS' REPORTED'AS ZERO PER REG.

GUIDE 1.16 REV. 4 1

9 1

"i 2.

1 4

+:

~

--.2