Text
O l
U,L,,,h/n'i mor cm.m,n.
Reg Guide 1.16 si C son NMiN 0%
March 15, 1990 NRC-90-0046 U. S. Nuclear Regulatory Commission
)
Attention: Document Control Desk Washington, D.C.
20555
Reference:
Feral 2 NRC Docket No. 50-341 i
NRC Operating License No. NPP-43
Subject:
Monthly Operating Status Report for February, 1990 1
Enclosed for your information and use is the Feral 2 Honthly Operating Status Report for February, 1990. This report includes j
1 the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
If you have any questions, please contact Patricia Anthony at (313) 586-1617.
Sincerely, i
W. S. Orser Vice President Nuclear Operations Enclosure cc A. B. Davis J. R. Eckert D. R. Hahn R. W. DeFayette/W. L. Axelson T. R. Quay W. G. Rogers 9003200119 900228 Pi
- g)'
lJ PDR ADOCK 05000341 R
$0hY
///
ir OPERATING DATA REPORT o
t DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE March 15, 1990 TELEPil0NE (313) 586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 INotes:
1 2.
REPORTING PERIOD: February, 1990 l # To be determined 1
3 LICENSED THERMAL POWER (MWL): 3293 l
l 4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l S.
DESIGN ELECT RATING (Net MWe): 1075 l
l 6.
MAK DEPENDABLE CAP (CROSS MWe):
l l
7.
MAX DEPENDABLE CAP (Net MWE):
l l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 TIIROUGil 7) SINCE LAST REPORT, GIVE REASONS:
None 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTil YR 'IO DATE CUMULATIVE
- 11. HRS IN REPORTING PERIOD 672 1416 18,422 l
- 12. HRS REACTOR WAS CRITICAL 672 1416 12,512 9
- 13. REACTOR RESERVE SHUTDOWN llRS 0
0 0
- 14. HOURS GENERATOR ON-LINE 672 1416 11,712.8
- 15. UNIT RESERVE Sl!UTDOWN HOURS 0
0 0
- 16. GROSS TIIERMAL ENERGY GEN (HWH) 2,099,160 4,482,768 33,844,730
- 17. GROSS ELECT ENERGY GEN (HWil) 709,850 1,514,330 11,258,687
- 18. NET ELECT ENERGY GEN (MWH) 681,267 1,452,990 10,765,841
- 19. UNIT SERVICE FACTOR 100 100 63.6
- 20. UNIT AVAILABILITY FACTOR 100 100 63.6
- 22. UNIT CAP FACTOR (USING DER NET) 94.3 95.5 53.6
- 23. UNIT FORCED OUTAGE RATE O
O 15.9
- 24. SIIUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE, DURATION OF EACH)
None.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INITIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A i
1
AVERAGE DAILY UNIT POWER LERlL l
i DOCKET NO.
50-341 UNIT FERMI 2 DATE March 15, 1990 COMPLETED BY E. Dawson TELEP110NE (313) 586-5027 Month February, 1990 DAY AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net)
(MWe-Net) 1 1074 17 1034 2
1056 18 1079 3
1081 19 1077 4
1084 20 1080 5
1080 21 1072 6
1076 22 1071 7
1075 23 1059 8
1071 24 1074 9
1050 25 1079 10 1077 26 1078 11 991 27 1072 12 498 28 1078 13 535 29 14 768 30 15 1040 31 16 1034 i
l r
e.---
r
.. ~,. _ _. _
e tpeIT SMUTDOWN5 Ace PERfER REDUCTIONS -
,e
..DOCMET NO.
50-341 DATE
- march 15._1990
~
UNIT NAME Feret 2 COMPLETED BV P.
W.' Anthony TELEPHONE-(3133566-1617 REPORT WONTH '
Februsey. 1990 i
i 1
l I
i 1
l I
I l-METHOD OF LER' I SYS l CODP I CAUSE & CORRECTIVE I
NO.
'DATE-l TVPE (HRS)l REASON DUR SHUTTING DowN
. NO. l CODE l CODE l
- CTt0N TO PREVENT l'
I (1)
I (2)
THE REACTOR I (4) I (5) !
REOtRRENCE'
]
i I
(3)
I
{
l I
I i
I I
I I
f f
4 4
6 i
i i
1 02/11/90 l 5 1
l A
1 5
l
-l SG I CONO. l Reduced pe=ee to appronimetely 50%
l~
4 90-002 i
l
~l l
l l
1.
l l
I of rated power in order to plug e l l
l l
l l
l l'
l tube lemb in the mest side of the l
I I
I I
I l
l condenser and repair a seen seek I
l 1
. l l
.I l
l
{ on a hestee feed pump.
Performed i
l l
I i
l l additlonel scheduled meintenance
~l l
l
}
l l
l
{'while et a reduced power levet.
~l
~'
I F
t 1
i l
i I
I (1) F: FORCED (2) REASON:
(3) WETHOO:
(4) EXHIBIT G - INSTRUCTIONS S: SCHEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - #AINTENANCE OR TEST 2 - MANUAL SCRAM ENTRV SHEETS FOst LICENSEE C - REFUELING 3 - AUTOMATIC scram EVENT REPORT (LER) FILE O - REG' LATORY RESTRICTION -
4 - CCNTINUED (NUREG-0161)
J E - OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EXPLAIN)
H - OTHER (EXPLAIN)
'(5) EXHIBIT 1-SAME SOURCE.