Text
I1 1
..,,. * ?::
^
i
. Wilhem s. Orser -
$['IE!?e% tion.
Reg Guide 1.16 b].
lI-r rmi24 e,4oo worin omie H.ph*ay Nuclear ISOn Newport Michigan 481f4 Generation O'3)655*
December 15. 1989 NRC-89-0254 4
U.
S.. Nuclear Regulatory Commission Attention:
Document Control Desk Washington, D.C.
20555
Reference:
Fermi 2 NRC Dochet No.
50-341 NRC Operating License No.
NPF-43 i
Subject:
Menthly Operating Status Report for November, 1989 Enclosed for your.information and use is the Fermi 2 Honthly Operating Status Report for November, 1989.
This report includes the Operating Data Report. Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 6.9.1.6.
If.you have-any. questions, please contact Patricia-Anthony at (313)' 586-1617.
Sincerely.
j c
l.
/
l ji.
l.
Enclosure cc:
A.
B.
Davis l
J.
R.
Eckert D.
R.
Hahn R.
W.
Defayette/W.
L.
Axelson L
T.
R.
Quay l
W.
G.
Rogers 8912210069 891130
-[/2 f
'PDR ADOCK.05000341 L
iR PDC
/' i g
- o
e OPERATING DATA REPORT
-7 DOCKET NO. 50-341 COMPLETED BY P. M. Anthony DATE December 15, 1989 TELEPHONE (313)586-1617 OPERATING STATUS 1.
UNIT NAME:
Fermi 2 l Notes:
l l
2.
REPORTING PERIOD: November, 1989 l
l 3
LICENSED THERMAL POWER (MWt): 3292 l # To be determined i
4.
NAMEPLATE RATING (GROSS MWe):
1154 l
l 5.
DESIGN ELECT RATING (Net MWe): 1093 I
l 6.
MAX DEPENDABLE CAP (GROSS MWe):
l l
7 MAX DEPENDABLE CAP (Net MWE):
I l
8.
IF CHANGES OCCUR IN CAPACITY RATINGS (ITEMS NUMBER 3 THROUGH 7) SINCE LAST REPORT, GIVE REASONS: None 9.
POWER LEVEL TO WHICH RESTRICTED, IF ANY (MWe Net):
None
- 10. REASONS FOR RESTRICTION, IF ANY: None THIS MONTH YR TO DATE CUMULATIVE I
- 11. HRS IN REPORTING PERIOD 720 8016 16,262
- 12. HRS REACTOR WAS CRITICAL 0
5613 10,635 5
- 13. REACTOR RESERVE SHUTDOWN HRS 0
0 0
- 14. HOURS GENERATOR ON-LINE O
5290.2 10,011
- 15. UNIT RESERVE SHUTDOWN HOURS 0
0 0
- 16. GROSS THERMAL ENERGY GEN (MWH) 0 15,854,286 28,883,738
- 17. GROSS ELECT ENERGY GEN (MWH) 0 5,343,904 9,622,608
-18. NET ELECT ENERGY GEN (MWH) 0 5,117,826 9,199,960
- 19. IchlT SERVICE FACTOR 0
66.0 _
61.6
- 20. UNIT AVAILABILITY FACTOR 0
66.0 61.6
- 22. UNIT CAP FACTOR (USING DER NET) _
- 23. UNIT FORCED OUTAGE RATE O
10.7 17.6
- 24. SHUTDOWNS SCHEDULED OVER NEXT 6 MONTHS (TYPE, DATE. DURATION OF EACH)
The first refueling outage began on September 5, 1989. The unit achieved criticality on December 8, 1989.
- 25. IF SHUT DOWN AT END OF REPORT PERIOD, ESTIMATED DATE OF STARTUP: N/A
- 26. UNITS IN TEST STATUS (PRIOR TO COMMERCIAL OPERATION):
FORECAST ACHIEVED INITIAL CRITICALITY N/A N/A INETIAL ELECTRICITY N/A N/A COMMERCIAL OPERATION N/A N/A
r.
,8
.r AVERAGEDAILY'UNiTPOWERLEVEL
- l r.
DOCKET NO.
50-341 UNIT FERMI 2 DATE December 15, 1989 f
COMPLETED BY P. M. Anthony TELEPHONE (313) 586-1617 Month.
November, 1989 DAY ' AVERAGE DAILY POWER LEVEL DAY AVERAGE DAILY POWER LEVEL (MWe-Net).
(MWe-Net) 1 0
17 0
s 2
0 18 0
.3 0
19 0
4' O
20 0
5 0
21 0
6 0
22 0
7 0
23 0
. 8' O
24 0
9-0 25 0
10 0
26 0
11 0
27 0
12 0
28 0
13 0
29 0
14 0
30 0
15 0
31 N/A 16 0
.; 3
~'
^
(-k?"
R
~
~
. UNIT SHUTDOWNS AND POWER REDUCTIONS
. C-'
"1 s
Y
- s[
.f DOCKET NO.
50-341 D AT E..
. December 15. '999 g
- UNIT NAME
~ Fermi 2 COMPLETED ev..
p.
- u. Anthon<
5 TELEPH3NE (313)586-1617-REPORT MONTH November, 1989 l-i I
' I i
i i
I' 1
1 t usTHOD OF I 'LER
' SY S l COMP 1
CAUSE & CORRECTIVE 1
NOs DATE l TVPE l. DUR REASON
.I SHUTTING DOWN I NO.
CODE' CODE l-
'ACTIOM TO PREVENT
]
i (1). 1 (HRS)
(2)
THE-REACTOR (4)
(5).I AECURRENCE I
l (3) l
{
l I.
4-N/A Continuec m'th refueling activities09-011
-! 09/05/89.
S 720 C
i including leak rate testing, j
l l
l tureire inspection and repair and I
l l
l I
I fuel handling.
l i
f 1
I I
'l (1) F: FORCED (2) REASON:
(3) METHOD:
( 4 )' EXHIBIT.G - INSTRUCT!CNS 5: SCMEDULED A - EQUIPMENT FAILURE (EXPLAIN) 1 - MANUAL FOR PREPARATION OF DATA B - MAINTENANCE OR TEST 2 - MANUAL SCRAM ENTRY SHEETS FOR LICENSEE.
C - REFUELING 3 - AUTOMATIC SCRAu EVENT REPORT (LER) FILE D - REGULATORY RESTRICTION 4 - CONTINUED (NUREG-0161)
E-OPERATOR TRAINING & LICENSE EXAMINATION 5 - REDUCED LOAD F - ADMINISTRATIVE 9 - OTHER G.- OPERATIONAL ERROR (EAPLAIN)
H - OTHER (EXPLAIN)'
(5) EXHIBIT 1 - SAME SOURCE