Fermi 2 6400 North Dixie Idwy., Newport, MI 48166 Detroit Edison I

Generic Letter 97-02 April 12, 2005 NRC-05-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for March 2005 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March 2005. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 5864258.

Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

E. R. Duncan N. K. Ray M. V. Yudasz, Jr. ,,:-k, Z NRC Resident Office Regional Administrator, Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE April 12,2005 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: March 2005

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (MWe-Net) 1.089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 744 1,884 117,685
4. Number of Hours Generator On-line 744 1,845 113,619
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 836.444 2,058,212 115,134,890 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Cause and Corrective Action F: Forced (Hours) (1) Shutting Comments S: Scheduled Down (2)

N/A

SUMMARY

The plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of March 2005.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Fermi 2 6400 North Dixie Idwy., Newport, MI 48166 Detroit Edison I

Generic Letter 97-02 April 12, 2005 NRC-05-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for March 2005 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March 2005. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 5864258.

Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

E. R. Duncan N. K. Ray M. V. Yudasz, Jr. ,,:-k, Z NRC Resident Office Regional Administrator, Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE April 12,2005 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: March 2005

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (MWe-Net) 1.089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 744 1,884 117,685
4. Number of Hours Generator On-line 744 1,845 113,619
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 836.444 2,058,212 115,134,890 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Cause and Corrective Action F: Forced (Hours) (1) Shutting Comments S: Scheduled Down (2)

N/A

SUMMARY

The plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of March 2005.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)