NRC-05-0031, March 2005 Monthly Operating Report for Fermi 2
| ML051090244 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 04/12/2005 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC-05-0031 | |
| Download: ML051090244 (2) | |
Text
Fermi 2 6400 North Dixie Idwy., Newport, MI 48166 Detroit Edison I
Generic Letter 97-02 April 12, 2005 NRC-05-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for March 2005 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March 2005. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 5864258.
Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
E. R. Duncan N. K. Ray M. V. Yudasz, Jr. ,,:-k, Z NRC Resident Office Regional Administrator, Region III A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE April 12,2005 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: March 2005
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (MWe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 744 1,884 117,685
- 4. Number of Hours Generator On-line 744 1,845 113,619
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 836.444 2,058,212 115,134,890 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Cause and Corrective Action F: Forced (Hours) (1) Shutting Comments S: Scheduled Down (2)
N/A
SUMMARY
- The plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of March 2005.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Text
Fermi 2 6400 North Dixie Idwy., Newport, MI 48166 Detroit Edison I
Generic Letter 97-02 April 12, 2005 NRC-05-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for March 2005 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March 2005. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 5864258.
Sincerely Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
E. R. Duncan N. K. Ray M. V. Yudasz, Jr. ,,:-k, Z NRC Resident Office Regional Administrator, Region III A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE April 12,2005 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: March 2005
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (MWe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 744 1,884 117,685
- 4. Number of Hours Generator On-line 744 1,845 113,619
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 836.444 2,058,212 115,134,890 UNIT SHUTDOWNS No. Date Type Duration Reason Method of Cause and Corrective Action F: Forced (Hours) (1) Shutting Comments S: Scheduled Down (2)
N/A
SUMMARY
- The plant operated at full power (excluding small reactor power reductions for required surveillance testing) for the month of March 2005.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)