Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 July 8, 2004 NRC-04-0047 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for June 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for June 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincere orman K Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region III Region III
-9Z--6(
A DTE Energy Company
. OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 . :
DATE July 8. 2004.
COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: June 2004
- 1. Design Electrical Rating (MWe-Net) 1.150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 720 4.367 112.263
- 4. Number of Hours Generator On-line 720 4,367 108.376
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 788.170 4.816.605 109,440.173 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On June 5, 2004, at 0826 hours0.00956 days <br />0.229 hours <br />0.00137 weeks <br />3.14293e-4 months <br />, power was reduced from 100% to 93% for High Pressure Control Valve No. 2 circuit card replacement. Return to full power was completed at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />. On June 17, 2004, at 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br />, power was reduced from 100% to 99% for feedwater flow instrument loop calibrations. Return to full power was completed at 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br />. Qn June 19, 2004, at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, power was reduced from 100% to 97% for surveillance test on partially withdrawn control rods. Return to full power was completed at 0947 hours0.011 days <br />0.263 hours <br />0.00157 weeks <br />3.603335e-4 months <br />.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Text
Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 July 8, 2004 NRC-04-0047 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for June 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for June 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincere orman K Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region III Region III
-9Z--6(
A DTE Energy Company
. OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 . :
DATE July 8. 2004.
COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: June 2004
- 1. Design Electrical Rating (MWe-Net) 1.150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 720 4.367 112.263
- 4. Number of Hours Generator On-line 720 4,367 108.376
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 788.170 4.816.605 109,440.173 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On June 5, 2004, at 0826 hours0.00956 days <br />0.229 hours <br />0.00137 weeks <br />3.14293e-4 months <br />, power was reduced from 100% to 93% for High Pressure Control Valve No. 2 circuit card replacement. Return to full power was completed at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />. On June 17, 2004, at 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br />, power was reduced from 100% to 99% for feedwater flow instrument loop calibrations. Return to full power was completed at 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br />. Qn June 19, 2004, at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, power was reduced from 100% to 97% for surveillance test on partially withdrawn control rods. Return to full power was completed at 0947 hours0.011 days <br />0.263 hours <br />0.00157 weeks <br />3.603335e-4 months <br />.
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)