NRC-04-0047, June 2004 Monthly Operating Status Report for Fermi 2

From kanterella
(Redirected from NRC-04-0047)
Jump to navigation Jump to search
June 2004 Monthly Operating Status Report for Fermi 2
ML042010278
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 07/08/2004
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC-04-0047
Download: ML042010278 (2)


Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 July 8, 2004 NRC-04-0047 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for June 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for June 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincere orman K Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region III Region III

-9Z--6(

A DTE Energy Company

. OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 .  :

DATE July 8. 2004.

COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: June 2004

1. Design Electrical Rating (MWe-Net) 1.150.00
2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 720 4.367 112.263
4. Number of Hours Generator On-line 720 4,367 108.376
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 788.170 4.816.605 109,440.173 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On June 5, 2004, at 0826 hours0.00956 days <br />0.229 hours <br />0.00137 weeks <br />3.14293e-4 months <br />, power was reduced from 100% to 93% for High Pressure Control Valve No. 2 circuit card replacement. Return to full power was completed at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />. On June 17, 2004, at 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br />, power was reduced from 100% to 99% for feedwater flow instrument loop calibrations. Return to full power was completed at 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br />. Qn June 19, 2004, at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, power was reduced from 100% to 97% for surveillance test on partially withdrawn control rods. Return to full power was completed at 0947 hours0.011 days <br />0.263 hours <br />0.00157 weeks <br />3.603335e-4 months <br />.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Generic Letter 97-02 July 8, 2004 NRC-04-0047 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for June 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for June 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincere orman K Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region III Region III

-9Z--6(

A DTE Energy Company

. OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 .  :

DATE July 8. 2004.

COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: June 2004

1. Design Electrical Rating (MWe-Net) 1.150.00
2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 720 4.367 112.263
4. Number of Hours Generator On-line 720 4,367 108.376
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 788.170 4.816.605 109,440.173 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing) with the following exceptions: On June 5, 2004, at 0826 hours0.00956 days <br />0.229 hours <br />0.00137 weeks <br />3.14293e-4 months <br />, power was reduced from 100% to 93% for High Pressure Control Valve No. 2 circuit card replacement. Return to full power was completed at 1525 hours0.0177 days <br />0.424 hours <br />0.00252 weeks <br />5.802625e-4 months <br />. On June 17, 2004, at 0606 hours0.00701 days <br />0.168 hours <br />0.001 weeks <br />2.30583e-4 months <br />, power was reduced from 100% to 99% for feedwater flow instrument loop calibrations. Return to full power was completed at 1826 hours0.0211 days <br />0.507 hours <br />0.00302 weeks <br />6.94793e-4 months <br />. Qn June 19, 2004, at 0845 hours0.00978 days <br />0.235 hours <br />0.0014 weeks <br />3.215225e-4 months <br />, power was reduced from 100% to 97% for surveillance test on partially withdrawn control rods. Return to full power was completed at 0947 hours0.011 days <br />0.263 hours <br />0.00157 weeks <br />3.603335e-4 months <br />.

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)