NRC-04-0031, April 2004 Monthly Operating Report for Fermi 2
| ML041330376 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/06/2004 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| GL-97-002, NRC-04-0031 | |
| Download: ML041330376 (2) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, MI 4S166 Detroit Edison Generic Letter 97-02 May 6, 2004 NRC-04-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for April 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for April 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerel Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region III A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE May 6, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: April 2004
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 719 2,903 110,799
- 4. Number of Hours Generator On-line 719 2,903 106,912
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 800,538 3,208,457 107,832,025 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A____IIII___ _
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing).
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)
Text
Fermi 2 6400 North Dixie Hwy., Newport, MI 4S166 Detroit Edison Generic Letter 97-02 May 6, 2004 NRC-04-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for April 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for April 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerel Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.
D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.
NRC Resident Office Regional Administrator, Region m Region III A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE May 6, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: April 2004
- 1. Design Electrical Rating (MWe-Net) 1,150.00
- 2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
- 3. Number of Hours the Reactor Was Critical 719 2,903 110,799
- 4. Number of Hours Generator On-line 719 2,903 106,912
- 5. Reserve Shutdown Hours 0.00 0.00 0.00
- 6. Net Electrical Energy Generated (MWH) 800,538 3,208,457 107,832,025 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A____IIII___ _
SUMMARY
- The plant operated at full power during the month (excluding small power reductions for required surveillance testing).
(1) Reason: (2) Method:
A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)
F Administration G Operational Error (Explain)
H Other (Explain)