NRC-04-0031, April 2004 Monthly Operating Report for Fermi 2

From kanterella
(Redirected from NRC-04-0031)
Jump to navigation Jump to search
April 2004 Monthly Operating Report for Fermi 2
ML041330376
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 05/06/2004
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
GL-97-002, NRC-04-0031
Download: ML041330376 (2)


Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 4S166 Detroit Edison Generic Letter 97-02 May 6, 2004 NRC-04-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for April 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for April 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerel Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region m Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE May 6, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: April 2004

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 719 2,903 110,799
4. Number of Hours Generator On-line 719 2,903 106,912
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 800,538 3,208,457 107,832,025 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A____IIII___ _

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing).

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)

Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 4S166 Detroit Edison Generic Letter 97-02 May 6, 2004 NRC-04-0031 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for April 2004 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for April 2004. This report includes the Operating Data Report and Summary of Unit Shutdowns identified in NRC Generic Letter 97-02 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerel Norman K. Peterson Manager - Nuclear Licensing Enclosure cc: R. J. Aben, Jr.

D. P. Beaulieu E. R. Duncan M. V. Yudasz, Jr.

NRC Resident Office Regional Administrator, Region m Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 UNIT NAME Fermi 2 DATE May 6, 2004 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 REPORTING PERIOD: April 2004

1. Design Electrical Rating (MWe-Net) 1,150.00
2. Maximum Dependable Capacity (Mwe-Net) 1.089.00 This Month Year-to-Date Cumulative
3. Number of Hours the Reactor Was Critical 719 2,903 110,799
4. Number of Hours Generator On-line 719 2,903 106,912
5. Reserve Shutdown Hours 0.00 0.00 0.00
6. Net Electrical Energy Generated (MWH) 800,538 3,208,457 107,832,025 UNIT SHUTDOWNS No. Date Type Duration Reason (1) Method of Cause and F: Forced (Hours) Shutting Corrective Action S: Scheduled Down (2) Comments N/A____IIII___ _

SUMMARY

The plant operated at full power during the month (excluding small power reductions for required surveillance testing).

(1) Reason: (2) Method:

A Equipment Failure (Explain) 1 Manual B Maintenance or Test 2 Manual Trip/Scram C Refueling 3 Automatic Trip/Scram D Regulatory Restriction 4 Continuation E Operator Training and License Examination 5 Other (Explain)

F Administration G Operational Error (Explain)

H Other (Explain)