NRC-03-0089, October 2003 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
October 2003 Monthly Operating Report for Fermi 2
ML033210191
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 11/06/2003
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-0089
Download: ML033210191 (4)


Text

Fermi 2 6400 North Dixie Hwy., Newport, Al 48166 Detroit Edison Reg. Guide 1.16 November 6, 2003 NRC-03-0089 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for October 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for October 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

H. K. Chernoff J. E. Dyer M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III

.-I--I I'A

-6 A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY Kevin Burke DATE November 6, 2003 TELEPHONE (734) 586-5148 OPERATING STATUS

1. Unit name: Fermi 2
2. Reporting period: October 2003
3. Licensed thermal power (MWt): 3430
4. Nameplate rating (Gross MWe): 1217
5. Design elect rating (Net MWe): 1150
6. Max dependable cap (Gross MWe): 1140
7. Max dependable cap (Net MWe): 1089
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net):. N/A
10. Reasons for restrictions, if any:_ N/A THIS MONTH YEAR TO CUMULATIVE DATE
11. Hours in reporting period 745 7,296 138,254
12. Hours reactor was critical 745.0 6,150 106.432
13. Reactor reserve shutdown hours 0 0 0
14. Hours generator on-line 745.0 6,016 102,545
15. Unit reserve shutdown hours 0 0
16. Gross thermal energy gen (MWH) 2.540.064 20,082,144 325,655,051
17. Gross elect energy gen (MWH) 864,112 6.779,763 107,680,598
18. Net elect energy gen (MVH) 829,640 6.488.628 102,984,373
19. Unit service factor 100.0% 82.5% 74.2%
20. Unit availability factor 100.0% 82.5% 74.2%
21. Unit cap factor (using MDC Net) 102.3% 81.7% 81.9% (1)
22. Unit cap factor (using DER Net) 96.8% 77.3% 76.8% (1)
23. Unit forced outage rate 0.0% 4.3% 15.1%
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

AVERAGE DAILY UNIT POWER LEVEL DOCKETNO. 50-341 UNIT Fermi 2 DATE November 6, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-51x48 Month October 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net) (MWe-Net) 1 1125 17 1135 2 1132 18 1126 3 1125 19 1129 4 1128 20 1119 5 1129 21 1120 6 1129 22 1130 7 1128 23 1133 8 1116 24 1132 9 1122 25 1129 10 1123 26 1131 11 1096 27 1130 12 1026 28 1130 13 1032 29 1131 14 1100 30 1123 15 1128 31 1118 16 1129

UNIT' SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-34 1 COMPLETED BY: Kevin Burke UNIT NAME: Fermi 2 TELEPHONE: (734) 586-5148 DATE: November 6, 2003 REPORT MONTH October 2003 No. (6) Date TYPE Dur (Hrs) (7) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective Action to (1) shutting down No. Code (5) Prevent Recurrence reactor or reducing power (3)

None (1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data entry sheets S: Scheduled A - Equipment Failure (Explain) 1- Manual for Licensee Event Report (LER) file (NUREG-B - Maintenance or Test 2 - Manual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as (4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.

Examination 9 - Other (7) Duration of reductions reported as zero per F - Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

H - Other (Explain)