NRC-03-0081, September 2003 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
September 2003 Monthly Operating Report for Fermi 2
ML032880550
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 10/08/2003
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-0081
Download: ML032880550 (4)


Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison I

Reg. Guide 1.16 October 8, 2003 NRC-03-0081 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for September 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for September 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

H. K. Chernoff J. E. Dyer M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region I 1~L0 A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY Kevin Burke DATE October 8. 2003 TELEPHONE (734) 586-5148 OPERATING STATUS

1. Unit name: Fermi 2
2. Reporting period: September 2003
3. Licensed thermal power (MWt): 3430
4. Nameplate rating (Gross MWe): 1217
5. Design elect rating (Net MWe): 1150
6. Max dependable cap (Gross MWe): 1140
7. Max dependable cap (Net MWe): 1089
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net):. N/A
10. Reasons for restrictions, if any: N/A THIS MONTH YEAR TO CUMULATIVE DATE
11. Hours in reporting period 720 137.509
12. Hours reactor was critical 624.7 105.687
13. Reactor reserve shutdown hours 0 0
14. Hours generator on-line 602.0 5,271 101.800
15. Unit reserve shutdown hours 0 0
16. Gross thermal energy gen (MWH) 1.984.344 17.542,080 323,114,987
17. Gross elect energy gen (MWH) 665.256 5.915.651 106.816.486
18. Net elect energy gen (MWH) 636,682 5,658,987 102,154.733
19. Unit service factor 83.6% 80.5% 74.0%
20. Unit availability factor 83.6% 80.5% 74.0%
21. Unit cap factor (using MDC Net) 81.2% 79.3% 81.8% (1)
22. Unit cap factor (using DER Net) 76.9% 75.1% 76.6% (1)
23. Unit forced outage rate 16.4% 4.9% 15.2%
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT Fermi DATE Octobe r R. 2003 COMPLETED BY Kevin ] Burke TELEPHONE (734) 5 86-5148 Month September 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net) (MWe-Net) 1 1115 16 1114 2 1113 17 1109 3 1110 18 1108 4 1110 19 1112 5 105 20 1122 6 0 21 1120 7 0 22 1109 8 0 23 1120 9 0 24 1118 10 149 25 1124 11 786 26 1125 12 1068 27 1124 13 1108 28 1128 14 1103 29 1131 15 1112 30 1116

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-341 COMPLETED BY: Kevin Burke UNIT NAME: Fermi 2 TELEPHONE: (734) 586-5148 DATE: October 8. 2003 REPORT MONTH September 2003 No. (6) Date TYPE Dur (Hrs) (7) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective Action to (1) shutting down No. Code (5) Prevent Recurrence reactor or reducing power (3)

S03-04 09/05/03 F 118.0 A 2 N/A CE V Planned reactor shutdown to repair pressure seal leak on Reactor Water Cleanup System return check valve G3300F120 (1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data entry sheets S: Scheduled A - Equipment Failure (Explain) I - Manual for Licensee Event Report (LER) file (NUREG-B - Maintenance or Test 2 - Manual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as (4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.

Examination 9 - Other (7) Duration of reductions reported as zero per F - Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

H - Other (Explain)