$A Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Reg. Guide 1.16 August 12, 2003 NRC-03-0066 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for July 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for July 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

H. K. Chemoff J. E. Dyer M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III 4

A M)TE Energy Company

A OPERATING DATA REPORT DOCKET NO. 50-341 DATE August 12,2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS 1.

2.

3.

4.

5.

6.

7.

Unit name: Fermi 2 Reporting period: July 2003 Licensed thermal power (MWt): 3430 Nameplate rating (Gross MWe): 1217 Design elect rating (Net MWe): 1150 Max dependable cap (Gross MWe): 1140 Max dependable cap (Net MWe): 1089

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9.

Power level to which restricted, if any (MWe Net):

N/A

10.

Reasons for restrictions, if any:

N/A THIS MONTH 11.

12.

13.

14.

15.

16.

17.

18.

19.

20.

21.

22.

23.

Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)

Gross elect energy gen (MWH)

Net elect energy gen (MWH)

Unit service factor Unit availability factor Unit cap factor (using MDC Net)

Unit cap factor (using DER Net)

Unit forced outage rate 744 744.0 0

744.0 0

2,542,584 853,936 815,027 100.0%

100.0%

100.6%

95.3%

0.0%

YEAR TO DATE 5,087 4,138 0

4,055 0

13,513,224 4,569,790 4,372,813 79.7%

79.7%

78.9%

74.7%

0.6%

CUMULATIVE 136,045 104,420 0

100,583 0

319,086,131 105,470,625 100,868,559 73.9%

73.9%

81.8% (1) 76.6% (1) 15.2%

24.

Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A

25.

If shutdown at end of report period, estimated date of startup: N/A

26.

Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

4 AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE August 12, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month July 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net)

(MWe-Net) 1 1096 17 1092 2

1091 18 1100 3

1086 19 1102 4

1083 20 1093 5

1087 21 1092 6

1089 22 1098 7

1088 23 1099 8

1087 24 1097 9

1095 25 1093 10 1090 26 1090 11 1095 27 1086 12 1100 28 1101 13 1099 29 1102 14 1095 30 1099 15 1089 31 1094 16 1095

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

UNIT NAME:

DATE:

50-341 Fermi 2 August 12, 2003 COMPLETED BY:

TELEPHONE:

Kevin Burke (734) 586-5148 REPORT MONTH July 2003 No. (6)

Date TYPE Dur (Hrs) (7)

Reason (2)

Method of LER Sys Code (4)

Comp Cause and Corrective Action to (1) shutting down No.

Code (5)

Prevent Recurrence reactor or reducing power (3)

N/A (1)

F: Forced S: Scheduled (2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)

Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG-1022)

(5)

Same Source as (4)

(6)

R - Prefix indicates power reduction.

S - Prefix indicated plant shutdown.

(7)

Duration of reductions reported as zero per Regulatory Guide 1. 16, Revision 4.