NRC-03-0055, May 2003 Monthly Operating Report for Fermi 2
| ML031681380 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 06/10/2003 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-0055, RG-1.016 | |
| Download: ML031681380 (4) | |
Text
Fermi 2 6400 North Dixe Hwy., Newport, MI 48166 Detroit Edison Reg. Guide 1.16 June 10, 2003 NRC-03-0055 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for May 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional infornation, please contact me at (734) 586-4258.
Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.
J. E. Dyer M. A. Ring J. F. Stang, Jr.
M. V. Yudasz, Jr.
NRC Resident Office Region III A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 DATE June 10, 2003 COMPLETED BY Ron Stiemsma TELEPHONE (734) 586-1656 OPERATING STATUS
- 1. Unit name: Fermi 2
- 2.
Reporting period: May 2003
- 3.
Licensed thermal power (MWt): 3430
- 4.
Nameplate rating (Gross MWe): 1217
- 5. Design elect rating (Net MWe): 1150
- 6.
Max dependable cap (Gross MWe): 1140
- 7.
Max dependable cap (Net MWe): 1089
- 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A
- 9.
Power level to which restricted, if any (MWe Net):
- 10.
Reasons for restrictions, if any:
N/A N/A TIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)
Gross elect energy gen (MWH)
Net elect energy gen (MWH)
Unit service factor Unit availability factor Unit cap factor (using MDC Net)
Unit cap factor (using DER Net)
Unit forced outage rate 744 587.5 0
524.2 0
1,616,376 538,481 515,064 70.5%
70.5%
63.6%
60.2%
0.0%
YEAR TO DATE 3,623 2,674 0
2,591 0
8,503,752 2,885,068 2,763,602 71.5%
71.5%
70.0%
66.3%
1.0%
CUMULATIVE 134,581 102,956 0
99119 0
314,076,659 103,785,903 99,259,347 73.7%
73.7%
81.5% (1) 76.4% (1) 15.4%
- 24.
Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
- 25. If shutdown at end of report period, estimated date of startup: N/A
- 26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT
- Fermi, DATE June 1(
COMPLETED BY Ron St TELEPHONE (734) 5 2
), 2003 iemsma 586-1656 Month May 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net)
(MWe-Net) 1 0
17 1068 2
0 18 1115 3
0 19 1010 4
0 20 1059 5
0 21 1128 6
0 22 1125 7
0 23 1124 8
0 24 1128 9
0 25 1114 10 94 26 1138 11 290 27 1131 12 622 28 1178 13 662 29 1025 14 1115 30 1207 15 1069 31 930 16 1164
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
UNIT NAME:
DATE:
50-341 Fermi 2 June 10, 2003 COMPLETED BY:
TELEPHONE:
Ron Stiemsma (734) 586-1656 REPORT MONTH May 2003 No. (6)
Date TYPE Dur (Hrs) (7)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code (5)
Prevent Recurrence reactor or reducing power (3)
R03-02 05/31/03 F
0 A
9 N/A TA PCV Repair of No. 2 High Pressure Control Valve (HPCV) which required the valve to be locked down and a power reduction to less than 93 percent.
(2)
REASON:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
METHOD:
I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)
Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG-1022)
(5)
Same Source as (4)
(6)
R - Prefix indicates power reduction.
S - Prefix indicated plant shutdown.
(7)
Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.
(1)
F: Forced S: Scheduled