NRC-03-0044, April 2003 Monthly Operating Report for Fermi 2
| ML031330271 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 05/07/2003 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-0044 | |
| Download: ML031330271 (4) | |
Text
Fermi 2 6400 North DLie Hwy., Newport, Ml 48166 Detroit Edison Reg. Guide 1.16 May 7, 2003 NRC-03-0044 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for April 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for April 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.
J. E. Dyer M. A. Ring J. F. Stang, Jr.
M. V. Yudasz, Jr.
NRC Resident Office Region III
/'2i J/
A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 DATE May 9, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS
- 1.
Unit name: Fermi 2
- 2.
Reporting period: April 2003
- 3.
Licensed thermal power (MWt): 3430
- 4.
Nameplate rating (Gross MWe): 1217
- 5.
Design elect rating (Net MWe): 1150
- 6.
Max dependable cap (Gross MWe): 1140
- 7.
Max dependable cap (Net MWe): 1089
- 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A
- 9.
Power level to which restricted, if any (MWe Net):
- 10.
Reasons for restrictions, if any:
N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)
Gross elect energy gen (MWH)
Net elect energy gen (MWH)
Unit service factor Unit availability factor Unit cap factor (using MDC Net)
Unit cap factor (using DER Net)
Unit forced outage rate 719 0.0 0
0.0 0
0 0
0 0.0%
0.0%
0.0%
0.0%
0.0%
YEAR TO DATE 2,879 2,087 0
2,067 0
6,887,376 2,346,587 2,248,538 71.8%
71.8%
71.7%
67.9%
1.2%
CUMULATIVE 133,837 102,369 0
98,595 0
312,460,283 103,247,422 98,744,283 73.7%
73.7%
81.7% (1) 76.5% (1) 15.4%
Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A If shutdown at end of report period, estimated date of startup: 05/08/2003 Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.
23.
24.
25.
26.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT Fermi' DATE May 9, COMPLETED BY Kevin TELEPHONE (734) 5 2
2003 Burke 586-5148 Month April 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net)
(MWe-Net) 1 0
16 0
2 0
1 7 0
3 0
18 0
4 0
19 0
5 0
20 0
6 0
21 0
7 0
22 0
8 0
23 0
9 0
24 0
10 0
25 0
11 0
26 0
12 0
27 0
13 0
28 0
14 0
29 0
15 0
30 0
I I.
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
UNIT NAME:
DATE:
50-34 1 Fermi 2 May 9, 2003 COMPLETED BY:
TELEPHONE:
Kevin Burke (734) 586-5148 REPORT MONTH April 2003 (2)
REASON:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)
Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG-1022)
(5)
Same Source as (4)
(6)
R - Prefix indicates power reduction.
S - Prefix indicated plant shutdown.
(7)
Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.
No. (6)
Date TYPE Dur (Hrs) (7)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code (5)
Prevent Recurrence reactor or reducing power (3)
S03-02 04/01/03 S
719 C
4 N/A Continued Shutdown for Refuel Outage 9
.J.
I ______
L L ________
A A
J
.A. _______
(1)
F: Forced S: Scheduled