NRC-03-0024, February 2003 Monthly Operating Report for Fermi 2
| ML030770458 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 03/11/2003 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-0024, RG-1.016 | |
| Download: ML030770458 (4) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Reg. Guide 1.16 March 11, 2003 NRC-03-0024 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for February 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.
J. E. Dyer M. A. Ring J. F. Stang, Jr.
M. V. Yudasz, Jr.
NRC Resident Office Region III
1J1Z2(
A DTE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 DATE March 11, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS Unit name: Fermi 2 Reporting period: February 2003 Licensed thermal power (MWt): 3430 Nameplate rating (Gross MWe): 1217 Design elect rating (Net MWe): 1150 Max dependable cap (Gross MWe): 1140 Max dependable cap (Net MWe): 1089
- 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A
- 9.
Power level to which restricted, if any (MWe Net):
- 10.
Reasons for restrictions, if any:
N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)
Gross elect energy gen (MWH)
Net elect energy gen (MWH)
Unit service factor Unit availability factor Unit cap factor (using MDC Net)
Unit cap factor (using DER Net)
Unit forced outage rate 672 672.0 0
672.0 0
2,257,872 771,595 739,490 100.0%
100.0%
101.0%
95.7%
0.0%
YEAR TO DATE 1,416 1,411 0
1,391 0
4,681,680 1,597,887 1,532,221 98.2%
98.2%
99.4%
94.1%
1.8%
CUMULATIVE 132,374 101,693 0
97,919 0
310,254,587 102,498,722 98,027,967 74.0%
74.0%
82.2%(1) 76.9%(1) 15.5%
- 24.
Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refueling Outage 9, 03/28/2003, 30 days
- 25.
If shutdown at end of report period, estimated date of startup: N/A
- 26.
Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT Fermi 2 DATE March 11, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month February 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net)
(MWe-Net) 1 1124 15 976 2
1116 16 1127 3
1125 17 1127 4
1124 18 1127 5
1129 19 1122 6
1128 20 898 7
1129 21 1125 8
1128 22 1121 9
1128 23 980 10 1128 24 1112 11 1113 25 1127 12 1031 26 1127 13 1128 27 1127 14 1128 28 1127
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
UNIT NAME:
DATE:
50-341 Fermi 2 March 11, 2003 COMPLETED BY:
TELEPHONE:
Kevin Burke (734) 586-5148 REPORT MONTH February 2003 No. (6)
Date TYPE Dur (Hrs) (7)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code (5)
Prevent Recurrence reactor or reducing power (3)
N/A (2)
REASON:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
METHOD:
I -Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)
Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)
(5)
Same Source as (4)
(6)
R - Prefix indicates power reduction.
S - Prefix indicated plant shutdown.
(7)
Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.
(1)
F: Forced S: Scheduled