NRC-03-0015, January 2003 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
January 2003 Monthly Operating Report for Fermi 2
ML030520048
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 02/11/2003
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-03-0015, RG-1.016
Download: ML030520048 (4)


Text

Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison Reg. Guide 1.16 February 11, 2003 NRC-03-0015 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for January 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

J. E. Dyer M. A. Ring J. F. Stang, Jr.

M. V. Yudasz, Jr.

NRC Resident Office Region III

\aI A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY Kevin Burke DATE February 11, 2003 TELEPHONE (734) 586-5148 OPERATING STATUS

1. Unit name: Fermi 2
2. Reporting period: January 2003
3. Licensed thermal power (MWt): 3430
4. Nameplate rating (Gross MWe): 1217
5. Design elect rating (Net MWe): 1150
6. Max dependable cap (Gross MWe): 1140
7. Max dependable cap (Net MWe): 1089
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net): N/A
10. Reasons for restrictions, if any: N/A THIS MONTH YEAR TO CUMULATIVE DATE
11. Hours in reporting period 744 744 131,702
12. Hours reactor was critical 738.6 739 101,021
13. Reactor reserve shutdown hours 0 0 0
14. Hours generator on-line 718.6 719 97,247
15. Unit reserve shutdown hours 0 0 0
16. Gross thermal energy gen (MWH) 2,423,808 2,423,808 307,996,715
17. Gross elect energy gen (MWH) 826,292 826,292 101,727,127
18. Net elect energy gen (MWH) 792,732 792,732 97,288,477
19. Unit service factor 96.6% 96.6% 73.8%
20. Unit availability factor 96.6% 96.6% 73.8%
21. Unit cap factor (using MDC Net) 97.8% 97.8% 82.0% (1)
22. Unit cap factor (using DER Net) 92.7% 92.7% 76.8%(1)
23. Unit forced outage rate 3.4% 3.4% 15.6%
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refueling Outage 9, 03/28/2003, 30 days
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT Fermi 2 DATE February 11, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month January 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net) (MWe-Net) 1 0 17 1130 2 383 18 1130 3 1087 19 1130 4 1129 20 1130 5 1131 21 1130 6 1131 22 1130 7 1130 23 1130 8 1127 24 1129 9 1127 25 1129 10 1130 26 1129 11 1131 27 1128 12 1128 28 1128 13 1130 29 1119 14 1134 30 1121 15 1131 31 1127 16 1130

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-341 COMPLETED BY: Kevin Burke Fermi 2 TELEPHONE: (734) 586-5148 UNIT NAME:

DATE: February 11, 2003 REPORT MONTH January 2003 No. (6) Date TYPE Dur (Hrs) (7) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective Action to (1) shutting down No. Code (5) Prevent Recurrence reactor or reducing power (3)

S03-01 01/01/03 F 25.4 A 4 02-006 EE RG Continuation of forced outage due to instrument power supply Modular Power Unit 3 voltage regulator failure (1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data entry sheets A - Equipment Failure (Explain) 1 - Manual for Licensee Event Report (LER) file (NUREG S: Scheduled B - Maintenance or Test 2 - Manual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as (4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.

Examination 9 - Other (7) Duration of reductions reported as zero per F - Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

H - Other (Explain)