NRC-03-0015, January 2003 Monthly Operating Report for Fermi 2
| ML030520048 | |
| Person / Time | |
|---|---|
| Site: | Fermi |
| Issue date: | 02/11/2003 |
| From: | Peterson N Detroit Edison |
| To: | Document Control Desk, Office of Nuclear Reactor Regulation |
| References | |
| NRC-03-0015, RG-1.016 | |
| Download: ML030520048 (4) | |
Text
Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison Reg. Guide 1.16 February 11, 2003 NRC-03-0015 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Subject:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43 Monthly Operating Status Report for January 2003 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for January 2003. This report includes the Operating Data Report, Average Daily Unit Power Level Data, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.
J. E. Dyer M. A. Ring J. F. Stang, Jr.
M. V. Yudasz, Jr.
NRC Resident Office Region III A DTE Energy Company
\\aI
OPERATING DATA REPORT DOCKET NO. 50-341 DATE February 11, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS Unit name: Fermi 2 Reporting period: January 2003 Licensed thermal power (MWt): 3430 Nameplate rating (Gross MWe): 1217 Design elect rating (Net MWe): 1150 Max dependable cap (Gross MWe): 1140 Max dependable cap (Net MWe): 1089
- 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A
- 9.
Power level to which restricted, if any (MWe Net):
- 10.
Reasons for restrictions, if any:
N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)
Gross elect energy gen (MWH)
Net elect energy gen (MWH)
Unit service factor Unit availability factor Unit cap factor (using MDC Net)
Unit cap factor (using DER Net)
Unit forced outage rate 744 738.6 0
718.6 0
2,423,808 826,292 792,732 96.6%
96.6%
97.8%
92.7%
3.4%
YEAR TO DATE 744 739 0
719 0
2,423,808 826,292 792,732 96.6%
96.6%
97.8%
92.7%
3.4%
CUMULATIVE 131,702 101,021 0
97,247 0
307,996,715 101,727,127 97,288,477 73.8%
73.8%
82.0% (1) 76.8%(1) 15.6%
- 24.
Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refueling Outage 9, 03/28/2003, 30 days
- 25.
If shutdown at end of report period, estimated date of startup: N/A
- 26.
Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
- 1.
- 2.
- 3.
- 4.
- 5.
- 6.
7.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT Fermi 2 DATE February 11, 2003 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month January 2003 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net)
(MWe-Net) 1 0
17 1130 2
383 18 1130 3
1087 19 1130 4
1129 20 1130 5
1131 21 1130 6
1131 22 1130 7
1130 23 1130 8
1127 24 1129 9
1127 25 1129 10 1130 26 1129 11 1131 27 1128 12 1128 28 1128 13 1130 29 1119 14 1134 30 1121 15 1131 31 1127 16 1130
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
UNIT NAME:
DATE:
50-341 Fermi 2 February 11, 2003 COMPLETED BY:
TELEPHONE:
Kevin Burke (734) 586-5148 REPORT MONTH January 2003 No. (6)
Date TYPE Dur (Hrs) (7)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code (5)
Prevent Recurrence reactor or reducing power (3)
S03-01 01/01/03 F
25.4 A
4 02-006 EE RG Continuation of forced outage due to instrument power supply Modular Power Unit 3 voltage regulator failure (2)
REASON:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)
Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)
(5)
Same Source as (4)
(6)
R - Prefix indicates power reduction.
S - Prefix indicated plant shutdown.
(7)
Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.
(1)
F: Forced S: Scheduled