NRC-02-0088, November 2002 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
November 2002 Monthly Operating Report for Fermi 2
ML023520499
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 12/11/2002
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-0088, RG-1.016
Download: ML023520499 (4)


Text

Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison Reg. Guide 1.16 December 11, 2002 NRC-02-0088 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for November 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for November 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

J. E. Dyer M. A. Ring J. F. Stang M. V. Yudasz, Jr.

NRC Resident Office Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 COMPLETED BY Ron Stiemsma DATE December 11, 2002 TELEPHONE (734) 586-1656 OPERATING STATUS

1. Unit name: Fermi 2
2. Reporting period: November 2002
3. Licensed thermal power (MWt): 3430
4. Nameplate rating (Gross MWe): 1217
5. .Design elect rating (Net MWe): 1150
6. Max dependable cap (Gross MWe): 1140
7. Max dependable cap (Net MWe): 1089
8. If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9. Power level to which restricted, if any (MWe Net) N/A
10. Reasons for restrictions, if any: N/A THIS MONTH YEAR TO CUMULATIVE DATE
11. Hours in reporting period 720 8,016 130,214
12. Hours reactor was critical 720.0 7,974 99,610
13. Reactor reserve shutdown hours 0 0 0
14. Hours generator on-line 720.0 7,958 95,856
15. Unit reserve shutdown hours 0 0 0
16. Gross thermal energy gen (MWH) 2,467,872 26,567,880 303,338,291
17. Gross elect energy gen (MWH) 843,421 8,944,323 100,137,720
18. Net elect energy gen (MWH) 809,899 8,570,404 95,761,824
19. Unit service factor 100.0% 99.3% 73.6%
20. Unit availability factor 100.0% 99.3% 73.6%
21. Unit cap factor (using MDC Net) 103.3% 98.2% 75.7%(1)
22. Unit cap factor (using DER Net) 97.8% 93.0% 70.9% (1)
23. Unit forced outage rate 0.0% 0.7% 15.7%
24. Shutdowns scheduled over next 6 months (Type, Date, Duration of each): Refueling Outage 9, 03/28/2003, 30 days
25. If shutdown at end of report period, estimated date of startup: N/A
26. Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO. 50-341 UNIT Fermi 2 DATE December 11, 2002 COMPLETED BY Ron Stiemsma TELEPHONE (734) 586-1656 Month November 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (Mwe-Net) (MWe-Net) 1 1130 16 1130 2 1130 17 1130 3 1130 18 1131 4 1130 19 1126 5 1129 20 1126 6 1130 21 1127 7 1130 22 1129 8 1121 23 1130 9 1121 24 1129 10 1117 25 1129 11 1123 26 1131 12 1131 27 1131 13 1130 28 1130 14 1124 29 1127 15 1131 30 1129

I UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO: 50-341 COMPLETED BY: Ron Stiemsma UNIT NAME: Fermi 2 TELEPHONE: (734) 586-1656 DATE: December 11, 2002 REPORT MONTH November 2002 No. (6) Date TYPE Dur (Hrs) (7) Reason (2) Method of LER Sys Code (4) Comp Cause and Corrective Action to (1) shutting down No. Code (5) Prevent Recurrence reactor or reducing power (3)

N/A

______ L__________L________ L J .a.

(1) F: Forced (2) REASON: (3) METHOD: (4) Instructions for preparation of data entry sheets S: Scheduled A - Equipment Failure (Explain) I - Manual for Licensee Event Report (LER) file (NUREG B - Maintenance or Test 2 - Manual Scram 1022)

C - Refueling 3 - Automatic Scram (5) Same Source as (4)

D - Regulatory Restriction 4 - Continued (6) R - Prefix indicates power reduction.

E - Operations Training and License 5 - Reduced Load S - Prefix indicated plant shutdown.

Examination 9 - Other (7) Duration of reductions reported as zero per F - Administrative Regulatory Guide 1.16, Revision 4.

G - Operational Error (Explain)

H - Other (Explain)