Text

Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Reg. Guide 1.16 October 10, 2002 NRC-02-0076 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for September 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for September 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

J. E. Dyer T. J. Kim M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 DATE October 10, 2002 COMPLETED BY Ron Stiemsma TELEPHONE (734) 586-1656 OPERATING STATUS

1.

Unit name: Fermi 2

2.

Reporting period: September 2002

3.

Licensed thermal power (MWt): 3430

4.

Nameplate rating (Gross MWe): 1217

5.

Design elect rating (Net MWe): 1150

6.

Max dependable cap (Gross MWe): 1140

7.

Max dependable cap (Net MWe): 1089

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9.

Power level to which restricted, if any (MWe Net):,

10. Reasons for restrictions, if any:

N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)

Gross elect energy gen (MWH)

Net elect energy gen (MWH)

Unit service factor Unit availability factor Unit cap factor (using MDC Net)

Unit cap factor (using DER Net)

Unit forced outage rate 720 720 0

720 0

2,399,304 796,696 761,918 100.0%

100.0%

97.2%

92.0%

0.0%

YEAR TO DATE 6,551 6551 0

6,551 0

21,792,552 7,318,283 7,009,465 100.0%

100.0%

98.3%

93.0%

0.0%

24.

Shutdowns scheduled over next 6 months (Type, Date, Duration of each):

03/28/2003, 30 days

25. If shutdown at end of report period, estimated date of startup: N/A
26.

Units in test status (prior to commercial operation): N/A CUMULATIVE 128,749 0

0 298,562,963 98,180 94,200,885 73.4%

73.4%

75.4% (1) 70.7% (1) 15.9%

Refueling Outage 9, Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE October 10, 2002 COMPLETED BY Ron Stiemsma TELEPHONE (734) 586-1656 Month September 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1097 16 1096 2

1092 17 1107 3

1090 18 1100 4

1102 19 1092 5

1095 20 1092 6

1102 21 1029 7

1094 22 1068 8

1092 23 1021 9

1091 24 1023 10 1090 25 1021 11 1107 26 1015 12 1109 27 1099 13 1105 28 1101 14 836 29 1102 15 722 30 1102

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

UNIT NAME:

DATE:

50-341 Fermi 2 October 10, 2002 COMPLETED BY:

TELEPHONE:

Ron Stiemsma (734) 586-1656 REPORT MONTH September 2002 (2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)

Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)

(5)

Same Source as (4)

(6)

R - Prefix indicates power reduction.

S - Prefix indicated plant shutdown.

(7) Duration of reductions reported as zero per Regulatory Guide 1. 16, Revision 4.

Cause and Corrective Action to Prevent Recurrence Lowered reactor power to 65%

for control rod pattern adjustment, control rod scram time testing and turbine stop, control, and bypass valve surveillances.

(1)