August 2002 Monthly Operating Report for Fermi 2
ML022600503
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 09/06/2002
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-0070, RG-1.016
Download: ML022600503 (4)


Text

Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison Reg. Guide 1.16 September 6, 2002 NRC-02-0070 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for August 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for August 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: R. J. Aben, Jr.

J. E. Dyer T. J. Kim M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III A DTE Energy Company I

OPERATING DATA REPORT DOCKET NO. 50-341 DATE September 6, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS

1.

Unit name: Fermi 2

2.

Reporting period: August 2002

3.

Licensed thermal power (MWt): 3430

4.

Nameplate rating (Gross MWe): 1217

5.

Design elect rating (Net MWe): 1150

6.

Max dependable cap (Gross MWe): 1140

7.

Max dependable cap (Net MWe): 1089

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9.

Power level to which restricted, if any (MWe N

10.

Reasons for restrictions, if any:

et):

N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)

Gross elect energy gen (MWH)

Net elect energy gen (MWH)

Unit service factor Unit availability factor Unit cap factor (using MDC Net)

Unit cap factor (using DER Net)

Unit forced outage rate 744 744 0

744 0

2,537,832 850,859 812,724 100.0%

100.0%

100.3%

95.0%

0.0%

YEAR TO DATE 5,831 0

0 19,393,248 6,521,587 6,247,547 100.0%

100.0%

98.4%

93.2%

0.0%

CUMULATIVE 128,029 97,467 0

93,729 0

296,163,659 97,714,984 93,438,967 73.2%

73.2%

75.3% (1) 70.5% (1) 16.0%

24.

Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A

25.

If shutdown at end of report period, estimated date of startup: N/A

26.

Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE September 6, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month August 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1079 17 1089 2

1083 18 1099 3

1091 19 1102 4

1083 20 1106 5

1086 21 1100 6

1101 22 1091 7

1077 23 1096 8

1109 24 1099 9

1106 25 1092 10 1100 26 1100 11 1093 27 1099 12 1089 28 1101 13 1089 29 1102 14 1092 30 1102 15 1094 31 1098 16 1088

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

UNIT NAME:

DATE:

50-341 Fermi 2 September 6, 2002 COMPLETED BY:

TELEPHONE:

Kevin Burke (734) 586-5148 REPORT MONTH August 2002 (2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)

Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)

(5)

Same Source as (4)

(6)

R - Prefix indicates power reduction.

S - Prefix indicated plant shutdown.

(7)

Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.

(1)

F: Forced S: Scheduled