Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison Reg. Guide 1.16 June 10, 2002 NRC-02-0051 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for May 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for May 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: J. E. Dyer T. J. Kim M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III A DTE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 DATE June 10, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS

1.

Unit name: Fermi 2

2.

Reporting period: May 2002

3.

Licensed thermal power (MWt): 3430

4.

Nameplate rating (Gross MWe): 1217

5.

Design elect rating (Net MWe): 1150

6.

Max dependable cap (Gross MWe): 1140

7.

Max dependable cap (Net MWe): 1089

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9.

Power level to which restricted, if any (MWe N,

10.

Reasons for restrictions, if any:

el):

N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)

Gross elect energy gen (MWH)

Net elect energy gen (MWH)

Unit service factor Unit availability factor Unit cap factor (using MDC Net)

Unit cap factor (using DER Net)

Unit forced outage rate 744 744 0

744 0

2,495,880 837,928 803,401 100.0%

100.0%

99.2%

93.9%

0.0%

YEAR TO DATE 3,623 3,623 0

3,623 11,852,856 4,006,888 3,843,177 100.0%

100.0%

97.4%

92.2%

0.0%

CUMULATIVE 125,821 0

91,521 0

288,623,267 95,200,285 91,034,597 72.7%

72.7%

74.8% (1) 70.1% (1) 16.3%

24.

Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A

25.

If shutdown at end of report period, estimated date of startup: N/A

26.

Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE June 10, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month May 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1020 17 1118 2

1017 18 1042 3

1097 19 1119 4

1120 20 670 5

1109 21 1031 6

1109 22 1114 7

1107 23 1104 8

1117 24 1106 9

1107 25 1114 10 1113 26 1115 11 1117 27 1109 12 1108 28 1111 13 1117 29 1106 14 1114 30 1098 15 1115 31 1090 16 1104

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

UNIT NAME:

DATE:

50-341 Fermi 2 June 10, 2002 COMPLETED BY:

TELEPHONE:

Kevin Burke (734) 586-5148 REPORT MONTH May 2002 No. (6)

Date TYPE Dur (Hrs) (7)

Reason (2)

Method of LER Sys Code (4)

Comp Cause and Corrective Action to (1) shutting down No.

Code (5)

Prevent Recurrence reactor or reducing power (3)

R02-05 05/20/02 F

0 A

9 N/A SJ P

North Reactor Feedwater Pump Turbine went to minimum speed following transfer of operating oil pumps.

(2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

METHOD:

1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)

Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)

(5)

Same Source as (4)

(6)

R - Prefix indicates power reduction.

S - Prefix indicated plant shutdown.

(7)

Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.

(1)

F: Forced S: Scheduled