Fermi 2 6400 North Dixie Hwy., Newport, M1 48166 Detroit Edison Reg. Guide 1.16 April 8, 2002 NRC-02-0030 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555
Reference:
Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43
Subject:
Monthly Operating Status Report for March 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for March 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.
Should you have any questions or require additional information, please contact me at (734) 586-4258.
Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: J. E. Dyer T. J. Kim M. A. Ring M. V. Yudasz, Jr.
NRC Resident Office Region III A I)TE Energy Company
OPERATING DATA REPORT DOCKET NO. 50-341 DATE April 8, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS
- 1.
Unit name: Fermi 2
- 2.
Reporting period: March 2002
- 3.
Licensed thermal power (MWt): 3430
- 4.
Nameplate rating (Gross MWe): 1217
- 5.
Design elect rating (Net MWe): 1150
- 6.
Max dependable cap (Gross MWe): 1140
- 7.
Max dependable cap (Net MWe): 1089
- 8.
If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:
N/A
- 9.
Power level to which restricted, if any (MWe Net):
N/A
- 10.
Reasons for restrictions, if any:
N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)
Gross elect energy gen (MWH)
Net elect energy gen (MWH)
Unit service factor Unit availability factor Unit cap factor (using MDC Net)
Unit cap factor (using DER Net)
Unit forced outage rate 744 744 0
744 0
2,427,096 821,390 787,509 100.0%
100.0%
97.2%
92.0%
0.0%
YEAR TO DATE 0
0 7,044,408 2,387,820 2,289,978 100.0%
100.0%
97.4%
92.2%
0.0%
CUMULATIVE 124,358 93,796 0
283,814,819 93,581,217 89,481,398 72.4%
72.4%
74.5% (1) 69.8% (1) 16.5%
- 24.
Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A
- 25.
If shutdown at end of report period, estimated date of startup: N/A
- 26.
Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.
- 11.
- 12.
- 13.
- 14.
- 15.
- 16.
- 17.
- 18.
- 19.
- 20.
- 21.
- 22.
23.
AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.
50-341 UNIT Fenni 2 DATE April 8, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Month March 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)
(MWe-Net) 1 1125 17 1123 2
747 18 1122 3
835 19 1122 4
1124 20 1124 5
1123 21 1124 6
1120 22 1125 7
1122 23 1123 8
1114 24 1125 9
981 25 1125 10 1123 26 1125 11 1124 27 1117 12 1123 28 1124 13 1118 29 1122 14 1115 30 585 15 1113 31 559 16 1123
UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:
UNIT NAME:
DATE:
50-341 Fermi 2 April 8, 2002 COMPLETED BY:
TELEPHONE:
Kevin Burke (734) 586-5148 REPORT MONTH March 2002 No. (6)
Date TYPE Dur (Hrs) (7)
Reason (2)
Method of LER Sys Code (4)
Comp Cause and Corrective Action to (1) shutting down No.
Code (5)
Prevent Recurrence reactor or reducing power (3)
R02-03 03/02/02 S
0 B
9 N/A SJ P
Reactor power decrease to 65% for surveillance testing and scheduled maintenance on South Reactor Feedwater Pump.
R02-04 03/30/02 F
0 A
9 N/A AD MG Reactor Recirculation Motor Generator set tripped due to field ground at exciter brush gear.
(2)
REASON:
A - Equipment Failure (Explain)
B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)
H - Other (Explain)
(3)
METHOD:
1 - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)
Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)
(5)
Same Source as (4)
(6)
R - Prefix indicates power reduction.
S - Prefix indicated plant shutdown.
(7)
Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.
(1)
F: Forced S: Scheduled