NRC-02-0024, February 2002 Monthly Operating Report for Fermi 2

From kanterella
Jump to navigation Jump to search
February 2002 Monthly Operating Report for Fermi 2
ML020810414
Person / Time
Site: Fermi DTE Energy icon.png
Issue date: 03/12/2002
From: Peterson N
Detroit Edison
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NRC-02-0024, RG-1.016
Download: ML020810414 (4)


Text

i Fermi 2 6400 North Dixie Hwy., Newport, MI 48166 Detroit Edison Reg. Guide 1.16 March 12, 2002 NRC-02-0024 U. S. Nuclear Regulatory Commission Attention: Document Control Desk Washington D C 20555

Reference:

Fermi 2 NRC Docket No. 50-341 NRC Operating License No. NPF-43

Subject:

Monthly Operating Status Report for February 2002 Enclosed for your information and use is the Fermi 2 Monthly Operating Status Report for February 2002. This report includes the Operating Data Report, Average Daily Unit Power Level, and the Summary of Unit Shutdowns and Power Reductions identified in NRC Regulatory Guide 1.16 and Fermi 2 Technical Specification 5.6.4.

Should you have any questions or require additional information, please contact me at (734) 586-4258.

Sincerely, Norman K. Peterson Manager - Nuclear Licensing Enclosures cc: J. E. Dyer T. J. Kim M. A. Ring M. V. Yudasz, Jr.

NRC Resident Office Region III A lYrE Energy Company

OPERATING DATA REPORT DOCKET NO. 50-341 DATE March 12,2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 OPERATING STATUS

1.

Unit name: Fermi 2

2.

Reporting period: February 2002

3.

Licensed thermal power (MWt): 3430

4.

Nameplate rating (Gross MWe): 1217

5.

Design elect rating (Net MWe): 1150

6.

Max dependable cap (Gross MWe): 1140

7.

Max dependable cap (Net MWe): 1089

8.

If changes occur in capacity ratings (Items number 3 through 7) since last report, give reasons:

N/A

9.

Power level to which restricted, if any (MWe

10.

Reasons for restrictions, if any:

Net):

N/A N/A THIS MONTH Hours in reporting period Hours reactor was critical Reactor reserve shutdown hours Hours generator on-line Unit reserve shutdown hours Gross thermal energy gen (MWH)

Gross elect energy gen (MWH)

Net elect energy gen (MWH)

Unit service factor Unit availability factor Unit cap factor (using MDC Net)

Unit cap factor (using DER Net)

Unit forced outage rate 672 672 0

672 0

2,282,952 779,030 747,823 100.0%

100.0%

102.2%

96.8%

0.0%

YEAR TO DATE 1.416 1.416 0

1.416 0

4,617,312 1,566,430 1,502,469 100.0%

100.0%

97.4%

92.3%

CUMULATIVE 123,614 93.052 0

89,314 281,387,723 92,759,827 88,693,889 72.3%

72.3%

74.3% (1) 69.6% (1) 16.6%

24.

Shutdowns scheduled over next 6 months (Type, Date, Duration of each): N/A

25.

If shutdown at end of report period, estimated date of startup: N/A

26.

Units in test status (prior to commercial operation): N/A Notes: (1) Calculated using weighted averages to reflect variations in rating (MDC and DER) from initial commercial operation.

11.
12.
13.
14.
15.
16.
17.
18.
19.
20.
21.
22.

23.

AVERAGE DAILY UNIT POWER LEVEL DOCKET NO.

50-341 UNIT Fermi 2 DATE March 12, 2002 COMPLETED BY Kevin Burke TELEPHONE (734) 586-5148 Montlk February 2002 DAY AVERAGE DAILY DAY AVERAGE DAILY POWER POWER LEVEL LEVEL (MWe-Net)

(MWe-Net) 1 1115 15 1123 2

1127 16 1123 3

1126 17 865 4

1127 18 1092 5

1127 19 1122 6

1125 20 1120 7

1125 21 1123 8

1125 22 1125 9

1125 23 1126 10 1122 24 1123 11 1126 25 1119 12 1123 26 1125 13 1127 27 1126 14 1126 28 1126

UNIT SHUTDOWNS AND POWER REDUCTIONS DOCKET NO:

UNIT NAME:

DATE:

50-341 Fermi 2 March 12,2002 COMPLETED BY:

TELEPHONE:

Kevin Burke (734) 586-5148 REPORT MONTH February 2002 No. (6)

Date TYPE Dur (Hrs) (7)

Reason (2)

Method of LER Sys Code (4)

Comp Cause and Corrective Action to (1) shutting down No.

Code (5)

Prevent Recurrence reactor or reducing power (3)

R02-02 02/17/02 F

18.4 A

5 N/A TA MO Derate to 65% power to replace failed motor in Unitized Actuator for Low Pressure Stop Valve #6.

(2)

REASON:

A - Equipment Failure (Explain)

B - Maintenance or Test C - Refueling D - Regulatory Restriction E - Operations Training and License Examination F - Administrative G - Operational Error (Explain)

H - Other (Explain)

(3)

METHOD:

I - Manual 2 - Manual Scram 3 - Automatic Scram 4 - Continued 5 - Reduced Load 9 - Other (4)

Instructions for preparation of data entry sheets for Licensee Event Report (LER) file (NUREG 1022)

(5)

Same Source as (4)

(6)

R - Prefix indicates power reduction.

S - Prefix indicated plant shutdown.

(7)

Duration of reductions reported as zero per Regulatory Guide 1.16, Revision 4.

(1)

F: Forced S: Scheduled