NOC-AE-19003667, Commitment Change Summary Report

From kanterella
Jump to navigation Jump to search
Commitment Change Summary Report
ML19184A050
Person / Time
Site: South Texas  STP Nuclear Operating Company icon.png
Issue date: 07/02/2019
From: Sterling L
South Texas
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NOC-AE-19003667, STI:34862462
Download: ML19184A050 (3)


Text

Nuclear Operating Company South Texas Project Electric Generating Station P.O. Box 289 Wadsivorth, Texas 77483 July 2, 2019 NOC-AE-19003667 10CFR 50.71 (e)(4)

D. S. Nuclear Regulatory Commission Attention: Document Control'Desk Washington, DC 20555-0001 South Texas Project Units 1 and 2 Docket Nos. STN 50-498, STN 50-499 Commitment Change Summary Report Attached is the South Texas Project (STP) Commitment Change Summary Report for the period June 21, 2017 through June 21, 2019. This report lists only changes to commitments made during the reporting period that require notification to the Nuclear Regulatory Commission in the periodic report.

The commitments were evaluated in accordance with the requirements of STP's Regulatory Commitment Change Process, which is consistent with the guidance in the Nuclear Energy Institute's NEI 99-04, "Guidelines for Managing NRC Commitment Changes." Additional documentation is available at STP for your review.

There are no new commitments in this letter.

If there are any questions, please contact Nic Boehmisch at 361-972-8172.

, J^ance R-Sterling _/

Manager, Regulatory Affairs

Attachment:

Commitment Change Summary nb STI:34862462

NOC-AE-19003667 Page 2 of 2 ec:

Regional Administrator, Region IV U.S. Nuclear Regulatory Commission 1600 E. Lamar Boulevard Arlington, TX 76011-4511 Glen 'Ed' Miller Senior Project Manager U.S. Nuclear Regulatory Commission One White Flint North (09E01) 11555RockvillePike Rockville, MD 20852

Attachment NOC-AE-19003667 Page 1 of 1 Commitment Change Summary Condition Source Document Source Date of Original Commitment Revised Commitment Justification for Change Report Date Change Description Description Number The wording changed to clarify that 12-11657-36 NOC-AE-14003189 11/25/2014 6/29/2017 Procedures and/or Ensure that one member the intent of the commitment is to training programs will of the minimum on-shift 17-15976-1 ensure that a member of the be revised to ensure staff who is not assigned minimum on-shift staff listed in the that Chemistry any other duties in the Emergency Plan (not including the Technicians retain the FLEX strategies is two on-shift Radiation Protection ability to perform on- qualified and available to Technicians) is available to perform site surveys. perform on-site surveys on-site surveys during a Beyond-during a Beyond-Design-Design-Basis event. This individual Basis Event.

does not necessarily need to be the Chemistry Technician, it just needs to be a member of the minimum on-shift staff who is not assigned other duties for implementing the FLEX strategies. Having one of the two on-shift Radiation Protection Technicians fill this role would result in them having an unanalyzed collateral duty. Following the commitment as currently written, a person without knowledge of the original intent of the commitment could inadvertently make a change that adversely affects the FLEX strategies.