ML023240262 | |
Person / Time | |
---|---|
Site: | South Texas |
Issue date: | 11/14/2002 |
From: | Sheppard J South Texas |
To: | Document Control Desk, Office of Nuclear Reactor Regulation |
References | |
NOC-AE-02001335, STI: 31452163 | |
Download: ML023240262 (14) | |
Similar Documents at South Texas | |
---|---|
Category:Letter type:NOC
MONTHYEARNOC-AE-240040, Nuclear Liability Certificates of Insurance2024-03-19019 March 2024
[Table view]Nuclear Liability Certificates of Insurance NOC-AE-230040, Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06)2023-12-14014 December 2023 Supplement to Proposed Alternate Frequency to Containment Unbonded Post-Tensioning System Inservice Inspection (Relief Request RR-ENG-4-06) NOC-AE-230039, Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/20230032023-12-12012 December 2023 Docket Nos. Stn 50-498, Stn 50-499 - Reply to a Notice of Violation, NRC Inspection Report 05000498/2023003 and 05000499/2023003 NOC-AE-230039, Submittal of Update Foreign Ownership, Control or Influence (FOCI)2023-07-11011 July 2023 Submittal of Update Foreign Ownership, Control or Influence (FOCI) NOC-AE-220039, Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 252023-02-0606 February 2023 Physical Security Plan, Training and Qualification Plan, Safeguards Contingency Plan, and Independent Spent Fuel Storage Installation Security Program Revision 25 NOC-AE-220038, Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask2022-06-23023 June 2022 Independent Spent Fuel Storage Installation Registration of Dry Spent Fuel Storage Cask NOC-AE-210038, Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 252022-01-0404 January 2022 Submittal of Operations Quality Assurance Plan Changes QA-089, QA-091, and Revision 25 NOC-AE-21003858, 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes2021-12-0606 December 2021 10 CFR 50.46 Thirty-Day Report of Significant ECCS Model Changes NOC-AE-21003853, Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-12-0303 December 2021 Revised Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003848, Unit 1 Cycle 24 Core Operating Limits Report2021-11-18018 November 2021 Unit 1 Cycle 24 Core Operating Limits Report NOC-AE-21003846, Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material2021-11-0404 November 2021 Response to End of Enforcement Discretion and Request for Approval of Alternate Disposal Procedures for Very Low-Level Radioactive Material NOC-AE-21003842, 10 CFR 50.59 Summary Report2021-09-23023 September 2021 10 CFR 50.59 Summary Report NOC-AE-21003841, Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25)2021-09-23023 September 2021 Request for Relief from ASME Section Xl Code Requirements for Weld Examinations (Relief Request RR-ENG-3-25) NOC-AE-21003832, Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-09-0909 September 2021 Supplement to License Amendment Request to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003812, Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections2021-08-10010 August 2021 Application to Revise Technical Specifications to Adopt TSTF-577, Revised Frequencies for Steam Generator Tube Inspections NOC-AE-21003825, Update of Foreign Ownership, Control, or Influence Information (FOCI)2021-08-0505 August 2021 Update of Foreign Ownership, Control, or Influence Information (FOCI) NOC-AE-21003824, Update Foreign Ownership, Control, or Influence (FOCI)2021-07-29029 July 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003823, Update Foreign Ownership Control or Influence (FOCI)2021-07-28028 July 2021 Update Foreign Ownership Control or Influence (FOCI) NOC-AE-21003820, Nuclear Insurance Protection2021-07-20020 July 2021 Nuclear Insurance Protection NOC-AE-21003819, Inservice Inspection Summary Report - 2RE212021-07-15015 July 2021 Inservice Inspection Summary Report - 2RE21 NOC-AE-21003816, Commitment Change Summary Report2021-06-30030 June 2021 Commitment Change Summary Report NOC-AE-21003814, Technical Specification Bases Control Program2021-06-24024 June 2021 Technical Specification Bases Control Program NOC-AE-21003810, Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- CPS Energy NOC-AE-21003811, Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy2021-06-17017 June 2021 Update Foreign Ownership, Control, or Influence (FOCI)- Nrg Energy NOC-AE-21003806, Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval2021-05-20020 May 2021 Inservice Inspection Program Plan and Inservice Testing Program Snubber Inservice Test Plan for the Fourth Ten-Year Interval NOC-AE-21003801, Annual Dose Report for 20202021-04-26026 April 2021 Annual Dose Report for 2020 NOC-AE-21003802, 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report2021-04-26026 April 2021 2020 South Texas Project Electric Generating Station Annual Environmental Operating Report NOC-AE-21003804, Operator Licensing Examination Schedule2021-04-21021 April 2021 Operator Licensing Examination Schedule NOC-AE-21003800, Radioactive Effluent Release Report2021-04-19019 April 2021 Radioactive Effluent Release Report NOC-AE-21003799, Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan2021-04-15015 April 2021 Changes to South Texas Project Electric Generating Station (STPEGS) Emergency Plan NOC-AE-21003795, Cycle 22 Core Operating Limits Report2021-04-15015 April 2021 Cycle 22 Core Operating Limits Report NOC-AE-21003796, Update Foreign Ownership, Control, or Influence (FOCI)2021-04-15015 April 2021 Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-21003790, Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter)2021-03-31031 March 2021 Response to Apparent Violations in NRC Inspection Report 05000498/2020401 and 05000499/2020401: (EA-20-122) (Letter) NOC-AE-21003791, Financial Assurance for Decommissioning - 2021 Update2021-03-31031 March 2021 Financial Assurance for Decommissioning - 2021 Update NOC-AE-210037, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-21003792, STP Fire Hazards Analysis Report, Amendment 26 (Redacted)2021-03-30030 March 2021 STP Fire Hazards Analysis Report, Amendment 26 (Redacted) NOC-AE-200037, License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications2021-03-11011 March 2021 License Amendment Request to Revise Technical Specification 3.6.3 to Append a Note and Remove the Index from Technical Specifications NOC-AE-21003784, Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing2021-03-0808 March 2021 Response to Request for Additional Information Regarding 1RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-21003786, Annual Fitness for Duty Performance Report for 20202021-03-0101 March 2021 Annual Fitness for Duty Performance Report for 2020 NOC-AE-21003785, Evidence of Financial Protection2021-02-23023 February 2021 Evidence of Financial Protection NOC-AE-21003781, Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts2021-01-27027 January 2021 Notice Regarding Withdrawal of Funds from Nuclear Decommissioning Trust Subaccounts NOC-AE-21003780, Submittal of Update Foreign Ownership, Control, or Influence (FOCI)2021-01-0707 January 2021 Submittal of Update Foreign Ownership, Control, or Influence (FOCI) NOC-AE-20003778, Changes to South Texas Project Electric Generating Station Emergency Plan2020-12-17017 December 2020 Changes to South Texas Project Electric Generating Station Emergency Plan NOC-AE-20003777, STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency2020-12-10010 December 2020 STPNOC Concerns Regarding the Proposed Change to the Evaluated Force-on-Force Inspection Guidance During the COVID-19 Public Health Emergency NOC-AE-20003766, Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan2020-12-0202 December 2020 Supplement to Change Implementation Date for License Amendment Request to Revise the STPEGS Emergency Plan NOC-AE-20003767, Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic2020-11-16016 November 2020 Request for a One-Time Exemption from 10 CFR 73, Appendix 8, Section VI, Subsection C.3.(1)(1) Regarding Annual Force-on-Force (FOF) Exercises, Due to Covid 19 Pandemic NOC-AE-20003765, Inservice Testing Program Description for the Fourth Ten-Year Interval2020-10-28028 October 2020 Inservice Testing Program Description for the Fourth Ten-Year Interval NOC-AE-20003764, 1 RE22 Inspection Summary Report for Steam Generator Tubing2020-10-0707 October 2020 1 RE22 Inspection Summary Report for Steam Generator Tubing NOC-AE-20003762, Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen2020-09-22022 September 2020 Supplement to License Amendment Request to Revise Technical Specifications to Adopt TSTF-374, Revision 0, Revision to TS 5.5.13 and Associated TS Bases for Diesel Fuel Oil Using the Consolidated Line Item Improvemen NOC-AE-20003761, Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic2020-09-10010 September 2020 Supplement to Exemption Request from 10 CFR 50 Appendix E Due to COVID-19 Pandemic 2024-03-19 Category:Updated Final Safety Analysis Report (UFSAR) MONTHYEARML24130A0652024-04-25025 April 2024
[Table view]Updated Final Safety Analysis Report, Revision 22, Chapter 12, Radiation Protection ML24130A0592024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 8, Electric Power ML24130A0722024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, List of Effective Pages ML24130A0632024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 5, Reactor Coolant System and Connected Systems ML24130A0552024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 10, Steam and Power Conversion System ML24130A0572024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 6, Engineered Safety Features ML24130A0702024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 14, Initial Test Program ML24130A0612024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 2, Site Characteristics ML24130A0672024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 9, Auxiliary Systems ML24130A0582024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 3, Design of Structures, Components, Equipment, and Systems ML24130A0602024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 4, Reactor ML24130A0712024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, Chapter 17, Quality Assurance ML24130A0762024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, Response to NRC Questions ML24130A0792024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 16, Technical Specifications ML24130A0662024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 11, Radioactive Waste Management ML24130A0782024-04-25025 April 2024 Units and 2 - Updated Safety Analysis Report, Revision 22, Chapter 19A, License Renewal ML24130A0822024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 15, Accident Analyses ML24130A0692024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 13, Conduct of Operations ML24130A0622024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 1, Introduction and General Description of Plant ML24130A0642024-04-25025 April 2024 Updated Final Safety Analysis Report, Revision 22, Chapter 7, Instrumentation and Controls ML22140A0692022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 14, Initial Test Program ML22140A0792022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 16, Technical Specifications ML22140A0812022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 8, Electric Power ML22140A0702022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 4, Reactor ML22140A0662022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 6, Engineered Safety Features (Redacted) ML22140A0712022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 11, Radioactive Waste Management ML22140A0772022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Introduction and General Description of Plant (Redacted) ML22140A0672022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 15, Accident Analyses (Redacted) ML22140A0612022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 9, Auxiliary Systems (Redacted) ML22140A0642022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 1, Responses to NRC Questions ML22140A0682022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 13, Conduct of Operations ML22140A0782022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 10, Steam and Power Conversion System ML22140A0582022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 2 of 4 (Redacted) ML22140A0592022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 7, Instrumentation and Controls ML22140A0742022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 1 of 4 ML22140A0562022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance ML22140A0762022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 19A, License Renewal ML22140A0802022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 5, Reactor Coolant System and Connected Systems ML22140A0602022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, List of Effective Pages ML22140A0752022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 4 of 4 (Redacted) ML22140A0652022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Chapter 12, Radiation Protection ML22140A0622022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawings, Part 3 of 4 ML22140A0732022-04-28028 April 2022 1 to Updated Final Safety Analysis Report, Controlled Drawing Manual Cross-Reference ML22138A2022022-04-28028 April 2022 Submittal of Revision 21 to Updated Final Safety Analysis Report ML20133J9382020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20. (Part 5 of 5, Response to NRC Questions) ML20133J9422020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 2 of 4) (Redacted) ML20133J9402020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing List ML20133J9332020-04-29029 April 2020 Submittal of Updated Final Safety Analysis Report, Revision 20 ML20133J9392020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, List of Effective Pages ML20133J9432020-04-29029 April 2020 Updated Final Safety Analysis Report, Revision 20, STP Controlled Drawing. (Part 3 of 4) 2024-04-25 |