NMP1L3303, General License 30-day Cask Registration Notification and Thermal Performance Assessment

From kanterella
Jump to navigation Jump to search
General License 30-day Cask Registration Notification and Thermal Performance Assessment
ML19212A072
Person / Time
Site: Nine Mile Point, 07201036, 07201004  Constellation icon.png
Issue date: 07/26/2019
From: Shultz B
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NMP1L3303
Download: ML19212A072 (2)


Text

"*"1

,s NMP1 L 3303: -** 10 CFR .i2;2t2(b)(2)

July 2(3, 2019 U.S. NudearHegulatory Commission
Wa~h1ngton, DC :go55Ei~Q001
  • ATTN: Docurnent Control Desk:>::
  • * : Directqr, Divisior,of Spent FUel Stor~ge andTrarispdrtation .

C)ffice:of Nuclear rvlated"aJ: Safety an~ *E,~feglJards Nine Mile Point Nuci:ear Station; Units t and 2 Renewed Facility Operating License Nos. QPR~>3 and NPF~69 -

_Docket Nos. 50:-220 and so~41 o

-Nine MHe Point :Nudea_r Statiqn -i ridependent Sp emf Fuei Sto~age In_stallcition::

Gerieral License -._ _ _____ __

Docket No: 72-1036 i 7 7- ~ ID D lf- * -

SUBJECT:

-- - Gerie.ral License 30~day Qctsk. Registrati()n Notificadoii arid Jh~rrnal Perfqnnarice Assessrneilt .: -

Pursuant to the requirements.of.10 CFR 72.212(b)(2), this letter:prbvides _the information to

<register the use oftwo approved spentfuelstorage casks -a(the Nine Mile Point Nuclear Station :

(NMPNS) Independent Spent Fuel St6rage Installation (ISFSif - : - :. :** .. .. -

_Licensee's Name: .

  • Nine Mrle f:loint Nucle:ar Stadon, LLC : * : -
    • Address: -- PO Box 63 --

- Lycoming, NY 13093_:

Reactor License Nullibers: _ DPR~6:3 and NPF-69 _

Docket Nuinbers: *. _ 50-220, 50:-410 and 72-1036 :_:

person Responsible for _ - benise J. Woiniak Providing =additional information: 3-15-349~4555 Cask Certificate Number: -- 1004: :-

--- ::_. Certificate Amen_dr'nent Numb$r: : *-- *14

- ---- -- :Cask Model Nuniber: - - -- -- NUHOMS~618TH C~sk lcientification Numb~rs: NMP~61BTH-1-A-2-04Q; lqatjed June 27, ~019

  • _NMP-61 BTH-t-0~2L.:041; 1oaded*July 04, 2019 NMP-61 BTH~Lb~~L-042, loa~~d Jult11, 2019

-: A surriinary of the thermal performance of DSCs 40, 41; arid 42 in place at the NMPNS ISFSI is: - -.

submitted .for your information; ::: : . . . . . ..

..Horizontal Storage=Module (HSM) Model:

NUHOMSModel HSM-H ******.

  • jJµJ5SZ4 .
      • J;ifs-??t
  • tvl-/C.- -__
JH~S

., I 30 Day Cask Registration July 26, 2019 Page 2 HSM Identification Number: 7DFS-HSM008H Cask: NMP-61 BTH-1-A-2-040 Calculated Heat Load: 3.051 kW Calculated /1 T: 15.5 degrees.F Actual 11T (Note 1): 10.25 degrees F HSM Identification Number: 7DFS-HSM0081 Cask: NMP-61 BTH-1-D-2L-041 Calculated Heat Load: 14.458 kW Calculated /1T: 45 degrees F Actual /1T (Note 1) : 20.0 degrees F HSM Identification Number: 7DFS-HSM008J Cask: NMP-61 BTH-1-D-2L-042 Calculated Heat Load: 14.404 kW Calculated /1 T: 45 degrees F Actual /1T (Note 1): 34.6 degrees F Note 1: The actual /1T represents the measured /1T obtained during equilibrium conditions.

Equilibrium conditions were achieved when the daily temperature change observed was less than 6 degrees F over three consecutive days.

This letter contains no NRG commitments.

Sincerely, Brandon K. Shultz Regulatory Assurance Manager, Nine Mile Point Nuclear Station Exelon Generation Company, LLC BKS/RMD cc: NRG Regional Administrator, Region I NRG Resident Inspector NRR Project Manager