NL-17-1117, Report of Changes to Emergency Plan

From kanterella
Jump to navigation Jump to search
Report of Changes to Emergency Plan
ML17184A130
Person / Time
Site: Farley, 07200036  Southern Nuclear icon.png
Issue date: 06/30/2017
From: Hutto J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Material Safety and Safeguards, Office of Nuclear Reactor Regulation
References
NL-17-1117
Download: ML17184A130 (3)


Text

~ Southern Nuclear J . J. Hut10

~ry Allails Oireaor

-10 fmc~ Ccm~r Post Office Bo' I:!95 Parl..wa)

Brnningh:un. AI V\1-11 105 991 '\.'!11 td 1ns 992 76111 r:~,

JUN 3 0 2017 iJhutto@i4.,uthemco com Docket Nos.: SD-348 NL-17-1117 50-364 72-Q36 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Joseph M. Farley Nuclear Plant Unit 1 and 2 Reoort of Changes to Emergency Plan Ladies and Gentlemen:

In accordance with 10 CFR 50.54(q)(5) and 10 CFR 72.44{f), Southern Nuclear Operating Company (SNC) hereby submits descriptions of changes to the Plant Farley Emergency Plan and a summary of the analysis demonstrating that the changes do not reduce the effectiveness of the plan. The Emergency Plan, as changed, continues to meet the requirements in 10 CFR 50 Appendix E and the planning standards of 10 CFR 50.47{b). A description of the changes and a summary of analysis is enclosed.

This letter contains no NRC commitments. If you have any questions, please contact Ken McElroy at (205) 992-7369.

Respectfully submitted, J. J. Hutto Regulatory Affairs Director JJH/efb/lac

Enclosure:

1. Description of Changes and Summary of Analysis cc: NRC Regional Administrator, Region II NRC NRR Project Manager- Farley NRC Senior Resident Inspector- Farley SNC Records RTYPE: CFA04.054

Joseph M. Farley Nuclear Plant Unit 1 and 2 Report of Changes to Emergency Plan Description of Changes and Summary of Analysis Enclosure 1 to NL-17-1117 SNC Response to NRC RAis Description of Changes and Summary of Analysis On June 13, 2017, Joseph M. Farley Nuclear Plant (FNP) Unit 1 ahd Unit 2 completed implementations of design changes to the plant vent stack effluent radiation monitors resulting in changes to the emergency plan and emergency action levels (EALs). The existing radiation monitors were aging and obsolete, not reliable, and difficult to maintain, including problems with procuring spare parts. The following radiation monitors were removed: R29B, R-14, R-21, R-22, and R-68. These monitors were replaced by a new General Atomics digital radiation monitoring system on both units. The replacement is not a one for one equipment change; but rather, functions of the existing monitors are being consolidated into the new monitoring system. The new monitoring system has an auto-scaling function that results in fewer monitors but maintains the same number of inputs as the existing system. The new system has low/medium/high range gas detection, particulate, iodine, and noble gas grab sampling capabilities for normal, emergency, and post-accident conditions.

The new radiation monitoring system necessitated minor changes to setpoint values for unit conversions and minor changes to emergency action levels (EALs). SNC has compared the ranges of the monitors being replaced with the ranges of the new monitors being installed and has ensured that the new monitors have a range capable of observing EAL setpoints listed in the Emergency Plan. FNP maintains the ability to declare an emergency based on the initiating conditions and threshold values in the relevant EALs.

These changes were evaluated in accordance with 10 CFR 50.54(q)(3) and it was determined that the new radiation monitors are an improvement in functionality and reliability, and as such, do not reduce the effectiveness of the Farley Emergency Plan. In addition, these changes have been reconciled with the recently approved Farley Emergency Plan Annex and NEI 99-01 Rev.

6 EAL scheme prior to implementation of the SNC Standard Emergency Plan.

Page E1-1