Letter Sequence Request |
|---|
TAC:MF3369, Change in Technical Specifications End States - WCAP-16294 (Approved, Closed) |
|
MONTHYEARML14027A5152014-01-16016 January 2014 WCAP-17828-NP, Revision 0, Indian Point Unit 2 H* Alternate Repair Criteria for the Tubesheet Hydraulic Expansion Region (Model 44F - 4-Loop) Project stage: Request NL-14-001, Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair2014-01-16016 January 2014 Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair Project stage: Other ML14017A1212014-01-16016 January 2014 Comment (00924) of Riverside Church on Behalf of 132 Individuals on PR-51, Waste Confidence - Continued Storage of Spent Nuclear Fuel Project stage: Request ML14069A5342014-03-18018 March 2014 Unit No. - Request for Additional Information Regarding the Steam Generator License Amendment Request to Revise Technical Specification for Permanent Alternate Repair Criteria Project stage: RAI ML14107A0432014-03-31031 March 2014 Enclosure 2 to NL-14-045 - Acceptable Value of the Location of the Bottom of the Expansion Transition (Bet) for Implementation of H* at Indian Point Unit 2 Project stage: Other ML14107A0422014-04-0202 April 2014 Response to Request for Additional Information Regarding the Steam Generator License Amendment Request to Revise Technical Specification for Permanent Alternate Repair Criteria Project stage: Response to RAI NL-14-045, Correction to Entergy Letter NL-14-045, Indian Point Unit Number 22014-04-15015 April 2014 Correction to Entergy Letter NL-14-045, Indian Point Unit Number 2 Project stage: Request ML14139A3962014-06-17017 June 2014 Request for Withholding Information from Public Disclosure Project stage: Withholding Request Acceptance ML15331A2332014-09-0505 September 2014 Official Exhibit - NYS000542-00-BD01 - Indian Point Nuclear Generating Unit No.2- Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair Project stage: Other ML14198A1612014-09-0505 September 2014 Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair (Tac No. MF3369) Project stage: Approval ML15160A4062014-09-0505 September 2014 NYS000542 - Indian Point Nuclear Generating Unit No.2- Issuance of Amendment H* Alternate Repair Criteria for Steam Generator Tube Inspection and Repair Project stage: Other NL-14-128, Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years2014-12-0909 December 2014 Proposed License Amendment Regarding Extending the Containment Type a Leak Rate Testing Frequency to 15 Years Project stage: Other NL-15-068, Response to Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test2015-06-0808 June 2015 Response to Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test Project stage: Response to RAI NL-15-083, Response to Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test2015-06-29029 June 2015 Response to Request for Additional Information Regarding License Amendment to Permanently Extend the Frequency of the Containment Integrated Leak Rate Test Project stage: Response to RAI 2014-04-15
[Table View] |
Text
v0Entergy Enteray Nuclear Northeast Indian Point Energy Center 450 Broadway, GSB P.O. Box 249 Buchanan, NY 10511-0249 Tel 914 254 6700 John A. Ventosa Site Vice President Administration NL-14-058 April 15, 2014 U.S. Nuclear Regulatory Commission ATTN: Document Control Desk 11555 Rockville Pike Rockville, MD 20852
SUBJECT:
Correction to Entergy Letter NL-14-045 Indian Point Unit Number 2 Docket No. 50-247 License No. DPR-26
REFERENCES:
- 1. Entergy Letter NL-14-045 to NRC, Response to Request for Additional Information Regarding the Steam Generator License Amendment Request to Revise Technical Specification for Permanent Alternate Repair Criteria dated April 2, 2014
- 2.
Entergy Letter NL-14-001 to NRC Regarding Proposed License Amendment for Alternate Repair Criteria for Steam Generator Tube Inspection and Repair, dated January 16, 2014
Dear Sir or Madam:
Entergy Nuclear Operations, Inc., (Entergy) provided responses to the NRC request for additional information in Reference 1, regarding Request to Revise Technical Specification for Permanent Alternate Repair Criteria for Indian Point 2 (Reference 2).
In the response to Request #1 in Reference 1, Entergy included in Attachment 2, a replacement page 5.5.7, which was to replace the same page provided in Reference 2. This replacement page changed the accident induced leakage from 150 gpd per SG to 85 gpd per SG. This change was made in error, as the accident induced leakage of 150 gpd per SG was correct, and only the operational leakage of TS 3.4.13 was to be changed from 150 gpd to 85 gpd.
4I~w&
NL-14-058 Docket No. 50-247 Page 2 of 2 Consequently, please discard the replacement page 5.5.7 that was transmitted in Reference 1.
The TS 5.5.7 page from Reference 2 remains valid.
A copy of this response and the associated Attachments is being submitted to the designated New York State official in accordance with 10 CFR 50.91.
If you have any questions or require additional information, please contact Mr. Robert Walpole, Manager, Regulatory Assurance at (914) 254-6710.
I declare under penalty of perjury that the foregoing is true and correct. Executed on April i_..,
2014.
Sincerely, JAV/ai cc:
Mr. Douglas Pickett, Senior Project Manager, NRC NRR DORL Mr. William Dean, Regional Administrator, NRC Region 1 NRC Resident Inspectors Office Mr. John B. Rhodes, President and CEO, NYSERDA Ms. Bridget Frymire, New York State Dept. of Public Service