MONTHYEARML16354A0482017-02-0909 February 2017 Environmental Assessments and Finding of No Significant Impacts to Southern Nuclear Operating Co., Inc ML14211A5752014-02-24024 February 2014 Environmental Assessment and Finding of No Significant Impact ML14027A6562014-02-24024 February 2014 Environmental Assessment- Hatch River Water Level, ME9004 and ME9005 ML13227A2482014-01-23023 January 2014 Environmental Assessment and Finding of No Significant Impact Related to Proposed Exemption to 10 CFR 50.46 and 10 CFR 50 Appendix K for GNF-ZIRON Fuel Cladding Lead Test Assembles (TAC Nos. MF1479 and MF1480 ML1024600772010-11-0202 November 2010 Transmittal Letter, Environmental Assessment and Finding No Significant Hazards NL-09-1862, Request for Schedule Exemption from 10 CFR 73.55(a)(1) Compliance Date2009-11-20020 November 2009 Request for Schedule Exemption from 10 CFR 73.55(a)(1) Compliance Date ML0818903962008-10-27027 October 2008 Issuance of Environmental Assessment, Exemption Request Related to the Use of Ziron Fuel Cladding ML0532200052005-12-14014 December 2005 Environmental Assessment and Finding of No Significant Impact Related to a Request for Exemption from 10 CFR 50.55a(b)(2)(ix)(G) ML0432401682005-02-25025 February 2005 Edwin I Hatch, Units 1 and 2, Vogtle Electric Generating Plant, Units 1 and 2, Environmental Assessment, EOFs 2017-02-09
[Table view] Category:Letter type:NL
MONTHYEARNL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0228, Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21)2023-03-20020 March 2023 Nuclear Property Insurance Coverage as of April 1, 2023 and Licensee Guarantees of Payment of Deferred Premiums (10 CFR 140.21) NL-23-0179, National Pollutant Discharge Elimination System (NPDES) Permit Renewal2023-03-13013 March 2023 National Pollutant Discharge Elimination System (NPDES) Permit Renewal NL-23-0101, Cycle 28 Core Operating Limits Report Version 12023-02-23023 February 2023 Cycle 28 Core Operating Limits Report Version 1 NL-23-0069, Correction of Technical Specification Omission and Typographical Error2023-01-20020 January 2023 Correction of Technical Specification Omission and Typographical Error NL-23-0003, Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 12023-01-20020 January 2023 Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical Specification Table 1 2024-09-09
[Table view] |
Text
Southern Nuclew Operating Company, Inc SOUTHERN'\
November 20, 2009 COMPANY Docket Nos.: 50-321 NL-09-1862 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Request for Schedule Exemption from 10 CFR 73.55(a)(1)
Compliance Date Ladies and Gentlemen:
In accordance with the requirements of 10 CFR 73.5, Southern Nuclear Operating Company (SNC) requested in letter NL-09-1669 dated November 6, 2009 that the Nuclear Regulatory Commission (NRC) approve an exemption from specific requirements of 10 CFR Part 73, "Physical Protection of Plants and Materials" for the Edwin I. Hatch Nuclear Plant (HNP), Units 1 and 2. SNC is requesting an exemption from the March 31, 2010 compliance date specified in 10 CFR 73.55(a)(1) to December 6,2010 as described herein. In letter NL-09 1675, SNC provided the environmental assessment for the security changes requested in the proposed exemption. SNC discussed the exemption request with the NRC on November 17,2009 and the NRC staff requested that SNC supplement the exemption request to clarify the specific item requiring an exemption for the new requirements in the final rule. As a result of the discussion with the NRC staff, the proposed exemption request has been revised and is provided in SNC letter NL-09-1861 dated November 20, 2009. Therefore, this submittal and NL-09-1861 supersede the earlier exemption request (NL-09-1669) and the associated environmental assessment (NL-09-1675) in its entirety.
SNC requests approval of this exemption request by January 29, 2010 so that appropriate and timely actions can be taken to revise and implement the HNP security program. The proposed exemptions are requested to be effective upon issuance. contains the environmental assessment for the security changes requested in the proposed exemption. Enclosure 2 is the non-proprietary version of information in NL-09-1861 dated November 20, 2009 that supports the environmental assessment.
U. S Nuclear Regulatory Commission NL-09-1862 Page 2 Mr. M. J. Ajluni states he is Nuclear Licensing Manager of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company and, to the best of his knowledge and belief, the facts set forth in this letter are true.
This letter contains no NRC commitments. If you have any questions, please advise.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY M.J. Ajluni Manager, Licensing n to and subscribed before me this .dtri!!. day of tlotltwt /:JLh.. J 2009.
Notary Public My commission expires: 1..,;J../ -~ I,;J MJA/BDM/lac
Enclosures:
- 1. Environmental Assessment
- 2. Non-Proprietary Version of Supporting Information cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. D. R. Madison, Vice President - Hatch Ms. P. M. Marino, Vice President - Engineering RTYPE: CHA02.004 U. S. Nuclear Regulatory Commission Mr. L. A. Reyes, Regional Administrator Ms. D. N. Wright, NRR Project Manager - Hatch Mr. J. A. Hickey, Senior Resident Inspector - Hatch
Edwin I Hatch Nuclear Plant - Units 1 and 2 Enclosure 1 Environmental Assessment
Enclosure 1 Environmental Assessment
- 1. Describe any change to the types, characteristics, or quantities of non radiological effluents discharged to the environment as a result of the proposed exemption.
SNC Response There are no expected changes in the types, characteristics, or quantities of non radiological effluents discharged to the environment associated with the proposed exemption. This application is associated with implementation of security changes. These security changes will not result in changes to the design basis requirements for the structures, systems, and components (SSCs) at the Edwin I.
Hatch Nuclear Plant (HNP) that function to limit the release of non-radiological effluents during and following postulated accidents. All the SSCs associated with limiting the release of offsite non-radiological effluents will therefore continue to be able to perform their functions, and as a result; there is no significant non radiological effluent impact. There are no materials or chemicals introduced into the plant that could affect the characteristics or types of non-radiological effluents.
In addition, the method of operation of non-radiological waste systems will not be affected by this change.
- 2. Describe any changes to liquid radioactive effluents discharged as a result of the proposed implementation.
SNC Response There are no expected changes to the liquid radioactive effluents discharged as a result of this exemption. The proposed security changes will not interact to produce any different quantity or type of radioactive material in the reactor coolant system. These security changes will not result in changes to the design basis requirements for the SSCs at the HNP that function to limit the release of liquid radiological effluents during and following postulated accidents. All the SSCs associated with limiting the release of liquid radiological effluents will therefore continue to be able to perform their functions, and as a result, there is no significant liquid radiological effluent impact.
- 3. Describe any changes to gaseous radioactive effluents discharged as a result of the proposed exemption.
SNC Response For the same reasons as described in item 2 above, this change would have no effects on the characteristics of gaseous radioactive effluents.
- 4. Describe any change in the type or quantity of solid radioactive waste generated as a result of the proposed exemption.
E1-1
Enclosure 1 Environmental Assessment SNC Response These security changes will not result in changes to the design basis requirements for the structures, systems, and components (SSCs) at the HNP that function to limit the release of solid waste during and following postulated accidents. All the SSCs associated with limiting the release of solid radioactive waste will therefore continue to be able to perform their function.
Radiation surveys will be performed in accordance with plant radiation protection procedures on excavated soil that could be contaminated, such as inside the protected area or radiation control areas, that will be disposed of offsite. Any contaminated soil will be handled in accordance with plant procedures. HNP has a radiation survey program and procedures to handle any contaminated excavated soil that is inside the protected area or radiation control areas.
- 5. What is the expected change in occupational dose as a result of the proposed exemption under normal and design basis accident conditions?
SNC Response Under normal power operation there would be no expected radiological impact on either the workforce or the public. There are no other expected changes in normal occupational operating doses. Control room dose is not impacted by the proposed security changes and would not impact occupational dose.
- 6. What is the expected change in the public dose as a result of the proposed change under normal and design basis accidents (DBA) conditions?
SNC Response Dose to the public will not be changed by the proposed security changes during normal operations. As noted in items 2, 3 and 4 above there is no basis to contemplate an increased source of liquid, gaseous or solid radiological effluents that could contribute to increased public exposure during normal operations and DBA conditions. The proposed security changes do not impact systems used during normal operation nor systems used to detect or mitigate a DBA.
- 7. What is the impact to land disturbance for the proposed security changes?
SNC Response Land disturbance is considered when performing environmental impact evaluations. Non-radiological environmental impact evaluations will be performed as needed per the Applicability Determination process to support the proposed security changes.
E1-2
Enclosure 1 Environmental Assessment Provisions for dealing with the inadvertent discovery of significant subsurface archaeological deposits and human remains are part of the administrative control procedures in place at HNP in the unlikely event such deposits and remains are encountered. This procedure (51GM-MNT-063, "Excavation Activity Requirements") states that should the excavation uncover potentially historic or archeological significant items, including human remains, the excavation will stop and corporate Environmental Affairs shall be contacted to evaluate the excavation site. None of the proposed security changes are located in areas that are known to have cultural or historical significance.
==
Conclusion:==
There is no significant radiological environmental irnpact associated with the proposed security changes at HNP. These proposed changes will not affect any historical sites nor will they affect non-radiological plant effluents.
E1-3
Edwin I Hatch Nuclear Plant - Units 1 and 2 Enclosure 2 Non-Proprietary Version of Supporting Information
Enclosure 2 Edwin I Hatch Nuclear Plant - Units 1 and 2 Non-Proprietary Version of Supporting Information Southern Nuclear Operating Company (SNC) is requesting an exemption to
[ J The basis for requesting an exemption from the March 31, 2010 compliance date to December 6, 2010 SNC is requesting this exemption from the compliance date specified in 10 CFR 73.55(a)(1) due to a number of issues that will present a significant challenge to timely the new security measures that will be implemented by March 31, 2010, will continue to provide high assurance against the design basis threat of radiological sabotage during this exemption period. SNC is continuing efforts to implement the remaining new Part 73 requirements identified in the March 27, 2009 Federal Register Notice and associated Regulatory Guides completed in July 2009 by March 31, 2010.
E2-1
Enclosure 2 Edwin I Hatch Nuclear Plant - Units 1 and 2 Non*Proprietary Version of Supporting Information SNC has identified an aggressive and comprehensive work scope with a cost of approximately $18 million. In addition to the( ) the following is a description of the additional work activities currently planned to enhance the site protective strategy at HNP.
E2-2
Enclosure 2 Edwin I Hatch Nuclear Plant - Units 1 and 2 Non-Proprietary Version of Supporting Information The size and scope of the Hatch Part 73 project adds considerable challenges when coupled with a planned refueling outage, Part 26 compliance, and other (ecurny-related site modifications. The following items impact implementation Of]
- Design engineering has begun; however, there are details that have yet to be worked out that threaten to delay procurement and/or construction.
- The sequencing of this many activities within such a compressed time frame present a number of challenges. Many activities have to be completed in series with each other while other activities can be accomplished in parallel.
In order to meet the March 31, 2010 date every sequential activity must be compressed and there is no margin to allow for late material delivery, unexpected complications due to design, construction, weather issues, unexpected plant issues that would divert manpower, etc.
- One piece of operating experience that came from implementation of the previous security orders is that decisions made within a compressed schedule to meet an aggressive deadline may meet the intent of the regulation but, since there is not adequate time to thoroughly research and evaluate all available options and considerations, they often create unintended consequences that have long-term adverse impacts on the site. Additional time for design and implementation will help to avoid adverse consequences associated with this project.
- The HNP Unit 1 refueling outage is currently scheduled to start on [ ]
and includes large and complex improvements to the plant. The demands of this outage will have a significant impact on the site's ability to support these major modification projects.
- Functional testing, security strategy validation, and security training must be completed prior to declaring that HNP is in compliance with the new Part 73 requirements. To achieve best results, these activities should not be completed until after all modifications are complete.
- If this exemption is not granted and SNC can not complete the required modifications in time to meet the March 31, 2010 implementation date, additional compensatory or other alternate measures may be required. The majority of these measures would require additional security manpower that HNP is not currently staffed to provide. This additional staffing of security officers would be extremely difficult to achieve due to the new Part 26 work hour requirements and the time required for screening, hiring, and training new security officers.
E2-3
Enclosure 2 Edwin I Hatch Nuclear Plant - Units 1 and 2 Non-Proprietary Version of Supporting Information E2-4