W.

Don E. Grissette Southern Nuclear Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.6474 Fax 205.992.0341 SOUTHERN April 6, 2006 COMPANY Energy to Serve Yo ur Wrld Docket Nos.:

50-424 NL-06-0692 50-425 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Updated Significance Determination Process Information Ladies and Gentlemen:

By letter dated September 2, 2004, letter from Mr. Michael Tschiltz, Chief of the Probabilistic Safety Assessment Branch, the NRC requested that certain Probabilistic Risk Assessment (PRA) information be provided for use in updating the Significance Determination Process (SDP) risk-informed inspection notebooks for Southern Nuclear Operating Company's (SNC) three plants. By letter dated February 24, 2005 (NL 05-0269),

SNC noted that the requested information would be provided as it became available upon the completion of the respective revised plant PRA models. The PRA model revision has recently been completed for the Vogtle Electric Generating Plant (VEGP).

Enclosed is a compact disc containing the requested information for VEGP. As stated in the September 2, 2004 request for information, the NRC has made a preliminary determination, in accordance with the provisions of 10 CFR 2.390, that the information requested and the SDP notebooks may relate to a plant's physical protection. In accordance with this determination, this information has been marked as "proprietary information" and should be withheld from public disclosure.

Sincerely, Don E. Grissette DEG/JMG/sdl

Enclosures:

Response Key - Vogtle Notebook Update for Revision 2 Benchmark Request CD of Response Documentation 14'D I

U. S. Nuclear Regulatory Commission NL-06-0692 Page 2 cc:

Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. T. E. Tynan, General Manager - Plant Vogtle RType: CVC7000 U. S. Nuclear Regulatory Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Vogtle Mr. G. J. McCoy, Senior Resident Inspector - Vogtle Mr. M. D. Tschiltz, Deputy Director, Risk Assessment Mr. M. X. Franovich, Division of Risk Assessment Mr. R. L. Perch, Probabilistic Safety Assessment Branch Mr. W. G. Rogers, NRC Region II, SRA (w/o Enclosures)

(w/o Enclosures)

(w/o Enclosures)

(w/o Enclosures)