NL-05-0847, Fourth 10 -Year Interval IST Program Update

From kanterella
(Redirected from NL-05-0847)
Jump to navigation Jump to search
Fourth 10 -Year Interval IST Program Update
ML051320361
Person / Time
Site: Hatch  Southern Nuclear icon.png
Issue date: 05/09/2005
From: Sumner H
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NL-05-0847
Download: ML051320361 (3)


Text

- t H.L Sumner, Jr. Southern Nuclear Vice President Operating Company, Inc.

Hatch Project Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 SOUTHERN A May 9, 2005 COMPANY Energy to Serve Your World Docket Nos.: 50-321 NL-05-0847 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin 1.Hatch Nuclear Plant Fourth 10-Year Interval 1ST Program Update Ladies and Gentlemen:

By letter dated April 20, 2005 Southern Nuclear Operating Company (SNC) submitted Inservice Testing Relief Request RR-P-1. Subsequently, SNC discovered that the incorrect group designation had been shown for Residual Heat Removal (RHR) and Residual Heat Removal Service Water (RHRSW) pumps on pages 4 of 9 and 6 of 9 of RR-P-1. The only changes are RHR and RHRSW pumps being classified as Group A pumps instead of Group B pumps. The corrected pages are enclosed.

This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, H. L. Sumner, Jr.

HLS/ifl/daj

Enclosures:

Relief Request RR-P-I pages 4 of 9 and 6 of 9 cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHAO2.004 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch

I RR-P-1 PUMP TABLE 1 - UNIT 1 MPL No./OM DESIGN DATA ACCIDENT DATA REFERENCE IST Qr REMARKS Code Group_

IC41-COOIA 43 gpm at 1190 psig 41.2 gpm at 21232 (1) HNP-2 FSAR 44 gpm Quarterly IST performed at 2 Group B psig Table 15.4-1 Accident required flow rate.

(2) Tech Spec SR 3.1.7.7 IC41-COOIB Same as lC41- Same as IC41- Same as lC41- 43.1 gpm Same as IC41-COOIA Group B COOlA COOIA COOIA lEl1-COOIA 4000 gpm at 955-ft 2 4000 gpm (1) HNP-1 FSAR 4000 Quarterly IST performed at Group A TDH Table 10.6-1 gpm Accident required flow rate.

(2) Tech Spec Bases

__ 3.7.1 IEI I-COOIB Same as lEl l- Same as EI I- Same as EI I- 4000 Same as ElI I-COOIA Group A COOIA COOIA COOIA 9p1 lE11 -COOIC Same as ElI I- Same as EI I- Same as IEI I- 4000 Same as IEI I-COOIA Group A COOIA COOIA COOlA gpm lE11-COOID Same as E11l- Same as lEI I- Same as EI I- 4000 Same as EIl I-COOIA Group A COOIA COOIA COOIA gpm IEI -CO02A 7700 gpm at 420-ft (1) 6900 gpm (1) HNP-2 FSAR 7700 Quarterly IST performed at 2 Group A TDH (2) Ž17000 gpm for Table 6.2-3 gpm individual pump Accident required 2 pumps with RPV 2 (2) Tech Spec 3.5.1.7 flow rate plus Refueling Outage 20 psig IST at a 2-pump/train flow rate of

> 17,000 gpm at AP 2 158 psid.

IEIl-CO02B Same as lEll- Same as IEI I- Same as IEl I- 7700 Same as IEI I-CO02A Group A C002A C002A C002A gpm lE I-CO02C Sameas lEII- Sameas IEI- Sameas I1ll- 7700 Sameas lEll-C002A Group A C002A C002A C002A 9pm lElI-CO02D Same as lEll- Same as lElI - Same as lEl l- 7700 Same as IEI I-CO02A Group A C002A C002A C002A gpm Page 4 of 9

RR-P-1 PUMP TABLE 1 - UNIT 2 MPL No. DESIGN DATA ACCIDENT DATA REFERENCE IST Qr REMARKS 2C41-COOIA 43 gpm at 1190 psig 41.2 gpm at 21232 (1) HNP-2 FSAR 44.6 Quarterly IST performed at 2 Group B psig Table 15.4-1 Accident required flow rate.

(2) Tech Spec SR 3.1.7.7 2C41-COOIB Same as 2C41- Same as 2C41 - Same as 2C41- 43.1 Same as 2C41-COO1A Group B COOIA COOtA COOlA 2El 1-COOIA 4000 gpm at 955-ft 2 4000 gpm (1) HNP-1 FSAR 4000 Quarterly IST performed at Group A TDH Table 10.6-1 Accident required flow rate.

(2) Tech Spec Bases

__ _ __ _ _ _ _ __ __ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ 3 .7.1_ _ _ _ _ _ _ _ _ _ _ _ _ _ _

2E1 l-COOlB Same as 2EI I- Same as 2E1 I- Same as 2E1 1- 4000 Same as 2E1 l-COOlA Group A COOlA COOIA COOIA 2El l-COOlC Same as 2E1 1- Same as 2E1 1- Same as 2E1 1- 4000 Same as 2E1 1-COOlA Group A COOlA COOIA COOlA 2E1 l-COOlD Same as 2E1 1- Same as 2E1 1- Same as 2El 1- 4000 Same as 2El 1-COOIA Group A COOlA COOIA COOIA 2El l-C002A 7700 gpm at 420-ft (1) 6900 gpm (1) HNP-2 FSAR 7700 Quarterly IST performed at 2 Group A TDH (2) Ž17000 gpm for Table 6.2-3 individual pump Accident required 2 pumps with RPV 2 (2) Tech Spec 3.5.1.7 flow rate plus Refueling Outage 20 psig IST at a 2-pump/train flow rate of

> 17,000 gpm at AP 2 158 psid.

2E1 I-C002B Same as 2E1 1- Same as 2E1 I- Same as 2E1 I- 7800 Same as 2E1 1-CO02A Group A C002A C002A C002A 2El l-C002C Same as 2EI I- Same as 2E1 I- Same as 2E1 I- 7700 Same as 2EI I-CO02A Group A C002A C002A C002A 2EI I-COO2D Same as 2E1 1- Same as 2EI I- Same as 2E1 I- 7700 Same as 2E1 I-C002A Group A C002A C002A C002A Page 6 of 9