MONTHYEARNL-23-0930, Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program2024-09-11011 September 2024 Application to Revise Technical Specifications to Adopt TSTF-591, Revise Risk Informed Completion Time (RICT) Program NL-24-0337, Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program2024-09-0909 September 2024 Interim 10 CFR 21.21(a)(2) Report Regarding Operation Technology, Inc., ETAP Software Error in Transient Stability Program NL-24-0334, 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc2024-09-0303 September 2024 0 to the Updated Final Safety Analysis Report, Technical Specifications Bases Changes, Technical Requirements Manual Changes, License Renewal 10 CFR 54 .37(b) Changes, 10 CFR 50.59 Summary Report & Revised Nrc NL-24-0313, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information2024-08-23023 August 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint Response to Request for Additional Information NL-24-0290, Response to Request for Additional Information Related to Request for Specific Exemption2024-07-26026 July 2024 Response to Request for Additional Information Related to Request for Specific Exemption NL-24-0276, Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-07-26026 July 2024 Post-Audit Supplement to License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0261, 10 CFR 50.46 ECCS Evaluation Model Annual Report for 20232024-07-19019 July 2024 10 CFR 50.46 ECCS Evaluation Model Annual Report for 2023 NL-24-0260, Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R312024-07-0909 July 2024 Inservice Inspection Program Owner’S Activity Report (OAR-1) for Refueling Outage 1R31 NL-24-0240, Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link2024-07-0303 July 2024 Reactor Core Isolation Cooling (RCIC) System Inoperable Due to Mispositioned Link NL-24-0237, Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications2024-07-0303 July 2024 Incorrectly Installed Temporary Modification Results in Multiple Conditions Prohibited by Plant Technical Specifications NL-24-0143, Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in2024-06-27027 June 2024 Proposed Alternative to Use ASME Code Case N-752, Risk-Informed Categorization and Treatment for Repair/ Replacement Activities in NL-24-0239, Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-1392024-06-17017 June 2024 Response to Apparent Violation in NRC Inspection Report 05000321, 366/2024090: EA-23-139 NL-24-0148, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-06-0404 June 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0202, SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations2024-05-24024 May 2024 SNC Response to Regulatory Issue Summary 2024-01: Preparation and Scheduling of Operator Licensing Examinations NL-24-0191, Annual Radiological Environmental Operating Reports for 20232024-05-10010 May 2024 Annual Radiological Environmental Operating Reports for 2023 NL-24-0166, Manual Reactor Trip Due to Loss of Feedwater2024-05-0909 May 2024 Manual Reactor Trip Due to Loss of Feedwater NL-24-0195, Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water.2024-05-0707 May 2024 Response to Request for Additional Information Regarding License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water. NL-24-0064, Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.52024-05-0303 May 2024 Units 1 & 2 and Hatch Nuclear Plant - Units 1 & 2 License Amendment Request to Revise Technical Specification 1.1 and Add Online Monitoring Program to Technical Specification 5.5 NL-24-0165, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20232024-04-25025 April 2024 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2023 NL-24-0157, Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications2024-04-24024 April 2024 Incorrectly Installed Temporary Modification Results in a Condition Prohibited by Plant Technical Specifications NL-24-0026, Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint2024-04-19019 April 2024 Application to Revise Technical Specifications Surveillance Requirements to Increase Safety/Relief Valves Setpoint NL-24-0144, Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La)2024-04-0909 April 2024 Primary Containment Penetration Exceeded Maximum Allowable Primary Containment Leakage Rate (La) NL-24-0115, Response to Request for Additional Information Exemption Requests for Physical.2024-04-0404 April 2024 Response to Request for Additional Information Exemption Requests for Physical. NL-24-0116, Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred.2024-03-29029 March 2024 Nuclear Property Insurance Coverage as of April 1, 2024 and Licensee Guarantees of Payment of Deferred. NL-24-0062, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2024-03-12012 March 2024 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-24-0089, Correction of Technical Specification Omission2024-03-0909 March 2024 Correction of Technical Specification Omission NL-24-0061, Cycle 32 Core Operating Limits Report Version 12024-03-0101 March 2024 Cycle 32 Core Operating Limits Report Version 1 NL-24-0067, 10 CFR 72.48(d)(2) Biennial Report2024-02-26026 February 2024 10 CFR 72.48(d)(2) Biennial Report NL-24-0051, License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components2024-02-20020 February 2024 License Amendment Request to Revise Renewed Facility Operating Licenses to Adopt an Alternative Seismic Method for Categorization of Structures, Systems, and Components NL-24-0042, Response to Request for Additional Information Exemption Requests for Physical Barriers2024-02-13013 February 2024 Response to Request for Additional Information Exemption Requests for Physical Barriers NL-24-0033, Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers2024-02-0505 February 2024 Response to Question for Withholding Information from Public Disclosure Exemption Requests for Physical Barriers NL-24-0014, Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical.2024-01-30030 January 2024 Revised Response to Request for Additional Information Regarding License Amendment Request to Relax the Required Number of Fully Tensioned Reactor Pressure Vessel Head Closure Studs in Technical. NL-23-0889, Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems2023-12-0606 December 2023 Units 1 and 2 - License Amendment Request to Revise Technical Specifications to Adopt Risk Informed Completion Times for Residual Heat Removal Service Water (RHRSW) and Plant Service Water (Psw) Systems NL-23-0879, Request for Exemption from Security Event Notification Implementation2023-11-29029 November 2023 Request for Exemption from Security Event Notification Implementation NL-23-0841, Update to Notice of Intent to Pursue Subsequent License Renewal2023-11-20020 November 2023 Update to Notice of Intent to Pursue Subsequent License Renewal NL-23-0658, Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal2023-08-11011 August 2023 Southern Nuclear Operating Company - Response to Request for Additional Information Regarding Quality Assurance Topical Report Submittal NL-23-0542, CFR 50.46 ECCS Evaluation Model Annual Report for 20222023-08-0909 August 2023 CFR 50.46 ECCS Evaluation Model Annual Report for 2022 NL-23-0624, Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis2023-08-0404 August 2023 Report of Changes to Emergency Plan and Summary of 50.54(q) Analysis NL-23-0566, ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use2023-07-13013 July 2023 ISFSI and Edwin I. Hatch Nuclear Plant ISFSI - Registration of Spent Fuel Cask Use NL-23-0555, Request for Exemption from Physical Barrier Requirement2023-07-0707 July 2023 Request for Exemption from Physical Barrier Requirement NL-23-0444, Quality Assurance Topical Report Submittal2023-06-15015 June 2023 Quality Assurance Topical Report Submittal NL-23-0457, ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use2023-06-12012 June 2023 ISFSI, and Edwin I. Hatch Nuclear Plant, ISFSI - Registration of Spent Fuel Cask Use NL-23-0422, Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R272023-05-30030 May 2023 Inservice Inspection Program Owner'S Activity Report for Refueling Outage 2R27 NL-23-0383, SNC Response to Regulatory Issue Summary 2023-01:Preparation And.2023-05-19019 May 2023 SNC Response to Regulatory Issue Summary 2023-01:Preparation And. NL-23-0372, Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 20222023-05-10010 May 2023 Units 1 & 2, Joseph M. Farley Nuclear Plant - Units 1 & 2, Vogtle Electric Generating Plant - Units 1 & 2, Annual Radiological Environmental Operating Reports for 2022 NL-23-0310, Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 20222023-04-25025 April 2023 Annual Non-Radiological Environmental Operating Reports and Annual Radioactive Effluent Release Reports for 2022 NL-23-0019, GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI2023-04-12012 April 2023 GEN-ISI-ALT-2023-01, Request to Use Provision of a Later Edition of the ASME Boiler and Pressure Vessel Code, Section XI NL-23-0263, Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report2023-04-0505 April 2023 Southern Nuclear Company Submittal of Drug and Alcohol Testing Errors Identified 10 CFR 26.719(c) 30-Day Report NL-23-0014, Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding2023-03-29029 March 2023 Southern Nuclear Operating Co Submittal of Report on Status of Decommissioning Funding NL-23-0208, Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update2023-03-29029 March 2023 Independent Spent Fuel Storage Installation ISFSI, Decommissioning Funding Plan Triennial Update 2024-09-09
[Table view] |
Text
H.L Sumner, Jr. Southern Nuclear Vice President Operating Company. Inc.
Hatch Project Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 SOUTHERN hum October 27, 2004 COMPANY Energy to Serve Your WorldW DocketNos.: 50-321 NL-04-2035 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Revised Schedule for Generic Letter 2003-01 Control Room Habitability Ladies and Gentlemen:
By letters dated August 4, 2003 and March 29, 2004, Southern Nuclear Operating Company (SNC) submitted a course of action, including a schedule and associated justification, for developing responses to Generic Letter (GL) 2003-0 1, "Control Room Habitability" information requests. This letter provides a revision to the schedule for ASTM E741 tracer gas testing and responding to the GL 2003-01 information requests for the Edwin I. Hatch Nuclear Plant (HNP).
Based on an October 7, 2004 telephone conference between NRC staff and SNC personnel, SNC concluded that significant regulatory uncertainty existed regarding: 1) interpretation of the operability status of the control room with respect to potential tracer gas test results, and 2) the application of certain compensatory measures including potassium iodide. The regulatory uncertainty resulted from NRC staff discussion on the October 7 telecon that appeared to be inconsistent with the guidance contained in the NRC letter to NEI, dated January 30, 2004, titled "NEI Draft White Paper, Use of the Generic Letter 91-18 Process and Alternative Source Terms in the Context of Control Room Habitability", as well as NRC/industry guidance contained in GL 91-18 revision 1, control room habitability related Regulatory Guides 1.196 and 1.197, and NEI control room habitability guidance in NEI 99-03 revisions 0 and 1. Since these issues could not be resolved prior to planned HNP tracer gas testing starting October 11, 2004, SNC has elected to revise the schedule.
Consistent with plans to conduct the HNP tracer gas testing the week beginning October 11, 2004, SNC had completed planned control room boundary maintenance. In addition, the necessary test procedures were already in place and the test vendor was completing final arrangements in preparation for starting testing October 11, 2004.
Finally, those procedure changes necessary to support planned compensatory measures were ready for implementation should they have been required.
As a result of the regulatory uncertainty introduced by the October 7 telecon, SNC now plans to complete tracer gas testing within 120 days of receipt of NRC approval for
U. S. Nuclear Regulatory Commission NL-04-2035 Page 2 implementation of an alternative source term (AST) in accordance with 10 CFR 50.67.
Within 90 days after completion of the HNP tracer gas testing, SNC wvill submit the information requested by GL 2003-01. The license amendment request supporting full scope implementation of an AST in accordance with Regulatory Guide 1.183 is planned for submittal by December 31, 2004.
The revised schedule allows for HNP tracer gas testing to be performed following implementation of AST which will result in a design basis control room unfiltered inleakage value with considerably more design margin than the current HNP licensing/design basis. Discussions between NRC staff and SNC personnel during the NEI Licensing Forum on October 20-21, 2004 appeared to deal with some of the issues raised during the October 7 telecon. However, continued significant regulatory uncertainty regarding the application of potassium iodide as a compensatory measure remains a fundamental impediment to conducting tracer gas testing prior to implementation of AST.
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely, H. L. Sumner, Jr.
HLS/CLT/daj cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHAO2.004 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch
Text
H.L Sumner, Jr. Southern Nuclear Vice President Operating Company. Inc.
Hatch Project Post Office Box 1295 Birmingham. Alabama 35201 Tel 205.992.7279 SOUTHERN hum October 27, 2004 COMPANY Energy to Serve Your WorldW DocketNos.: 50-321 NL-04-2035 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin I. Hatch Nuclear Plant Revised Schedule for Generic Letter 2003-01 Control Room Habitability Ladies and Gentlemen:
By letters dated August 4, 2003 and March 29, 2004, Southern Nuclear Operating Company (SNC) submitted a course of action, including a schedule and associated justification, for developing responses to Generic Letter (GL) 2003-0 1, "Control Room Habitability" information requests. This letter provides a revision to the schedule for ASTM E741 tracer gas testing and responding to the GL 2003-01 information requests for the Edwin I. Hatch Nuclear Plant (HNP).
Based on an October 7, 2004 telephone conference between NRC staff and SNC personnel, SNC concluded that significant regulatory uncertainty existed regarding: 1) interpretation of the operability status of the control room with respect to potential tracer gas test results, and 2) the application of certain compensatory measures including potassium iodide. The regulatory uncertainty resulted from NRC staff discussion on the October 7 telecon that appeared to be inconsistent with the guidance contained in the NRC letter to NEI, dated January 30, 2004, titled "NEI Draft White Paper, Use of the Generic Letter 91-18 Process and Alternative Source Terms in the Context of Control Room Habitability", as well as NRC/industry guidance contained in GL 91-18 revision 1, control room habitability related Regulatory Guides 1.196 and 1.197, and NEI control room habitability guidance in NEI 99-03 revisions 0 and 1. Since these issues could not be resolved prior to planned HNP tracer gas testing starting October 11, 2004, SNC has elected to revise the schedule.
Consistent with plans to conduct the HNP tracer gas testing the week beginning October 11, 2004, SNC had completed planned control room boundary maintenance. In addition, the necessary test procedures were already in place and the test vendor was completing final arrangements in preparation for starting testing October 11, 2004.
Finally, those procedure changes necessary to support planned compensatory measures were ready for implementation should they have been required.
As a result of the regulatory uncertainty introduced by the October 7 telecon, SNC now plans to complete tracer gas testing within 120 days of receipt of NRC approval for
U. S. Nuclear Regulatory Commission NL-04-2035 Page 2 implementation of an alternative source term (AST) in accordance with 10 CFR 50.67.
Within 90 days after completion of the HNP tracer gas testing, SNC wvill submit the information requested by GL 2003-01. The license amendment request supporting full scope implementation of an AST in accordance with Regulatory Guide 1.183 is planned for submittal by December 31, 2004.
The revised schedule allows for HNP tracer gas testing to be performed following implementation of AST which will result in a design basis control room unfiltered inleakage value with considerably more design margin than the current HNP licensing/design basis. Discussions between NRC staff and SNC personnel during the NEI Licensing Forum on October 20-21, 2004 appeared to deal with some of the issues raised during the October 7 telecon. However, continued significant regulatory uncertainty regarding the application of potassium iodide as a compensatory measure remains a fundamental impediment to conducting tracer gas testing prior to implementation of AST.
This letter contains no NRC commitments. If you have any questions, please advise.
Sincerely, H. L. Sumner, Jr.
HLS/CLT/daj cc: Southern Nuclear Operating Company Mr. J. T. Gasser, Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHAO2.004 U. S. Nuclear Regulatorv Commission Dr. W. D. Travers, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch