H. L Sumner, Jr. Southern Nuclear Vice President Operating Company, Inc.

Hatch Project Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7279 SOUTHERNAh COMPANY March 29, 2004 Energy to Serve YourWorldw Docket Nos.: 50-321 NL-04-0496 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin 1. Hatch Nuclear Plant Revised Schedule for Generic Letter 2003-01 Control Room Habitability Ladies and Gentlemen:

By letter dated August 4, 2003, Southern Nuclear Operating Company (SNC) submitted a proposed alternative course of action, including a schedule and associated justification, for developing responses to Generic Letter (GL) 2003-01, "Control Room Habitability,"

information requests. This letter revises the submitted alternative schedule for the Edwin I. Hatch Nuclear Plant (HNP). The schedules provided in the referenced August 4, 2003 SNC letter for the Joseph M. Farley Nuclear Plant and the Vogtle Electric Generating Plant remain unchanged.

Specifically, SNC is revising the HNP schedule for completing ASTM E741 testing.

SNC now plans to complete tracer gas testing by December 31, 2004, instead of June 30, 2004 as stated in the SNC August 4, 2003 letter. Within 90 days after completion of the HNP tracer gas testing, consistent with the SNC August 4, 2004 letter, SNC will submit a schedule for the remaining activities determined to be necessary to provide the information requested by GL 2003-01.

Notwithstanding ongoing analysis and control room boundary maintenance to support the original testing schedule, SNC has recently determined that several factors justify the revised schedule. These factors include the complexity of HNP control room boundary maintenance due to the control room location, continuing NEI/NRC interaction regarding use of the GL 91-18 process and alternative source term (AST) in the context of control room habitability, and test vendor availability.

In addition, SNC intends to submit a license amendment request supporting full scope implementation of an AST in accordance with Regulatory Guide 1.183 for NRC review no later than August 31, 2004. The revised tracer gas testing schedule will support submittal of the most limiting measured unfiltered inleakage within the NRC's expected AST review period, confirming the bounding nature of the unfiltered inleakage value assumed for the AST.

v\ou

U. S. Nuclear Regulatory Commission NL-04-0496 Page 2 This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, H. L. Sumner, Jr.

HLS/CLT/daj cc: Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHAO2.004 U. S. Nuclear Regulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch

Text

H. L Sumner, Jr. Southern Nuclear Vice President Operating Company, Inc.

Hatch Project Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7279 SOUTHERNAh COMPANY March 29, 2004 Energy to Serve YourWorldw Docket Nos.: 50-321 NL-04-0496 50-366 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Edwin 1. Hatch Nuclear Plant Revised Schedule for Generic Letter 2003-01 Control Room Habitability Ladies and Gentlemen:

By letter dated August 4, 2003, Southern Nuclear Operating Company (SNC) submitted a proposed alternative course of action, including a schedule and associated justification, for developing responses to Generic Letter (GL) 2003-01, "Control Room Habitability,"

information requests. This letter revises the submitted alternative schedule for the Edwin I. Hatch Nuclear Plant (HNP). The schedules provided in the referenced August 4, 2003 SNC letter for the Joseph M. Farley Nuclear Plant and the Vogtle Electric Generating Plant remain unchanged.

Specifically, SNC is revising the HNP schedule for completing ASTM E741 testing.

SNC now plans to complete tracer gas testing by December 31, 2004, instead of June 30, 2004 as stated in the SNC August 4, 2003 letter. Within 90 days after completion of the HNP tracer gas testing, consistent with the SNC August 4, 2004 letter, SNC will submit a schedule for the remaining activities determined to be necessary to provide the information requested by GL 2003-01.

Notwithstanding ongoing analysis and control room boundary maintenance to support the original testing schedule, SNC has recently determined that several factors justify the revised schedule. These factors include the complexity of HNP control room boundary maintenance due to the control room location, continuing NEI/NRC interaction regarding use of the GL 91-18 process and alternative source term (AST) in the context of control room habitability, and test vendor availability.

In addition, SNC intends to submit a license amendment request supporting full scope implementation of an AST in accordance with Regulatory Guide 1.183 for NRC review no later than August 31, 2004. The revised tracer gas testing schedule will support submittal of the most limiting measured unfiltered inleakage within the NRC's expected AST review period, confirming the bounding nature of the unfiltered inleakage value assumed for the AST.

v\ou

U. S. Nuclear Regulatory Commission NL-04-0496 Page 2 This letter contains no NRC commitments. If you have any questions, please advise.

Sincerely, H. L. Sumner, Jr.

HLS/CLT/daj cc: Southern Nuclear Operating Company Mr. J. B. Beasley, Jr., Executive Vice President Mr. G. R. Frederick, General Manager - Plant Hatch RTYPE: CHAO2.004 U. S. Nuclear Regulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. C. Gratton, NRR Project Manager - Hatch Mr. D. S. Simpkins, Senior Resident Inspector - Hatch