Results of Reactor Pressure Vessel Head Inspections, as Required by NRC Bulleting 2003-02
ML033570131
Person / Time
Site: Vogtle Southern Nuclear icon.png
Issue date: 12/19/2003
From: Gasser J
Southern Nuclear Operating Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
BL-03-002, NL-03-2394
Download: ML033570131 (6)


Text

Jeffrey T.Gasser Southern Nuclear -

Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN December 19, 2003 COMPANY Energy to Serve YourWorld' Docket No.: 50-424 NL-03-2394 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Results of Reactor Pressure Vessel Head Inspections Required bv NRC Bulletin 2003-02 Ladies and Gentlemen:

During the recent fall 2003 refueling outage (IRI 1) at Unit I of the Vogtle Electric Generating Plant (VEGP-1), Southern Nuclear Operating Company (SNC) completed a bare metal visual examination of the Alloy 600 nozzles penetrating the bottom head of the reactor pressure vessel (RPV) and a general inspection of the bottom head area. Pursuant to the requirements of NRC Bulletin 2003-02, "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity," issued to SNC on August 21, 2003, SNC hereby submits the enclosed report which constitutes the required 60-day response for VEGP-1.

Mr. J. T. Gasser states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.

This letter contains no NRC commitments. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY 1f T Jeffr y asser

....... Sorn to andsubscribedbefore me this Jday of 2003.

~ ~

, - I

-. ,..-- ' -, - 7 My commission expires _______

0jc51

U. S. Nuclear Regulatory Commission NL-03-2394 Page 2 JTG/DRG

Enclosure:

Vogtle Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" cc: Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. S. D. Bloom, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle

Enclosure Vogtle Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity"

Enclosure Vogtle Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" During the recent fall 2003 refueling outage (IRI 1) at Unit I of the Vogtle Electric Generating Plant (VEGP-1), Southern Nuclear Operating Company (SNC) completed a bare metal visual examination of the Alloy 600 nozzles penetrating the bottom head of the reactor pressure vessel (RPV) and a general inspection of the bottom head area. Pursuant to NRC Bulletin 2003-02, "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity," issued to the SNC on August 21, 2003, SNC hereby responds to the 60-day inspection summary request set forth in NRC Request 2 of the Bulletin with respect to VEGP-1.

VEGP-1 returned to on-line service on October 22, 2003.

NRCRequest: Within 60 days ofplant restartfolloivingileinext inspection ofthe RPVlowter headpenetrations,the subject PJER addresseesshouldsubinit to the ANRC a sumnmiary of the inspectionsperformed, the extent of the inspections, the methods used, a description of the as-found condition of the lower head,anyfindings of relevant indications of t/irough-wallleakage, and a summary of the disposition of anyfindings of boric aciddeposits and any corrective actions taken as a result of indicationsfound:

SNC Response:

Examination:

A remote visual examination was performed on the outer surface of the RPV bottom closure head during the recent fall refueling outage (RFO-IRI 1) at VEGP-1 with a resolution capability at least equivalent to that obtained by direct visual observation. These inspections included a bare metal visual examination of all the Alloy 600 nozzles penetrating the bottom head of the vessel and a general inspection of the bottom head area for indications of wastage or significant corrosion of the low alloy steel vessel. The entire circumference of the interface of each nozzle with the vessel was evaluated for the presence of any deposits that might indicate leakage from the annulus between the nozzle and the head. These inspections were performed as recommended in Materials Reliability Program (MRP) letter MRP 2003-017 dated June 23, 2003.

Results:

No evidence of head material wastage or of leaking or cracked bottom mounted instrumentation (BMI) nozzles was found by bare metal visual examination of the RPV bottom head. However, a V-shaped rust stain was identified during inspection of the BMI Penetrations. The rust stain was oriented below the Loop 3 Cold Leg (CL) and extended from the bottom of the RPV up the side approximately 10 feet. To identify the cause of the rust, an inspection and sampling plan was developed. The plan included inspections and sampling around the Loop 3 CL and the bottom of the RPV. To inspect the Loop 3 CL, the sheet metal insulation was loosened and the insulation blankets were inspected. No boron residue or rust was visible on the bare metal at the nozzle transition region. Wet swipe samples were collected from the Loop 3 CL nozzle area. The bottom of the RPV was also inspected, areas around the bottom mounted instrumentation tubes in the rusted area were sampled with a wet swipe, and loose particles were removed with a scotch brite pad. Isotopic analysis of the samples (wet swipes and loose particles) determined that the NL-03-2394 PagelI of 3

Enclosure Vogtlc Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" rust contained particulate with a nuclide signature similar to Refueling Water Storage Tank water from 5.7 and 6.9 years ago. Refuelings 1R6 and IR7 occurred during this time period. The samples were also analyzed for boron and lithium. This analysis identified low levels of boron, but the results for lithium were below detectable limits. The sample analysis supports the conclusion that the rust was caused by a water leak from the refueling cavity during outage activities and not by Reactor Coolant System leakage.

Cause:

The size and location of the rust stain indicates that the rust was caused by water flowing down the reactor vessel. Due to the high temperature of the reactor vessel during power operations, this could only occur during refueling conditions. Located directly above each RPV loop nozzle is a ventilation port that is sealed during refueling to allow reactor cavity flooding. Based on sample analysis and review of applicable design drawings, it was concluded that one of these ventilation ports was leaking which resulted in water spraying onto the reactor vessel insulation and eventually flowing down the side of the reactor pressure vessel resulting in surface rusting of the RPV.

Corrective Actions:

Since the rust posed no threat to RPV integrity, only minor hand cleaning in the area of the BMI tubes was performed to facilitate future inspections.

Safety Significance:

The rust was determined to be minor surface rust that had no impact to reactor pressure vessel integrity.

Documentation:

The examination performed was documented by a written report supplemented by video and photographic images supporting the examination findings. This report also provides a baseline for future examinations.

Additional Inspection:

In addition to the bare metal visual examination of the RPV bottom head, a bare metal visual examination of > 99% of the RPV top head surface including 3600 around each RPV head penetration nozzle was performed. No evidence of head material wastage or of leaking or cracked nozzles was found by bare metal visual examination of the RPV top head. Scope of this examination was not 100% of the head surface because of the small area (<I%) of the head made inaccessible by the shroud support structure and insulation. However, a modification to the insulation was performed prior to the examination in order to make accessible a larger portion of the RPV top head. The examination was documented by a written report supplemented by video NL-03-2394 . Page 2 of 3

- S -

Enclosure Vogtle Electric Generating Plant Unit 1 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" and photographic images supporting the examination findings. This report also provides an up-dated baseline for future examinations.

NL-03-2394 Page 3 of 3

Text

Jeffrey T.Gasser Southern Nuclear -

Vice President Operating Company, Inc.

40 Inverness Center Parkway Post Office Box 1295 Birmingham, Alabama 35201 Tel 205.992.7721 Fax 205.992.0403 SOUTHERN December 19, 2003 COMPANY Energy to Serve YourWorld' Docket No.: 50-424 NL-03-2394 U. S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, D. C. 20555-0001 Vogtle Electric Generating Plant Results of Reactor Pressure Vessel Head Inspections Required bv NRC Bulletin 2003-02 Ladies and Gentlemen:

During the recent fall 2003 refueling outage (IRI 1) at Unit I of the Vogtle Electric Generating Plant (VEGP-1), Southern Nuclear Operating Company (SNC) completed a bare metal visual examination of the Alloy 600 nozzles penetrating the bottom head of the reactor pressure vessel (RPV) and a general inspection of the bottom head area. Pursuant to the requirements of NRC Bulletin 2003-02, "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity," issued to SNC on August 21, 2003, SNC hereby submits the enclosed report which constitutes the required 60-day response for VEGP-1.

Mr. J. T. Gasser states he is a Vice President of Southern Nuclear Operating Company, is authorized to execute this oath on behalf of Southern Nuclear Operating Company, and to the best of his knowledge and belief, the facts set forth in this letter are true.

This letter contains no NRC commitments. If you have any questions, please advise.

Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY 1f T Jeffr y asser

....... Sorn to andsubscribedbefore me this Jday of 2003.

~ ~

, - I

-. ,..-- ' -, - 7 My commission expires _______

0jc51

U. S. Nuclear Regulatory Commission NL-03-2394 Page 2 JTG/DRG

Enclosure:

Vogtle Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" cc: Southern Nuclear Operating Company Mr. J. D. Woodard, Executive Vice President Mr. W. F. Kitchens, General Manager - Plant Vogtle Mr. M. Sheibani, Engineering Supervisor - Plant Vogtle Document Services RTYPE: CVC7000 U. S. Nuclear Regulatorv Commission Mr. L. A. Reyes, Regional Administrator Mr. S. D. Bloom, NRR Project Manager - Vogtle Mr. J. Zeiler, Senior Resident Inspector - Vogtle

Enclosure Vogtle Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity"

Enclosure Vogtle Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" During the recent fall 2003 refueling outage (IRI 1) at Unit I of the Vogtle Electric Generating Plant (VEGP-1), Southern Nuclear Operating Company (SNC) completed a bare metal visual examination of the Alloy 600 nozzles penetrating the bottom head of the reactor pressure vessel (RPV) and a general inspection of the bottom head area. Pursuant to NRC Bulletin 2003-02, "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity," issued to the SNC on August 21, 2003, SNC hereby responds to the 60-day inspection summary request set forth in NRC Request 2 of the Bulletin with respect to VEGP-1.

VEGP-1 returned to on-line service on October 22, 2003.

NRCRequest: Within 60 days ofplant restartfolloivingileinext inspection ofthe RPVlowter headpenetrations,the subject PJER addresseesshouldsubinit to the ANRC a sumnmiary of the inspectionsperformed, the extent of the inspections, the methods used, a description of the as-found condition of the lower head,anyfindings of relevant indications of t/irough-wallleakage, and a summary of the disposition of anyfindings of boric aciddeposits and any corrective actions taken as a result of indicationsfound:

SNC Response:

Examination:

A remote visual examination was performed on the outer surface of the RPV bottom closure head during the recent fall refueling outage (RFO-IRI 1) at VEGP-1 with a resolution capability at least equivalent to that obtained by direct visual observation. These inspections included a bare metal visual examination of all the Alloy 600 nozzles penetrating the bottom head of the vessel and a general inspection of the bottom head area for indications of wastage or significant corrosion of the low alloy steel vessel. The entire circumference of the interface of each nozzle with the vessel was evaluated for the presence of any deposits that might indicate leakage from the annulus between the nozzle and the head. These inspections were performed as recommended in Materials Reliability Program (MRP) letter MRP 2003-017 dated June 23, 2003.

Results:

No evidence of head material wastage or of leaking or cracked bottom mounted instrumentation (BMI) nozzles was found by bare metal visual examination of the RPV bottom head. However, a V-shaped rust stain was identified during inspection of the BMI Penetrations. The rust stain was oriented below the Loop 3 Cold Leg (CL) and extended from the bottom of the RPV up the side approximately 10 feet. To identify the cause of the rust, an inspection and sampling plan was developed. The plan included inspections and sampling around the Loop 3 CL and the bottom of the RPV. To inspect the Loop 3 CL, the sheet metal insulation was loosened and the insulation blankets were inspected. No boron residue or rust was visible on the bare metal at the nozzle transition region. Wet swipe samples were collected from the Loop 3 CL nozzle area. The bottom of the RPV was also inspected, areas around the bottom mounted instrumentation tubes in the rusted area were sampled with a wet swipe, and loose particles were removed with a scotch brite pad. Isotopic analysis of the samples (wet swipes and loose particles) determined that the NL-03-2394 PagelI of 3

Enclosure Vogtlc Electric Generating Plant Unit I 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" rust contained particulate with a nuclide signature similar to Refueling Water Storage Tank water from 5.7 and 6.9 years ago. Refuelings 1R6 and IR7 occurred during this time period. The samples were also analyzed for boron and lithium. This analysis identified low levels of boron, but the results for lithium were below detectable limits. The sample analysis supports the conclusion that the rust was caused by a water leak from the refueling cavity during outage activities and not by Reactor Coolant System leakage.

Cause:

The size and location of the rust stain indicates that the rust was caused by water flowing down the reactor vessel. Due to the high temperature of the reactor vessel during power operations, this could only occur during refueling conditions. Located directly above each RPV loop nozzle is a ventilation port that is sealed during refueling to allow reactor cavity flooding. Based on sample analysis and review of applicable design drawings, it was concluded that one of these ventilation ports was leaking which resulted in water spraying onto the reactor vessel insulation and eventually flowing down the side of the reactor pressure vessel resulting in surface rusting of the RPV.

Corrective Actions:

Since the rust posed no threat to RPV integrity, only minor hand cleaning in the area of the BMI tubes was performed to facilitate future inspections.

Safety Significance:

The rust was determined to be minor surface rust that had no impact to reactor pressure vessel integrity.

Documentation:

The examination performed was documented by a written report supplemented by video and photographic images supporting the examination findings. This report also provides a baseline for future examinations.

Additional Inspection:

In addition to the bare metal visual examination of the RPV bottom head, a bare metal visual examination of > 99% of the RPV top head surface including 3600 around each RPV head penetration nozzle was performed. No evidence of head material wastage or of leaking or cracked nozzles was found by bare metal visual examination of the RPV top head. Scope of this examination was not 100% of the head surface because of the small area (<I%) of the head made inaccessible by the shroud support structure and insulation. However, a modification to the insulation was performed prior to the examination in order to make accessible a larger portion of the RPV top head. The examination was documented by a written report supplemented by video NL-03-2394 . Page 2 of 3

- S -

Enclosure Vogtle Electric Generating Plant Unit 1 60-day Response to NRC Bulletin 2003-02 "Leakage From Reactor Pressure Vessel Lower Head Penetrations and Reactor Coolant Pressure Boundary Integrity" and photographic images supporting the examination findings. This report also provides an up-dated baseline for future examinations.