|
---|
Category:Code Relief or Alternative
MONTHYEARML23150A0802023-05-30030 May 2023 Acceptance Review - Vogtle Units 1 and 2 - Proposed LAR and Relief Request to Revise TS 3.4.14.1 and IST ALT-VR-02 (EPIDs L-2023-LLA-0061 and L-2023-LLR-0023) ML23095A2962023-04-14014 April 2023 Alternative Inspection Requirements for Steam Generator Nozzle to Reactor Coolant Pump Casing Welds (Vegp 3&4-Isi1- Alt-17) ML22259A1822022-09-22022 September 2022 Request for Proposed Inservice Testing Alternative ALT-VR-01 ML22118A0762022-05-13013 May 2022 Cover Letter for Vogtle Electric Generating Plant, Units 3 and 4 Request for Alternative Requirements for Inservice Test Interval Code Edition (VEGP 3&4-IST-ALT-01R2) ML22021A0012022-01-24024 January 2022 Relief Request for Proposed Alternative Requirements for the Repair of Reactor Vessel Head Penetrations for the Fourth 10-Year Inservice Inspection Interval, VEGP-ISI-ALT-04-05, Version 1.0 ML21154A2122021-06-0303 June 2021 Enclosure 1 - Vogtle Electric Generating Plant (VEGP) Unit 3 Proposed Alternative in Accordance with 10 CFR 50.55a(z)(1): Alternative Requirements for ASME Section III Remediation of Containment Vessel Unistrut Welding (VEGP 3-ALT-16) ML21154A2132021-06-0303 June 2021 Enclosure 2 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14162(VEGP 3-ALT-16) ND-21-0392, Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16)2021-06-0303 June 2021 Enclosure 3 - Vogtle Electric Generating Plant (VEGP) Unit 3 CB&I Procedure Qualification Record 14163 (VEGP 3-ALT-16) ML21040A1652021-02-0909 February 2021 (Vegp), Units 3 and 4, Revision to Proposed Alternative in Accordance with 10 CFR 50.55a(z)(2): Alternative Requirements for ASME Section XI Examination Coverage of Weldolet Branch Connection Welds ML20352A1552021-01-11011 January 2021 Proposed Relief Request for Alternative VEGP-ISI-ALT-04-04 to the Requirements of the ASME Code ML20307A1412020-11-12012 November 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal NL-20-1262, Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion2020-10-30030 October 2020 Submission of Proposed Alternative to Submitting Vogtle Unit 2 Inservice Inspection Summary Report within 90 Days of Outage Completion ML20216A3992020-08-0606 August 2020 Relief Request to Use a Provision of a Later Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code, Section XI ML20143A2332020-06-0303 June 2020 Relief Request for Deferral of ASME Boiler and Pressure Vessel Code, Section XI, Required Summary Report Submittal (EPID L-2020-LLR-0074 (COVID-19)) ML20132A1532020-05-14014 May 2020 ASME Code Alternative - May 14, 2020 Presubmittal Technical Exchange for Preservice Inspection (PSI) Alternative ML20034E8942020-02-11011 February 2020 Relief Request Gen-ISI-ALT-2019-01 for Proposed Alternative to Use of ASME Code Case N-831-1, Ultrasonic Examination in Lieu of Radiography for Welds in Ferritic or Austenitic Pipe Section XI, Division 1 ND-20-0083, Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1)2020-02-0606 February 2020 Revision to Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01R1) ND-19-1294, Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)2019-10-31031 October 2019 Request for Alternative: Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) ML18320A0192018-11-30030 November 2018 Relief Request Regarding Examination Coverage for Certain ASME Code Class 2 Category Welds (VEGP-ISI-RR-05) ML18296A7172018-10-31031 October 2018 Relief Request Regarding Examination Coverage for Certain Pressurizer and Steam Generator Welds (VEGP-ISI-RR-03) ND-18-1158, Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1)2018-08-30030 August 2018 Revision to Request for Alternative: Alternative Requirements for Preservice Examination Volumetric Surface Configuration Requirements (VEGP 3&4-PSI/ISI-ALT-10R1) NL-18-0428, Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-12018-04-0909 April 2018 Withdrawal of Proposed Alternative GEN-ISI-ALT-2017-001 Implementation of Code Case N-786-1 ML18054A0652018-03-0505 March 2018 Cover Letter - Vogtle Electric Generating Plant - Request for Alternative (ALT-9) ML17171A1022017-06-27027 June 2017 Inservice Inspection Alternative Regarding Category B-N-2 and B-N-3 Welds (VEGP ISI ALT 13) ML17061A2022017-03-17017 March 2017 Request for Alternative RR-PR-03 Regarding Nuclear Service Cooling Water Pump Instrument Accuracy ML17037D0502017-02-17017 February 2017 and 2; Request to Use Asme Code Case OMN-18 as an Alternative to Inservice Testing Requirements (CAC Nos. MF8188 and MF8189) NL-17-0101, Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule2017-01-26026 January 2017 Proposed Alternative VEGP-ISI-AL T-13 in Accordance with 10 CFR 50.55a(z)(2) to Extend B-N-2 and B-N-3 Inservice Inspection Examinations Schedule ML17006A1092017-01-26026 January 2017 Alternative to Inservice Inspection Regarding Reactor Pressure Vessel Threads Inflange Inspection ML16326A0442016-12-0808 December 2016 Alternative for Pump and Valve Inservice Testing Program ML16264A3212016-10-14014 October 2016 Alternatives for Pumps and Valves Inservice Testing Program ML14030A5702014-03-20020 March 2014 Request for Alternatives VEGP-ISI-ALT-06 ML13123A1602013-05-0707 May 2013 (VEGP) - Safety Evaluation of Relief Request VEGP-ISI-ALT-09, Version 2.0, Regarding Leakage Tests for Reactor Coolant Pressure Boundary Components ML13032A1062013-02-0707 February 2013 Safety Evaluation of Relief Request VEGP-ISI-ALT-08, Version 1, Regarding Installation of a Mechanical Clamp on a Class 1 Valve - Fourth 10-Year Interval ML1009001292010-06-11011 June 2010 Relief Requests VEGP-ISI-ALT-04 (Units 1 and 2) and VEGP-ISI-RR-01 (Unit 2) Inservice Inspection Alternatives for Third and Subsequent Inservice Inspection Intervals (TAC Nos. ME2226, ME2227, and ME1134) ML1012000882010-04-30030 April 2010 Acceptance of Vogtle Relief Request (VEGP-ISI-ALT-03) Dated April 7, 2010 NL-09-1410, VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii)2009-09-0909 September 2009 VEGP-ISI-RR-01, Version 1.0, Relief Request in Accordance with 10 CFR 50.55a(g)(5)(iii) ML0731004352007-11-15015 November 2007 Third 10-Year Interval, Inservice Program Relief Request RR-V-1 (Tac Nos. MD5409 and MD5410) ML0627703592006-09-29029 September 2006 Evaluation of Relief Request ISI-GEN-ALT-06-02 NL-06-1713, Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays2006-08-10010 August 2006 Proposed Alternative for Application of Pressurizer Nozzle Full-Structural Weld Overlays ML0510301992005-04-25025 April 2005 RR, ISI Program Intervals for Alternative Alignment of Iwe/Iwl Inspection Program (Tac No. MC4870, MC4871, MC4872, MC4873, MC4874, MC4875) ML0332800372003-11-21021 November 2003 Safety Evaluation Re. Request to Use ASME Code Case N-661 ML0225904572002-09-16016 September 2002 Code Relief, Relief Request for the Second Ten-Year Interval Inservice Testing Program 2023-05-30
[Table view] Category:Letter type:ND
MONTHYEARND-24-0019, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-02-0101 February 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0912, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2024-01-0202 January 2024 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0881, Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-12-0404 December 2023 Submittal of Vogtle Electric Generating Plant (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0817, (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a)2023-11-17017 November 2023 (Vegp), Units 3 and 4 - Report of UFSAR Chapter 14 Changes to the Initial Test Program in Accordance with License Condition 2.D.(7)(a) ND-23-0823, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-11-0303 November 2023 Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0723, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-10-0404 October 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0697, (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-09-0505 September 2023 (Vegp), Unit 4, Submittal of Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0669, (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule2023-08-0707 August 2023 (Vegp), Unit 4, Combined License (COL) Operational Programs and Other License Conditions Implementation Schedule ND-23-0205, (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests2023-07-28028 July 2023 (Vegp), Unit 3 - Combined License (COL) License Condition 2.D.(5)(d) Completion of Power Ascension Tests ND-23-0618, Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797)2023-07-20020 July 2023 Resubmittal of ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.07c.ii.a (Index Number 797) ND-23-0609, Notification of Completion of All ITAAC2023-07-20020 July 2023 Notification of Completion of All ITAAC ND-23-0608, ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.03.03 (Index Number 72) ND-23-0607, ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.02.02a (Index Number 13) ND-22-0796, ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813)2023-07-20020 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.3.00.08 (Index Number 813) ND-23-0459, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04d (Index Number 587) ND-23-0162, ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165)2023-07-19019 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.03.05a.i (Index Number 165) ND-23-0575, ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.01.04e (Index Number 588) ND-23-0439, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07a.i (Index Number 265) ND-23-0552, Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624)2023-07-18018 July 2023 Southern Nuclear Operating Company, Vogtle Electric Generating Plant, Unit 4, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02c (Index Number 624) ND-23-0483, ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4)2023-07-18018 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.1.01.04 (Index Number 4) ND-23-0586, ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159)2023-07-17017 July 2023 ITAAC Closure Notice on Completion of ITAAC 2.2.03.02a (Index Number 159) ND-23-0610, ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603)2023-07-17017 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.03.04c (Index Number 603) ND-23-0573, ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of 2.4.02.02a (Index Number 497) ND-23-0406, ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498)2023-07-16016 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.4.02.02b (Index Number 498) ND-22-0816, ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19)2023-07-15015 July 2023 ITAAC Closure Notification of Completion of ITAAC 2.1.02.05a (Index Number 19) ND-23-0603, ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 3.5.00.06 (Index Number 831) ND-23-0446, ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.12a.iii (Index Number 250) ND-23-0594, ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.05.02.ii (Index Number 629) ND-23-0601, ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.7.05.02.i (Index Number 719) ND-23-0606, ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.04.02.i (Index Number 557) ND-23-0476, ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.06.02a (Index Number 355) ND-23-0499, ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700)2023-07-15015 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.01.14 (Index Number 700) ND-23-0588, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.07.i (Index Number 78) ND-23-0121, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.07 (Index Number 667) ND-23-0122, ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC C.2.6.09.08a (Index Number 668) ND-23-0597, ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.5.02.06a.ii (Index Number 530) ND-23-0002, ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270)2023-07-14014 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.05.07c (Index Number 270) ND-23-0111, ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.05c (Index Number 646) ND-22-0980, ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.1.03.06.i (Index Number 75) ND-23-0587, ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.02.02c (Index Number 595) ND-23-0461, ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.09.13a (Index Number 652) ND-23-0543, ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.6.04.02a (Index Number 622) ND-23-0394, ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703)2023-07-13013 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.7.02.03a (Index Number 703) ND-23-0592, ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of 2.7.06.03.i (Index Number 726) ND-23-0589, ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.6.03.04a (Index Number 601) ND-23-0581, ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220)2023-07-12012 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.04.02a (Index Number 220) ND-23-0486, ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117)2023-07-11011 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.2.01.11a.iv (Index Number 117) ND-23-0559, CFR26.719(c)(1) 30-Day Report for a Blind Sample Analysis Error2023-07-11011 July 2023 CFR26.719(c)(1) 30-Day Report for a Blind Sample Analysis Error ND-23-0443, ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC 2.3.10.07a.ii (Index Number 444) ND-23-0183, ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454)2023-07-0808 July 2023 ITAAC Closure Notification on Completion of ITAAC Item 2.3.11.03b (Index Number 454) 2024-02-01
[Table view] |
Text
B. H. Whitley Southern Nuclear Director Operating Company, Inc.
Regulatory Affairs 3535 Colonnade Parkway Birmingham, AL 35243 Tel 205.992.7079 October 31, 2019 Docket Nos.: 52-026 ND-19-1294 10 CFR 50.55a U.S. Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001 Southern Nuclear Operating Company Vogtle Electric Generating Plant Unit 4 Request for Alternative:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)
Ladies and Gentlemen:
Pursuant to 10 CFR 50.55a(z)(1), Southern Nuclear Operating Company (SNC) hereby requests NRC authorization to use an alternative to the requirements of 10 CFR 50.55a(f)(4)(i) and 10 CFR 50.55a(f)(4)(ii) regarding use of the latest edition and addenda of the ASME Operation and Maintenance of Nuclear Power Plants (OM) Code used in initial and successive inservice test (IST) intervals. The ASME OM Code has the same requirements for establishing the Code Edition for the Initial Inservice Test Interval (in ISTA-3200(f)(2)), and Successive Inservice Test Intervals (in ISTA-3200(f)(3)). The proposed request for alternative would establish initial and successive Vogtle Unit 4 IST intervals concurrent with the associated initial and successive Vogtle Unit 3 IST intervals.
IST plans for each interval will be combined into a single plan for both units.
The details of the 10 CFR 50.55a(z)(1) request are contained in Enclosure 1 to this letter. provides the associated licensing basis markups.
Approval is requested by April 30, 2020 to support finalization of the Unit 4 Inservice Testing Program 12 months prior to Unit 4 fuel load. SNC expects to implement the changes afforded by this alternative 12 months prior to Unit 4 fuel load.
This letter contains no regulatory commitments. This letter has been reviewed and confirmed to contain no security-related information. Should you have any questions, please contact Mr. Adam Quarles at (205) 992-7031.
U.S. Nuclear Regulatory Commission ND-19-1294 Page 2 of 4 I declare under penalty of perjury that the foregoing is true and correct. Executed on the 31st day of October 2019.
Respectfully submitted, SOUTHERN NUCLEAR OPERATING COMPANY Director, Regulatory Affairs Southern Nuclear Operating Company : Request for Alternative:
Alternative Requirements for lnservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01) : Proposed Licensing Basis Markups:
Alternative Requirements for lnservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)
U.S. Nuclear Regulatory Commission ND-19-1294 Page 3 of 4 cc:
Southern Nuclear Operating Company / Georgia Power Company Mr. S. E. Kuczynski (w/o enclosures)
Mr. P. P. Sena III (w/o enclosures)
Mr. M. D. Meier (w/o enclosures)
Mr. D. H. Jones (w/o enclosures)
Mr. G. Chick Mr. M. Page Mr. D. L. McKinney (w/o enclosures)
Mr. T. W. Yelverton (w/o enclosures)
Mr. B. H. Whitley Ms. C. A. Gayheart Mr. C. R. Pierce Ms. M. Ronnlund Mr. D. L. Fulton Mr. M. J. Yox Mr. C. T. Defnall Mr. J. Tupik Ms. S. Agee Mr. M. Humphrey Ms. A. C. Chamberlain Mr. S. Leighty Mr. N. Kellenberger Mr. E. Riffle Ms. K. Roberts Mr. J. Haswell Mr. D. T. Blythe Document Services RTYPE: VND.LI.L00 File AR.01.02.06 Nuclear Regulatory Commission Mr. M. King (w/o enclosures)
Mr. W. Jones (w/o enclosures)
Mr. V. Hall Mr. C. Patel Mr. C Santos Mr. B. Kemker Mr. G. Khouri Ms. S. Temple Mr. C. J. Even Mr. A. Lerch Mr. S. Walker Mr. N.D. Karlovich Ms. N. C. Coovert Mr. C. Welch Mr. J. Gaslevic Ms. K. P. Carrington Mr. M. Webb Mr. P.J. Heher
U.S. Nuclear Regulatory Commission ND-19-1294 Page 4 of 4 State of Georgia Mr. R. Dunn Oglethorpe Power Corporation Mr. M. W. Price Ms. A. Whaley Municipal Electric Authority of Georgia Mr. J. E. Fuller Mr. S. M. Jackson Dalton Utilities Mr. T. Bundros Westinghouse Electric Company, LLC Mr. L. Oriani (w/o enclosures)
Mr. T. Rubenstein (w/o enclosures)
Mr. M. Corletti Mr. M. L. Clyde Mr. D. Hawkins Mr. J. Coward Other Mr. S. W. Kline, Bechtel Power Corporation Ms. L. A. Matis, Tetra Tech NUS, Inc.
Dr. W. R. Jacobs, Jr., Ph.D., GDS Associates, Inc.
Mr. S. Roetger, Georgia Public Service Commission Ms. S. W. Kernizan, Georgia Public Service Commission Mr. K. C. Greene, Troutman Sanders Mr. S. Blanton, Balch Bingham NDDocumentinBox@duke-energy.com, Duke Energy Mr. S. Franzone, Florida Power & Light
Southern Nuclear Operating Company ND-19-1294 Enclosure 1 Vogtle Electric Generating Plant (VEGP) Unit 4 Request for Alternative:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)
(This enclosure consists of 4 pages, including this cover page.)
ND-19-1294 Request for Alternative:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-Alt-01)
Plant Site-Unit: Vogtle Electric Generating Plant (VEGP) - Unit 4 Interval-Interval Applies to the all inservice test (IST) intervals for Unit 4.
Dates:
Requested Date for Authorization is requested by April 30, 2020.
Approval:
ASME Code Components All components in the IST program.
Affected:
Applicable ASME Operation and Maintenance of Nuclear Power Plants (OM)
Code Edition Code, 2012 Edition for 1st Inservice Test Interval.
and Addenda:
10 CFR 50.55a(f)(4)(i) requires the ASME OM Code edition and addenda for the initial IST interval be the latest edition and addenda incorporated by reference in 10 CFR 50.55a(a)(1)(iv) 12 months before the date scheduled for initial loading of fuel under a combined license under 10 CFR part 52.
Applicable 10 CFR 50.55a(f)(4)(ii) requires that the ASME OM Code edition and Code addenda for successive IST intervals be that incorporated by reference Requirements: in paragraph 10 CFR 50.55a(a)(1)(iv) 12 months before the start of the 120-month interval.
The OM Code, ISTA-3200 has the same requirements for establishing the Code Edition for the Initial Inservice Test Interval (in ISTA-3200(f)(2)), and Successive Inservice Test Intervals (in ISTA-3200(f)(3)).
With a one year gap between the scheduled fuel loadings (and Reason for subsequent IST intervals) of Vogtle Unit 3 and Unit 4, there is the Request: possibility that the Code Edition required for the Inservice Test program plan will be different between the two units. Because the two units are nearly identical, the Combined License application was for both units, and both units share a common UFSAR, it would create inconsistencies between the two units that would increase the complexity of the UFSAR Page 2 of 4
ND-19-1294 Request for Alternative:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-Alt-01) and testing programs that would increase the probability of human error in implementing and maintaining two different programs.
To minimize the problems of maintaining two separate IST Programs, it would be preferable to have both IST Programs be developed to the Code Edition and Addenda required for the lead unit (Unit 3).
Based on the current scheduled initial loading of fuel for Unit 3 being November 23, 2020, and the current schedule for addition of ASME OM Code Editions to 10 CFR 50.55a being late February 2020, the current latest edition of the OM Code listed in 10 CFR 50.55a (2012 Edition) would be used for establishing the initial 120-month interval IST Programs for Vogtle 3 & 4.
Proposed Alternative:
In lieu of the requirements of 10 CFR 50.55a(f)(4)(i), for establishing the ASME OM Code edition and addenda for the initial Inservice Test interval, or 10 CFR 50.55a(f)(4)(ii) for establishing the ASME OM Code edition and addenda for subsequent inservice test intervals, and the equivalent requirements in ISTA-3200(f)(2) & (3), it is proposed that the Code Edition for each Unit 4 IST Interval be the same edition and/or addenda as established for the associated Unit 3 Interval (which will be established in accordance with 10 CFR 50.55a(f)(4)(i) or (ii)). Inservice Test Plans for each Interval will be combined into a single plan for both Units.
Basis for Use:
Maintaining both units on the same interval schedule allows both IST programs to be developed utilizing the same edition of the applicable Proposed Codes, which will make it less complicated for involved personnel to Alternative and become familiar with the Code requirements, will ensure a greater Basis for Use:
degree of consistency for IST between the units, and will reduce the effort associated with surveillance procedure revisions for the program update and for maintenance of the program documents.
The Code of Record established for Unit 3 is in accordance with the 10 CFR 50.55a requirements and represents requirements established by the NRC to ensure the equipment is adequately tested to ensure safe plant operation. Applying a common Code edition to both Unit 3 and Unit 4 would establish common requirements which would minimize potential errors caused by having to maintain two separate program requirements for the 2 units. Additionally, based on the version of the Code anticipated for Unit 3 IST program, the units will use the same Code Edition as that used for Preservice testing, which will ensure consistency of Preservice to Inservice testing.
Per NUREG-1482, Rev. 2, Basis for 3.3.2, Concurrent Intervals states The staff believes that conducting IST programs for multiple unit sites Page 3 of 4
ND-19-1294 Request for Alternative:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-Alt-01) using the same Code edition could provide an improvement in program effectiveness.
Based on the above, the proposed alternative provides an equivalent level of quality and safety in accordance with 10 CFR 50.55a(z)(1).
Duration of Proposed Life of the plant.
Alternative:
- 1. Vogtle 1 & 2 General Relief Request RR-G-2 (Legacy Accession Number 9608200192).
- 2. NRC Approval letter for RR-G-1 & RR-G-2, dated 11/27/1996
References:
(Legacy Accession Number 9612020101)
- 3. NUREG-1482, Rev. 2, Section 3.3.2, Concurrent Intervals.
Status: Awaiting NRC authorization Page 4 of 4
Southern Nuclear Operating Company ND-19-1294 Enclosure 2 Vogtle Electric Generating Plant (VEGP) Unit 4 Proposed Licensing Basis Markups:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-ALT-01)
Insertions noted by blue underline
- Denotes omitted material (This enclosure consists of 2 pages, including this cover page.)
ND-19-1294 Proposed Licensing Basis Markups:
Alternative Requirements for Inservice Test Interval Code Edition, Unit 4 (VEGP 3&4-IST-Alt-01)
Revise UFSAR Subsections 3.9.3.4.4 and 3.9.6 to specify that the initial inservice testing program incorporates the edition and addenda of the ASME OM Code as follows:
3.9.3.4.4 Inspection, Testing, Repair, and/or Replacement of Snubbers
- b. Snubber Installation Requirements The initial inservice testing program incorporates the latest edition and addenda of the ASME OM Code approved in 10 CFR 50.55a(f) on the date 12 months before initial Unit 3 fuel load.
Limitations and modifications set forth in 10 CFR 50.55a are incorporated.
3.9.6 Inservice Testing of Pumps and Valves The initial inservice testing program incorporates the latest edition and addenda of the ASME OM Code approved in 10 CFR 50.55a(f) on the date 12 months before Unit 3 initial fuel load.
Page 2 of 2