ML26048A759

From kanterella
Jump to navigation Jump to search
Project Long Mott Docs - (External_Sender) X-energy Slides
ML26048A759
Person / Time
Site: 05000614
Issue date: 06/28/2023
From:
- No Known Affiliation
To:
NRC/NRR/DANU
References
Download: ML26048A759 (0)


Text

From:

Ingrid Nordby <inordby@x-energy.com>

Sent:

Wednesday, June 28, 2023 12:16 PM To:

Patricia Vokoun

Subject:

[External_Sender] X-energy slides Attachments:

NRC Presentation - ARDP Env June 2023.pdf Here are the slides that were developed for the meeting originally scheduled for June 22.

Thanks!

Ingrid Nordby License Application Project Manager inordby@x-energy.com This message (including any attachments) is intended only for the use of the individual or entity to which it is addressed and may contain information that is non-public, proprietary, privileged, confidential, and exempt from disclosure under applicable law or may constitute attorney work product. If you are not the intended recipient, you are hereby notified that any use, dissemination, distribution, or copying of this communication is strictly prohibited. If you have received this communication in error, notify us immediately and delete this message immediately. Thank you. X Energy, LLC

Hearing Identifier:

XeDOW_ProjectLongMott_SafPublic Email Number:

541 Mail Envelope Properties (BN2P110MB1431C6B10616746D7B666C5E8724A)

Subject:

[External_Sender] X-energy slides Sent Date:

6/28/2023 12:16:08 PM Received Date:

6/28/2023 12:16:33 PM From:

Ingrid Nordby Created By:

inordby@x-energy.com Recipients:

"Patricia Vokoun" <Patricia.Vokoun@nrc.gov>

Tracking Status: None Post Office:

BN2P110MB1431.NAMP110.PROD.OUTLOOK.COM Files Size Date & Time MESSAGE 904 6/28/2023 12:16:33 PM NRC Presentation - ARDP Env June 2023.pdf 2174038 Options Priority:

Normal Return Notification:

No Reply Requested:

No Sensitivity:

Normal Expiration Date:

© 2023 X Energy, LLC, all rights reserved 1

© 2023 X Energy LLC, all rights reserved 1

ARDP Dow Site Environmental Approach Milton Gorden, Siting and Environmental Manager June 22, 2023

© 2023 X Energy, LLC, all rights reserved 2

Department of Energy Acknowledgement and Disclaimer This material is based upon work supported by the Department of Energy under Award Number DE-NE0009040. This report was prepared as an account of work sponsored by an agency of the United States Government. Neither the United States Government nor any agency thereof, nor any of their employees, makes any warranty, express or implied, or assumes any legal liability or responsibility for the accuracy, completeness, or usefulness of any information, apparatus, product, or process disclosed, or represents that its use would not infringe privately owned rights. Reference herein to any specific commercial product, process, or service by trade name, trademark, manufacturer, or otherwise does not necessarily constitute or imply its endorsement, recommendation, or favoring by the United States Government or any agency thereof. The views and opinions of authors expressed herein do not necessarily state or reflect those of the United States Government or any agency thereof.

© 2023 X Energy, LLC, all rights reserved 3

Safety Moment Site Overview Purpose and Need Alternatives Analysis Approach Site Characterization Activities Noninvasive Activities Meteorological Data Sources and Tower Approach to Geotechnical Investigations and Preliminary Safety Analysis Report (PSAR) related Groundwater Wells Environmental Report and PSAR Chapter 2 Submission Schedule Department of Energy Office of Clean Energy Demonstrations (DOE OCED)

National Environmental Policy Act (NEPA) Actions Associated with the Project Agenda Objectives:

  • NRC Staff familiarity with the Proposed Xe-100 Site Location adjacent to Dow Seadrift Operations (SDO)
  • NRC feedback on use of nearby sources of data related to the South Texas Project, Victoria County Station, and nearby airports
  • NRC Staff familiarity with general site hazards to be assessed
  • NRC Staff feedback on Purpose and Need and Alternative Sites
  • NRC Staff update on site characterization activities and feedback on meteorological data usage
  • NRC Staff feedback on Environmental Report (ER) and PSAR Chapter 2 submission schedule
  • NRC Staff update on DOE OCED NEPA activities

© 2023 X Energy, LLC, all rights reserved 4

THIS IS SDO How can we work together to solve todays complex challenges?

PEOPLE EMPLOYED MANUFACTURING UNITS FOOTPRINT ANNUAL PRODUCTION

~1,400 11 Units 4700 acres 4B Lbs.

+1 iPark (Braskem/WatCo)

Construction began in 1952 with initial startup in 1954.

Joined Dow with Union Carbide Corp. Merger in 2001 of people leaders participate in Dow ERGs Site History Employee Resource Group (ERG) Participation Products 40+

Our products are shipped through rail, barge, and truck Approaching 70 years of community partnership 10 Dow ERGs 100%

Products Made Added F-Unit in 2017 (formerly DuPont)

Continuous (24 Hour) Operations ADN/MENA DEN GAAN GLAD HLN RISE PR!ME VetNet WIN ADN/MENA-Asianandmiddleeast/northAfricannetwork DEN-Disabilityemployeenetwork GAAN-AfricanAmericannetwork GLAD-LBGTQ+network HLN-HispanicLatinoNetwork RISE-newemployees PR!ME-experiencedemployees VetNet - veteransnetwork WIN-Womensnetwork

© 2023 X Energy, LLC, all rights reserved 5

Dow Seadrift Location

© 2023 X Energy, LLC, all rights reserved 6

Proposed Site

© 2023 X Energy, LLC, all rights reserved 7

Distance and Elevation in Relation to Nearby Facilities Facility Approximate Distance from Site A -

Miles (kilometers)

General Elevation above Sea Level -

Feet (meters)

Xe-100 at Site A n/a 27 (8)

South Texas Project (STP) 48 (77) 29 (9)

Victoria County Station (VCS) 17 (27) 80 (24)

Victoria Regional Airport 25 (40) 115 (35)

Port Lavaca Airport 10 (16) 30 (9)

STP - Nearest operating Nuclear Power Plant. Two Westinghouse 1280 MWe Pressurized Water Reactors VCS - Exelon-proposed two 1535 MWe General Electric-Hitachi Simplified Boiling Water Reactors (application accepted by the NRC but withdrawn by Exelon in 2012)

© 2023 X Energy, LLC, all rights reserved 8

10 CFR 50.34, Xe-100 Principal Design Criteria (PDC) 2, 10 CFR 100.20(b)(c), 10 CFR 100.21(d)(e), 10 CFR 100.23 - Requires man-made hazards and environmental hazards to be evaluated NUREG-0800, Chapter 2 Uses a traditional approach Provides guidance on evaluating man-made hazards, meteorological hazards, floods, potential dam failures, surge and seiche flooding, tsunami hazards, ice effects, seismic, etc.

Uses deterministic-based evaluations that tend to be conservative NEI 18-04 Uses a risk-informed performance-based approach (X-energy will be FOAK user)

PSAR Chapter 6 identifies the Design Basis Hazard Levels (DBHLs)

DBHLs are limits that the Safety-related (SR) SSCs must withstand Hazard screening technical requirements allow hazards to be screened out of the PRA For example, hazards < 10-7/plant-year can be screened out Draft Interim Staff Guidance, DANU-ISG-2022-02, Advanced Reactor Content of Application Project, Chapter 2, Site Information, May 2023 License Basis Event (LBE) selection methodology was addressed in the NEI 18-04 Licensing Topical Report (Revision 2 received a Safety Evaluation from the NRC). Pre-submittal meeting for Chapter 3 content planned for summer 2023.

LBE analysis methodology will be addressed more fully in Licensing Topical Report Transient and Safety Analysis Methodologies to be submitted to the NRC in November 2023.

Hazard assessment approach in PSAR Chapter 2 planned to be presented to the NRC Staff in September 2023 Hazard Analysis Regulatory Basis

© 2023 X Energy, LLC, all rights reserved 9

Probable Maximum Storm Surge (PMSS)

PMSS event for this site would be a probable maximum hurricane Analysis will assume storm surge, high tide, and sea level rise due to climate change in next 60 years consistent with NUREG/CR-7046, Design-Basis Flood Estimation for Site Characterization at Nuclear Power Plants in the Unites States of America, and latest technical reports from the National Oceanic and Atmospheric Administration and Intergovernmental Panel on Climate Change Probable Maximum Flood (PMF) in Streams and Rivers Will address the Guadalupe River Basin Includes wind set-up and wave run-up Uses information from Victoria County Station to develop the Design Basis Hazard Level (DBHL)

Dam Failure 29 dams on Guadalupe River in Calhoun County, TX Assume largest dam failure Will use Victoria County Station analysis as a basis to develop the DBHL Probable Maximum Precipitation (PMP)

Will assume all storm drains, culverts, and catch basins are clogged For a 6 hour6.944444e-5 days <br />0.00167 hours <br />9.920635e-6 weeks <br />2.283e-6 months <br />, 5.33 in/hr (13.54 cm/hr) rainfall over 10 sq. miles (26 sq. km), the PMP would be 32 inches (81 cm)

Will use same approach as Victoria County Station analysis to develop the DBHL Floods

© 2023 X Energy, LLC, all rights reserved 10 Fixed Large tanks of ammonia Pipeline Two Dow-owned pipelines: Ethylene gas and Ethane Liquid Non-Dow-owned pipeline: Natural gas in a 30-in. pipeline (Enterprise Products Partners LP)

Chemical storage in Railcars Primarily ammonia Detection and isolation features and procedures can address chemical hazard concerns Chemical Hazards

© 2023 X Energy, LLC, all rights reserved 11 Pipelines in Vicinity of Dow Seadrift

© 2023 X Energy, LLC, all rights reserved 12 RG 1.91 states that an explosive overpressure of 1 psid is appropriate for a damage criterion. X-energy may be able to demonstrate some structures can withstand up to 3 psid without loss of function Stationary Blasts Per 49 CFR 179.13, chemical max mass in a railcar would lead to 1 psid overpressure at 0.6 miles and 3 psid overpressure at 0.3 miles (0.5 km)

Dow plant information for postulated overpressures will be incorporated into Xe-100 facility analyses Flammable Vapor Clouds 49 CFR 179.13 max railcar release has a standoff distance of 0.5 miles (0.8 km) to the lower explosive limit Ethane from a pressurized pipe has a standoff distance of 0.22 miles (0.35 km) to the lower explosive limit Ethylene from a pressurized pipe has a standoff distance of 0.67 miles (1.1 km) to the lower explosive limit For the 30-in (0.76 cm) natural gas pipeline, a probabilistic analysis is needed, but is expected to show a 0.5-mile distance is acceptable Explosive Overpressure

© 2023 X Energy, LLC, all rights reserved 13

© 2023 X Energy, LLC, all rights reserved 14 Purpose and Need The purpose of the Xe-100 is to: (1) provide high-quality steam to replace aging steam generating processes at the Dow Seadrift Plant, (2) provide electricity to support Dow Seadrift plant operations, and (3) assist Dow in meeting their corporate decarbonization goal of being carbon neutral by 2050.

Basis of Consideration for Alternative Sites Delivery of Steam Limits Distance of Candidate Sites from Receiving Plant Limiting distance to about 1.5 miles (2.5 km) from interconnection point into processes at receiving plant Would keep site on current Dow-owned property Eliminates many right-of-way impediments associated with being further away Purpose and Need and Site Alternatives Analysis Approach

© 2023 X Energy, LLC, all rights reserved 15 Alternative Sites

© 2023 X Energy, LLC, all rights reserved 16 Site A:

Largest site (344 acres [139 hectares]). Buffered on all sides by Dow property. Current use is agricultural. No historic sites within Site A. Not significantly impacted by existing Dow pipelines. Good proximity to roads. Further from railyard than Site C.

Site B:

Site is split by Dow pipelines. Further from roads than Site A.

Site C:

Adjacent to Dow southwest railyard. Smallest acreage (166 acres [67 hectares]). Potential historic resource on Site C that would need to be investigated.

Site D:

Several underground pipelines, including non-Dow-owned pipelines, would need to be relocated. Possibility of other underground obstructions. Electrical substation proposed.

Site A is the Proposed Site Alternative Site Comparisons

© 2023 X Energy, LLC, all rights reserved 17

© 2023 X Energy, LLC, all rights reserved 18 Ecological Surveys - Winter and Spring completed. No significant observations regarding Endangered or Threatened Species Noise Survey - To be completed by end of July 2023 Historic/Cultural Survey - Plan accepted by Texas State Historic Preservation Officer. Survey to be performed by end of June 2023 Surface Water Quality Sampling - Spring completed. Assuming current Dow Seadrift permitted withdrawal and discharge locations pending further analysis Meteorological Data For Construction Permit Application, intent is to rely on existing data from South Texas Project Same elevation and relative proximity to the Gulf Meteorological tower to be erected using Regulatory Guide 1.23, Meteorological Monitoring Programs for Nuclear Power Plants. Data to be used for Final SAR in Operating License Application (confirmatory)

Environmental Report-related Groundwater Wells - Installation planned to begin in July with monitoring activities beginning in September Geotechnical Investigations and Preliminary SAR-related Groundwater Wells - Boring and groundwater well installation plan drafted. Requesting feedback from the NRC week of July 10, 2023 Site A Characterization Activities

© 2023 X Energy, LLC, all rights reserved 19 Proposed Environmental Report-related Groundwater Well Locations

© 2023 X Energy, LLC, all rights reserved 20

© 2023 X Energy, LLC, all rights reserved 21 Environmental Report (ER)

The ER would be submitted within 6 months of the CPA initial submittal. The current schedule shows submittal by June 2024 The ER will contain all content except 6 months of groundwater data and Spring aquatic data, which will be submitted as a supplement by the end of 2024 PSAR Chapter 2 This chapter would be submitted in unison with the ER in whole, with exception of a complete dataset of groundwater data Initial groundwater modeling will rely on enough data to provide a defensible analysis Groundwater data and updated modeling (if necessary) would be submitted once all data is obtained (or can recommend quarterly submittals of data)

Note: The supplemental groundwater data for the ER and PSAR Chapter 2 would be submitted outside the 6-month window from initial submittal (target: March 2024) of the PSAR as required by 10 CFR 2.101 Environmental Report and PSAR Chapter 2 Submission Schedule

© 2023 X Energy, LLC, all rights reserved 22

© 2023 X Energy, LLC, all rights reserved 23 OCED is addressing site characterization.

Categorical Exclusions for Noninvasive activities (OCED-09040-002-CX)

Subsurface investigations currently being addressed OCED will perform a NEPA review of preconstruction activities (those activities not defined as construction, as described in 10 CFR 50.10(a)(2) and RG 1.206)

OCED has issued a categorical exclusion for non-invasive site characterization activities OCED NEPA evaluation of subsurface characterization activities is ongoing (to include installation of groundwater wells and performing geotechnical and seismic-related investigations)

OCED is performing a streamlined Environmental Assessment to address proposed construction and operational activities associated with the Helium Test Facility, to be located at the Horizon Center in Oak Ridge, Tennessee. The HTF will be a non-nuclear facility. Performance of this NEPA review is not expected to impact the schedule for the construction and operation of the HTF DOE-OCED NEPA Actions Associated with the Project

© 2023 X Energy, LLC, all rights reserved 24 Phone: 301.358.5600 801 Thompson Avenue

  • Rockville, MD 20852 x-energy.com @xenergynuclear X Energy, LLC