ML26048A311

From kanterella
Jump to navigation Jump to search
Reactor Open Allegations by Cy Received: January 2022 - January 2026
ML26048A311
Person / Time
Issue date: 02/18/2026
From: Sandra Mendez
NRC/OE
To:
References
Download: ML26048A311 (0)


Text

  • This table refers to allegations from sources external to the NRC that are still under evaluation.

REACTOR OPEN ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 Arkansas Nuclear One 2

Braidwood 3

1 Browns Ferry 1

1 Brunswick 1

Byron 1

Callaway 1

Calvert Cliffs 1

Catawba 1

1 Clinton 3

2 Columbia Generating Station 2

4 Comanche Peak 1

D.C. Cook 1

Davis-Besse 1

Dresden 1

Farley 3

Fermi 2

Ginna 1

Grand Gulf 2

Harris 2

Limerick 3

1 McGuire 1

1 Millstone 1

Nine Mile Point 1

Oconee 1

Palisades 2

3 1

Palo Verde 1

Point Beach 3

1 Quad Cities 2

5 2

  • This table refers to allegations from sources external to the NRC that are still under evaluation.

REACTOR OPEN ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 River Bend 3

Robinson 1

Saint Lucie 2

Salem/Hope Creek 1

2 Sequoyah 5

1 South Texas Project 1

1 Summer 1

Surry 3

Turkey Point 1

Vogtle AP 1000 2

Waterford 1

2 Watts Bar 3

1 Wolf Creek 2

1

  • This table refers to allegations from sources external to the NRC that are still under evaluation.

NON-OP REACTOR OPEN ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 erraPower - Molten Chloride Fast Reactor (MCFR) 1 Fort Calhoun 1

Hope Creek 2 1

Indian Point 1

Kewaunee 1

Oyster Creek 1

Three Mile Island 2 1

Wilmington, NC 1

Zion 1

  • This table refers to allegations from sources external to the NRC that are still under evaluation.

FUEL FACILITY OPEN ALLEGATIONS BY CY RECEIVED*: January 2022 - January 2026 Site 2022 2023 2024 2025 2026 Framatome, Inc.

1 1

1