Notification of Post-Approval Site Inspection for License Renewal and Request for Information 05000397/2026012
ML26048A264
Person / Time
Site: Columbia 
Issue date: 02/18/2026
From: Saunders A
NRC/RGN-IV/DORS/EB2
To: Schuetz R
Energy Northwest
Saunders A
References
IR 2026012
Download: ML26048A264 (0)


See also: IR 05000397/2026012

Text

February 18, 2026

Robert Schuetz, Chief Executive Officer

Energy Northwest

MD 1023

76 North Power Plant Loop

PO Box 968

Richland, WA 99352

SUBJECT:

COLUMBIA GENERATING STATION - NOTIFICATION OF POST-APPROVAL

SITE INSPECTION FOR LICENSE RENEWAL AND REQUEST FOR

INFORMATION (05000397/2026012)

Dear Robert Schuetz:

On April 20, 2026, the U.S. Nuclear Regulatory Commission (NRC) will begin a Post-Approval

Site Inspection, Phase 3, for License Renewal for your facility. One inspector will perform this

one-week inspection remotely in accordance with NRC Inspection Procedure 71003. This

inspection focuses on activities associated with license renewal: implementation of aging

management programs, regulatory commitments, as well as any tests or inspections of

structures, systems, or components which are only accessible at reduced power levels.

To minimize the inspection impact on the site and to ensure a productive inspection for both

parties, we have enclosed a request for information needed for the inspection. It is important

that all these documents are up to date and complete to minimize the number of additional

documents requested during the preparation and/or the on-site portions of the inspection.

Please provide this information electronically to the lead inspector. The information request has

two groups:

The first group lists information necessary for our inspection scoping and in-office

preparation activities. During the in-office preparation activities, the inspector will identify as

much as possible the information and activities to be reviewed during the inspection.

This information should be provided to the lead inspector.

The schedule for the inspection is as follows:

Off-site Preparation Week: April 13, 2026

Off-site Inspection Weeks: April 20, 2026

R. Schuetz

2

PAPERWORK REDUCTION ACT STATEMENT

This letter contains mandatory information collections that are subject to the Paperwork

Reduction Act of 1995 (44 U.S.C. 3501 et seq.). The Office of Management and Budget (OMB)

approved these information collections (approval number 3150-0011). Send comments

regarding this information collection to the Information Services Branch, Office of the Chief

Information Officer, Mail Stop: T6 A10M, U.S. Nuclear Regulatory Commission, Washington, DC

20555-0001, or by e-mail to Infocollects.Resource@nrc.gov, and to the Desk Officer, Office of

Information and Regulatory Affairs, NEOB-10202, (3150-0011) Office of Management and

Budget, Washington, DC 20503.

PUBLIC PROTECTION NOTIFICATION

The NRC may not conduct nor sponsor, and a person is not required to respond to a request for

information or an information collection requirement unless the requesting document displays a

currently valid OMB control number.

This letter, its enclosure, and your response (if any) will be made available for public inspection

and copying at http://www.nrc.gov/reading-rm/adams.html and at the NRC Public Document

Room in accordance with Title 10 of the Code of Federal Regulations 2.390, Public

Inspections, Exemptions, Requests for Withholding.

Sincerely,

Andrew Saunders, Reactor Inspector

Engineering Branch 2

Division of Operating Reactor Safety

Docket No. 05000397

License No. NPF-21

Enclosure:

1.

License Renewal Phase 3 Document Request

cc w/ encl: GovDelivery Subscriber

Signed by Saunders, Andrew

on 02/18/26

ML26048A264

X

SUNSI Review

By: ATS

X

Non-Sensitive

¨

Sensitive

X

Publicly Available

¨

Non-Publicly Available

OFFICE

RI:DORS/EB2

NAME

ASaunders

SIGNATURE

/RA/

DATE

02/18/26

Enclosure

Enclosure 1

License Renewal Phase 1 Document Requests

Inspection Report: 05000397/2026012

Inspection Dates:

April 20-24, 2026

Inspection Procedure:

IP 71003 Post-Approval Site Inspection for License

Renewal Phase 3

The documents and information requested below should generally be made available to the

inspector for use off-site. Electronic format is the preferred media, preferably in a searchable

format. Electronic media should contain descriptive names and be indexed and hyperlinked to

facilitate ease of use. Information in lists should contain enough information to be easily

understood by someone who has knowledge of light water reactor technology. If electronic

media is made available via an internet based remote document management system, then the

remote document access must allow inspectors to download, save, and print the documents in

the NRC's regional office. Electronic media on compact disc or paper records (hard copy) are

acceptable. At the end of the inspection, the documents in the team's possession will not be

retained.

This document request is based on typical documents that a generic plant might have. As such,

this document request is not meant to imply that any specific plant is required to have all of the

listed documents. In addition, your plant specific document titles may vary from the document

titles listed below. We also request that the information provided be sorted by the list below.

I.

Documents requested prior to off-site inspection April 13, 2026, (Week Prior to

Inspection week)

1.

Provide a list of license renewal commitments linked to the applicable aging

management programs (Lube Oil System, Selective Leaching, Water Control Structures,

and IWE containment ISI), including the completion status for each commitment.

2.

Provide a comprehensive list of aging management programs, along with copies of the

program basis documents and a summary of tracking items for the programs detailed

above.

3.

For aging management programs that were previously open, provide documentation of

completed actions as specified in COLUMBIA GENERATING STATION - LICENSE

RENEWAL PHASE 2 REPORT 05000397/2023011 ML23277A181.

4.

Provide details of Lube Oil System aging management program components that have

been inspected or replaced since the Phase 2 inspection referenced in ML23277A181.

5.

Provide documentation of the Water Control System programs resolution of CR 449773

and procedure ENG-PRG-09.

6.

Provide all procedures, work orders, examination data, drawings, and corrective actions

related to the outer containment vessel shell inspection, as detailed in ML23277A181.

2

II.

Documents requested through the inspection

1.

Copies of any corrective action documents generated because of the inspectors

questions or queries during this inspection.

2.

Copies of the list of questions submitted by the inspector and the status/resolution of the

information requested (please provide daily during the inspection).

If you have questions regarding the information requested, please contact the lead inspector.

Inspector Contact Information:

Andrew Saunders

Reactor Inspector

817-200-1275

Andrew.saunders@nrc.gov

U.S. NRC, Region IV

Attn: Andrew Saunders

1600 East Lamar Blvd.

Arlington, TX 76011-4511