From:
Adrian Muniz Sent:
Tuesday, January 28, 2025 3:23 PM To:
ext_Jessica_Maddocks Cc:
Richard Rivera
Subject:
Completeness determination - X-energy's Plume Exposure Pathway Emergency Planning Zone Sizing Methodology (Revision 1) Topical Report Attachments:
NRC 898 - Plume Exposure Pathway Emergency Planning Zone Sizing Methodology.pdf
- Jessica, Attached is the U.S. Nuclear Regulatory Commission (NRC) staff completeness determination for X-energys Plume Exposure Pathway Emergency Planning Zone Sizing Methodology (Revision 1) topical report. The NRC staff determined that it provided sufficient information for the NRC staff to begin a detailed technical review.
As discussed, the NRC staff plans to issue its draft safety evaluation by January 22, 2026. If needed, the NRC staff will issue a request for additional information (RAI) by July 31, 2025, with a request for X-energy to provide a response within 30 days. The NRC staff estimates that 570 staff hours will be needed to complete the technical review and issue the safety evaluation. The schedule and level of effort could change due to several factors (e.g., the need for additional RAIs, unanticipated changes to the scope of the review, and unsolicited supplements to the topical report). The NRC staff will communicate any significant changes to the review schedule or estimated staff hours, including the reason(s) for the changes.
If you have any questions, please feel free to contact Richard Rivera (NRCs primary point of contact for the review of this topical report) at 301-415-7190 or by email at Richard.Rivera@nrc.gov.
Project No.: 99902071 EPID: L-2024-TOP-0034
- Regards, Adrian Muniz, Senior Project Manager Advanced Reactor Licensing Branch 2 (UAL2)
Division of Advanced Reactors and Non-Power Production and Utilization Facilities (DANU)
Hearing Identifier:
XeDOW_ProjectLongMott_SafPublic Email Number:
171 Mail Envelope Properties (CO6PR09MB7512B39B53A0C9809C788EC68FEF2)
Subject:
Completeness determination - X-energy's Plume Exposure Pathway Emergency Planning Zone Sizing Methodology (Revision 1) Topical Report Sent Date:
1/28/2025 3:23:29 PM Received Date:
1/28/2025 3:23:00 PM From:
Adrian Muniz Created By:
Adrian.Muniz@nrc.gov Recipients:
"Richard Rivera" <richard.rivera@nrc.gov>
Tracking Status: None "ext_Jessica_Maddocks" <>
Tracking Status: None Post Office:
CO6PR09MB7512.namprd09.prod.outlook.com Files Size Date & Time MESSAGE 1549 1/28/2025 3:23:00 PM NRC 898 - Plume Exposure Pathway Emergency Planning Zone Sizing Methodology.pdf 1339046 Options Priority:
Normal Return Notification:
No Reply Requested:
No Sensitivity:
Normal Expiration Date:
NRC FORM 898 (01-2021)
Topical Report Completeness Determination U.S. NUCLEAR REGULATORY COMMISSION NRC FORM 898 (01-2021)
Page 1 of 1 Topical Report Information Report Number:
010229
Title:
Plume Exposure Pathway Emergency Planning Zone Sizing Methodology ADAMS Accession Number:
ML24331A305 EPID:
L-2024-TOP-0034 Docket Number:
99902071 Review Information Office/Division/
Branch:
NRR/DANU/UAL2 NRR/DANU/UTB1 NSIR/DPR/RLB Project Manager:
Richard F. Rivera Reviewers:
T. Drzewiecki, M. Hart, I. Jung, I. Baek, K. Bucholtz, K. Mott, E. Robinson, R. Roche Review Type:
Standard
Compressed ADAMS Accession Numbers (Top row is for transmittal of this form)
Package: ML25024A203 E-mail: ML25024A205 This Form: ML25024A206 Withholding Determination: ML Ongoing Fee Waiver: ML N/A Topical Reports for Review
The NRC staff has performed an acceptance review of the subject topical report. We have found that the material presented is sufficient to begin our review. The dates below are based on current resources, if they change the NRC staff will contact you.
Information for Topical Reports That Are Found Acceptable for Review Issue Dates For Requests for Additional Information: 07/31/2025 Issue Dates For Draft Safety Evaluation: 1/22/2026 Review hours total includes project management and contractor time:
570 Topical Reports Not Acceptable for Review Based on its review of the information provided, the NRC staff cannot find sufficient details in the submittal to allow the staff to evaluate the proposed topical report.
[Only for Use with Topical Reports in Standard Review Process] Although the NRC staff has found the current topical report is not sufficiently detailed to begin our review, the sponsor can supplement the submittal with additional information. The additional information should be submitted within 60 days the date of this form.
Basis for Nonacceptance:
N/A Additional Information Needed:
N/A Approvals Technical Branch Chief Projects Branch Chief Travis L. Tate Digitally signed by Travis L. Tate Date: 2025.01.27 16:43:35 -05'00' John P. Segala Digitally signed by John P. Segala Date: 2025.01.28 08:25:01 -05'00'